CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), SANGHAY FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL (SECT. A STA. 0+000 - STA. 0+260 BOTH SIDES, SECT. B STA. 0+060 - STA. 0+312 RIGHT SIDE)
CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), SANGHAY FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL (SECT. A STA. 0+000 - STA. 0+260 BOTH SIDES, SECT. B STA. 0+060 - STA. 0+312 RIGHT SIDE) is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱37,272,588.26. Status: Reported complete (DPWH). Contractor on record: FFJJ CONST. Figures trace to dpwh.
Total Contract Cost
