ROAD UPGRADING (UNPAVED TO PAVED) OF ROMBLON-COGON-SABLAYAN ROAD, K0018 + 345 - K0018 + 673 AS PER KM POST, K0018 + 345 - K0018 + 696 AS PER RBIA, K0019 + 065.90 - K0019 + 758.35 AS PER KM POST, K0019 + 069 - K0019 + 768 AS PER RBIA, ROMBLON, ROMBLON
ROAD UPGRADING (UNPAVED TO PAVED) OF ROMBLON-COGON-SABLAYAN ROAD, K0018 + 345 - K0018 + 673 AS PER KM POST, K0018 + 345 - K0018 + 696 AS PER RBIA, K0019 + 065.90 - K0019 + 758.35 AS PER KM POST, K0019 + 069 - K0019 + 768 AS PER RBIA, ROMBLON, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱27,703,066.01. Status: Reported complete (DPWH). Contractor on record: ARKY CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost