ARKY CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 76 linked DPWH project(s) totaling about ₱4,048,760,800.59. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ARKY CONST AND SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 76
- Total value
- ₱4,048,760,800.59
- Published flags
- 0
- Region
- Masbate 2nd DEO · Region V
Online presence
Google Maps: ARKY CONSTRUCTION AND SUPPLY★ 3.5 (2 reviews)Google Maps, 2026-10-22
7GHW+9R2, Masbate City, Masbate
Licensed officers (PCAB)
- Ariel Navea Lim · Authorized Managing Officer (PCAB license 32692) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ARKY CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 81.90 / 100 · Projects in sample: 76 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 68.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 68.8
- lateCompletedProjects
- 36
- onTimeCompletedProjects
- 35
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 74
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 76
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 76
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 76
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 76
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 38 of 54 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE PROVINCE18F00051 · ₱179,133,040.30 · mapped
- CONST./REPAIR/REHAB./IMPVT. OF SWANG-AGPANABAT ROAD, ROMBLON, ROMBLON STA.15+290-STA.15+603.35, STA.15+877.92-STA. 16+637.30 STA.16+895.50-STA. 17+208.80, STA.17+500.00-STA.-STA.17+857.80 STA. 18+295.80-STA.20+513.60, STA. 20+660.00-STA.21+617.00 W/EXCEPT16E00088 · ₱168,424,694.53
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MASBATE-CATAINGAN-PLACER ROAD, MASBATE PROVINCE18F00046 · ₱155,568,278.87 · mapped
- ROAD UPGRADING OF SIBUYAN CIRC RD K0023+563-K0025+487; K0025+524-K0026+198; K0027+1086-K0029+237; SI16E00081 · ₱146,238,631.52
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUM. RD., KO029+237-KO030+346; KO030+408-KO031+364; KO031+431-KO031+497; KO031+571-KO031+638; KO032+555-KO033+073; KO033+086-KO033+615; KO034+094-KO035+690; KO035+908-KO036+528, SIBUYAN IS., ROMBLON16E00082 · ₱145,797,291.52
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE, TICAO ISLAND, MASBATE18F00093 · ₱144,747,248.26 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN, ROMBLON (K0044+032-K0044+559; K0044+731-K0045+478; K0045+610-K0047+517; K0047+718-K0047+727; K0047+859-K0048+085; K0048+217-K0049+565; K0049+743-K0049+861; K0049+993-K0050+471; K017E00067 · ₱144,306,081.89
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUMFERENTIAL ROIAD , SIBUYAN, ROMBLON (K0051+317-K0052+091; K0052+353-K0052+557; K0061+466-K0062+730; K0062+809-K0064+937; K0065+261-K0066+028; K0066+167-K0067+078; K0068+155-K0068+919)17E00068 · ₱143,914,370.82
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE, BALUD, MASBATE (2ND LEGISLATIVE DIS21F00087 · ₱139,925,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE, BALUD, MASBATE (2ND LEGISLATIVE DIS20F00073 · ₱120,625,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - BALUD NATIONAL ROAD CONNECTING BARANGAY22F00060 · ₱112,861,702.73 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-BALDOZA BR. (B00058MT) ALONG BUENAVISTA-KAWAYAN RD., CAWAYAN, MASBATE 3RD LEGISLATIVE DISTRICT22F00061 · ₱107,114,761.80 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT19F00008 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT18F00096 · ₱96,499,870.49 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS COMMONWEALTH AVE (S05453LZ) K0016 + 000 - K0016 + 600, QUEZON CITY22OF0247 · ₱96,499,364.55 · mapped
- FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PARIAN- SAN JOSE-BUCAL DIVERSION ROAD, LAGUNA20D00033 · ₱96,498,080.32 · mapped
- CONST./REPAIR/REHAB./IMPRVT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONST. OF LOPE DE VEGA - SILVINO LOBOS ROAD (PHASE 4), LOPE DE VEGA, NORTHERN SAMAR, 1ST DISTRICT16I00050 · ₱93,999,613.61
- ROAD UPGRADING OF CROSSING MWCR(POLA)-CASAGUE-JCT.ALAKAAK RD.K0385+486-K0388+25516E00012 · ₱92,752,934.23 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION) BUSIG ON BRIDGE-PHASE II, CAMARINES NORTE, LABO, CAMARINES NORTE24F00105 · ₱89,094,564.92 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN, ROMBLON (K0082+297-K0084+943; K0085+092-K0087+042)17E00070 · ₱84,912,467.68
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUMFERENTIAL ROAD, KO040+556-KO040+657; KO040+679-KO041+102; KO041+114-KO042+391; KO042+579-KO044+032, SIBUYAN IS., ROMBLON16E00084 · ₱80,332,629.60
- CONST/REPAIR/REHABILITATION/IMPROVEMENT OF SABLAYAN-AGNAGA-CALABOGO ROAD STA.18+730-STA.20+081.40; STA.20+517.40-STA.20+950.40; STA.22+317.60-STA.23+329.00, ROMBLON, ROMBLON17E00074 · ₱75,623,335.80
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT20F00057 · ₱70,926,632.68 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0056+851 - K0059+40020FJ0012 · ₱67,547,865.44 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, MASBATE-CATAINGAN-PLACER ROAD, K0039+505 - K0040+715, K0078+681 - K0078+850, K0081+521 - K0082+53219FJ0017 · ₱67,166,327.22 · mapped
- LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, CONCRETING OF JUNCTION NATIONAL ROAD, BRGY. SAN PEDRO TO BRGY. CONCEPCION, MADAMBA AGUADA ROAD, CATAINGAN, MASBATE20FJ0014 · ₱64,320,403.17 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0037+500 - K0038+860, K0040+728 - K0041+72820FJ0013 · ₱64,144,787.73 · mapped
- ROAD UPGRADING OF CROSSING MWCR(POL)-CASAGUE-JCT ALAKAAK RD.,CHAINAGE 1051.64(0+940-STA.1+191.64)16E00013 · ₱62,456,725.39 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS @ MAUBAN-TIGNOAN ROAD (MAUBAN SECTION) MAUBAN, QUEZON19DK0066 · ₱49,000,000.00 · mapped
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, MINDORO WEST COASTAL RD - K0328 + 000 - K0329 + 785, S00095MR17EB0080 · ₱48,978,908.50
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, STA. 79+406.81-STA. 80+120.00, BALUD, MASBA19F00063 · ₱48,248,838.01 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, MINDORO WEST COASTAL RD - K0354 + 590 - K0355 + 500, K0398 + 453 - K0400 + 922, S00095MRSABLAYAN AND MAMBURAO, OCCIDENTAL MINDORO17EB0069 · ₱47,217,449.59
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, MASBATE CITY, STA. 2+974.00 - STA. 3+170 (RIGHTSIDE, DOWNSTREAM), STA. 2+974.00 - STA. 3+170 (LEFTSIDE, DOWNSTREAM), STA. 3+180.00 - STA. 3+377 (RIGHTUP19FI0041 · ₱46,525,388.58 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS WITH DRAINAGE - SAN FERNANDO NORTH ROAD.18FM0016 · ₱46,025,541.19 · mapped
- CONCRETING OF ACCESS ROAD, BRGY. NICOLAS TO BRGY. ALIBOG, MAGSAYSAY, MINDORO OCCIDENTAL, MAGSAYSAY, OCCIDENTAL MINDORO17EB0084 · ₱45,721,067.02 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT (PAVING OF SHOULDER) SAN FERNANDO SOUTH ROAD, SAN FERNANDO, MASBATE.16FM0006 · ₱45,629,385.04 · mapped
- RECONSTRUCTION OF PUERTO PRINCESA SOUTH ROAD, K0000+420 - K0001+393, PUERTO PRINCESA CITY16EG0021 · ₱42,975,376.26 · mapped
- BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CALPI BR. (B00039MT) ALONG MASBATE-CATAINGAN-PLACER RD., K0040+47819FJ0026 · ₱42,032,552.79 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - REPLACEMENT OF PERMANENT WEAK BRIDGES, PINAMANAAN BR. (B00076MR) ALONG MINDORO WEST COASTAL RD (PHASE II)17EB0061 · ₱37,474,222.87
- NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996 K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO17EB0060 · ₱35,945,766.17 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY CALASUCHE, MILAGRO25FI0013 · ₱34,367,418.63 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG MASBATE-CATAINGAN-PLACER ROAD, MASBATE CITY & M16FI0012 · ₱33,676,328.75 · mapped
- Rehabilitation/Improvement of Tugbo River Control, Masbate City and Mobo, Masbate22FI0036 · ₱33,004,386.92 · mapped
- LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF DAPDAP-SIMAWA ROAD, USON, MASBATE19FJ0032 · ₱27,947,668.05 · mapped
- ASSET PRES. OF NATL. RD NETWORK SERVICES - REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL. ROADS INCL17FJ0006 · ₱27,758,888.38 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF ROMBLON-COGON-SABLAYAN ROAD, K0018 + 345 - K0018 + 673 AS PER KM POST, K0018 + 345 - K0018 + 696 AS PER RBIA, K0019 + 065.90 - K0019 + 758.35 AS PER KM POST, K0019 + 069 - K0019 + 768 AS PER RBIA, ROMBLON, ROMBLON16EH0001 · ₱27,703,066.01 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, ASPHALT OVERLAY, BUENAVISTA-KAWAYAN ROAD, K0047+844 - K0048+640, K0049+000 - K0049+78019FJ0001 · ₱22,651,312.48 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. TAWAD - BALUD RD. (S00023MT), K0028+(-714) - K0028+(-360), MILAGROS, MASBATE22FI0020 · ₱21,247,380.00 · mapped
- IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG MASBATE-CATAINGAN-PLACER ROAD, MASBATE CITY, K0000+480-16FI0013 · ₱19,928,286.78 · mapped
- LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF DAPDAP-SIMAWA ROAD, USON, MASBATE19FJ0033 · ₱18,630,873.67 · mapped
Equipment & capacity
PCAB license
- License no.
- 32692
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jul 12, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 32692); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 3 GPPB CPES releases; average final rating 86.4% over 2 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 24, 2025 | DPWH | ₱34,367,419.00 | On-going | 95.5% | — | 40th, p. 38 |
| Sep 6, 2023 | DPWH | ₱9,789,761.00 | Final | 65.1% | 80.3% | 36th, p. 26 |
| Jul 29, 2022 | DPWH | ₱33,004,387.00 | On-going | 93.3% | — | 34th, p. 11 |
| Nov 13, 2019 | DPWH | ₱22,651,312.00 | Completed | 92.5% | 92.5% | 40th, p. 38 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →