CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG UNGALI RIVER PROTECTING UNGALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD (11.7006, 124.4557), KAWAYAN, PROVINCE OF BILIRAN
CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG UNGALI RIVER PROTECTING UNGALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD (11.7006, 124.4557), KAWAYAN, PROVINCE OF BILIRAN is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱12,260,880.00. Status: Reported complete (DPWH). Contractor on record: LJPM BUILDERS. Figures trace to dpwh.
Total Contract Cost
