CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, MASBATE CITY, STA. 2+974.00 - STA. 3+170 (RIGHTSIDE, DOWNSTREAM), STA. 2+974.00 - STA. 3+170 (LEFTSIDE, DOWNSTREAM), STA. 3+180.00 - STA. 3+377 (RIGHTUP
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, MASBATE CITY, STA. 2+974.00 - STA. 3+170 (RIGHTSIDE, DOWNSTREAM), STA. 2+974.00 - STA. 3+170 (LEFTSIDE, DOWNSTREAM), STA. 3+180.00 - STA. 3+377 (RIGHTUP is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱46,525,388.58. Status: Reported complete (DPWH). Contractor on record: ARKY CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost