CONST/ MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN DOWNSTREAM SECTION OF SAN IGNACIO RIVER ALONG MAHARLIKA HIGHWAY, K0084+850, BARANGAY SAN IGNACIO, SAN PABLO CITY
CONST/ MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN DOWNSTREAM SECTION OF SAN IGNACIO RIVER ALONG MAHARLIKA HIGHWAY, K0084+850, BARANGAY SAN IGNACIO, SAN PABLO CITY is a DPWH-tracked public work in Laguna 3rd DEO, Region IV-A. Reported contract value: ₱18,520,500.00. Status: Reported complete (DPWH). Contractor on record: ST GERRARD CONST GEN CONTRACTOR. Figures trace to dpwh.
Total Contract Cost
