CONSTRUCTION OF FLOOD COTROL STRUCTURE ALONG TAGAMUSING RIVER, STA. 0+473.60 - STA. 0+769.60, BARANGAY POBLACION, BINALONAN, PANGASINAN (PACKAGE 11)
CONSTRUCTION OF FLOOD COTROL STRUCTURE ALONG TAGAMUSING RIVER, STA. 0+473.60 - STA. 0+769.60, BARANGAY POBLACION, BINALONAN, PANGASINAN (PACKAGE 11) is a DPWH-tracked public work in Pangasinan 3rd DEO, Region I. Reported contract value: ₱44,031,381.22. Status: Reported complete (DPWH). Contractor on record: W J P CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost
