VJP CONST is listed as a company organization in Philippine public procurement records on this site, with 7 linked DPWH project(s) totaling about ₱109,799,872.34. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
VJP CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 7
- Total value
- ₱109,799,872.34
- Published flags
- 0
- Region
- Surigao del Sur 1st DEO · Region XIII
Public Record Grade
A transparent, data-derived summary of reported public records for VJP CONST — not an accusation or finding of wrongdoing.
Score: 79.20 / 100 · Projects in sample: 7 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 85.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 85.7
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 7
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 7
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 7
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
7 geotagged project(s) — Open full map
- CONCRETING OF PUROK 2 TO PUROK 5, BRGY. CARROMATA FMR, SAN MIGUEL, SURIGAO DEL SUR22NH0098 · ₱29,847,006.44 · mapped
- CONSTRUCTION OF TAGO RIS (BALISONG DAM) PROTECTION WORKS ALONG BALISONG RIVER, TAGO,SURIGAO DEL SUR25NH0063 · ₱29,385,092.46 · mapped
- REHABILITATION OF BRGY. PANTUKAN TO BRGY. ADLAY ROAD PHASE 1 AT CARRASCAL, SURIGAO DEL SUR22NH0079 · ₱24,749,974.98 · mapped
- CANAG-AS BR. (B01402MN) ALONG JCT. GAMUT - SAN MIGUEL BAYUGAN RD., BRGY. CAGDAPAO, TAGO, SURIGAO DEL SUR22NH0057 · ₱14,693,703.18 · mapped
- CONCRETING OF SAN ISIDRO-MATICDUM, TANDAG CITY, SURIGAO DEL SUR16NH0049 · ₱4,801,638.84 · mapped
- CONSTRUCTION/IMPROVEMENT OF BRGY. HALL, (MULTI-PURPOSE BUILDING) BRGY. TELAJE, TANDAG CITY, SURIGAO DEL SUR16NH0059 · ₱4,342,500.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAUCAWE, LIANGA, SURIGAO DEL SUR22NH0045 · ₱1,979,956.44 · mapped
