Construction of Flood Control Structure, Bago River (Upstream - Right Side), Don Salvador Benedicto, Negros Occidental
Construction of Flood Control Structure, Bago River (Upstream - Right Side), Don Salvador Benedicto, Negros Occidental is a DPWH-tracked public work in SALVADOR BENEDICTO (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VI. Reported contract value: ₱48,249,938.13. Status: Reported complete (DPWH). Contractor on record: JAIME B CHING ENT. Figures trace to sumbong.
Total Contract Cost
