CONSTRUCTION OF CONCRETE REVETMENT ALONG SILWAY-APOPONG-SINAWAL RIVER (UPSTREAM OF UPPER SINAWAL BRIDGE), STA. 0+000 - STA. 0+205 (RIGHT BANK), STA. 0+000 - STA. 0+200 (LEFT BANK), BARANGAY SINAWAL, GENERAL SANTOS CITY
CONSTRUCTION OF CONCRETE REVETMENT ALONG SILWAY-APOPONG-SINAWAL RIVER (UPSTREAM OF UPPER SINAWAL BRIDGE), STA. 0+000 - STA. 0+205 (RIGHT BANK), STA. 0+000 - STA. 0+200 (LEFT BANK), BARANGAY SINAWAL, GENERAL SANTOS CITY is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱0.00. Status: Ongoing (DPWH-reported) (For Procurement (DPWH-reported)). Contractor on record: Contractor not linked in this database. Figures trace to dpwh.