ROAD UPGRADING (UNPAVED TO PAVED): SIOCON-SIRAWAI-LIMPAPA ROAD, ZAMBOANGA DEL NORTE, 2ND DEO, K2121+460.00 - K2123+902.2; K2123+931.04 - K2124+140.00 (NET LENGTH = 2,651.16 LN.M.)
ROAD UPGRADING (UNPAVED TO PAVED): SIOCON-SIRAWAI-LIMPAPA ROAD, ZAMBOANGA DEL NORTE, 2ND DEO, K2121+460.00 - K2123+902.2; K2123+931.04 - K2124+140.00 (NET LENGTH = 2,651.16 LN.M.) is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱146,054,999.65. Status: Reported complete (DPWH). Contractor on record: M ABUBAKAR CONST AND ENGINEERING INC. Figures trace to dpwh.
Total Contract Cost
