GAA 2025 OO-125PB0005

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱66,608,386.75. Status: Past target date (DPWH On-Going). Contractor on record: ISNAG BUILDERS & DEV'T CORP. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱12,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Barren River Flood Control Structure along Chico River Basin, Conner, Apayao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-25-0010863

₱509,667.00 · FY2025

Released to Tigwi National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

16 projects · ₱1.9B total · 0 flags

Other projects by this contractor

OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M

Apayao 2nd DEO, Cordillera Administrative Region

2024₱143.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S)

Apayao 2nd DEO, Cordillera Administrative Region

2024₱143.9M
Past target date (DPWH On-Going)

OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S)

Apayao 2nd DEO, Cordillera Administrative Region

2024₱143.9M
Reported complete (DPWH)

OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S)

Apayao 2nd DEO, Cordillera Administrative Region

2024₱142.9M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121

Apayao 2nd DEO, Cordillera Administrative Region

2025₱141.8M
Past target date (DPWH On-Going)
No sat.

OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA

Apayao 2nd DEO, Cordillera Administrative Region

2025₱141.8M
Past target date (DPWH On-Going)
View all 16 projects →

4. Implementation

Contract Amount

₱66,608,386.75

Progress

Past target date (DPWH On-Going)

Start Date

February 26, 2025

Target End

October 11, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.