DPWH projects in Romblon
1,383 DPWH public works projects are recorded in Romblon (Region Iv-B), with start dates from 2016 to 2025. Recorded contract values total about ₱43,073,587,611.37. 1,244 are recorded at 100% progress and 218 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon₱289,497,468.80
- Construction of River Control Structure Along Pagpagoha River, Upstream, Tablas Island, Romblon₱289,492,750.90
- Construction of Mayha - Rizal Flood Control Structure, Tablas Island Romblon₱192,991,021.80
- Construction of Barangay Malilico - Sitio Maligaya Leading to Garing Falls Progreso Este, Odiongan, Romblon₱148,497,934.30
- Construction of Flood Control Structure, Barangay Cantingas, San Fernando, Romblon₱145,546,293.32
- Construction of Flood Control Structure, Sitio Cabitangahan Barangay Taclobo, San Fernando, Romblon₱145,534,217.57
- Construction of Flood Control Structure, Sitio Cabangahan Barangay Carmen, San Agustin, Romblon₱145,531,256.05
- Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads Along Romblon Cogon Sablayan Road, K0000+070-K0000+390, K0002+000 - K0004+000, K0009+000 - K0010+505 As Per Actual Rbia, Romblon Island, Romblon₱144,750,000.00
- Construction of Storm Surge Protection/Causeway Along Poblacion Seaport, Alcantara, Romblon₱144,750,000.00
- Construction of Sitio Lupog to Sitio Bariri Road, Ferrol, Romblon₱144,749,999.34
- Construction of Brgy. Pili to Brgy. Limon Sur Road, Looc, Romblon₱144,747,927.07
- Construction of Road, Sitio Tuburan Leading to Agcalatao Road, Barangay Concepcion Phase 2, Sta. Maria, Romblon₱144,747,741.83
- Construction of Beatriz Road Leading to - Brgy. Jao-Asan - Jct. Magdiwang - San Fernando Cross Country Road, Magdiwang, Romblon₱144,747,651.21
- Construction of Brgy. Anahao -Tubigon Leading to Bagulayag Beaches, Odiongan, Romblon₱144,747,506.89
- Construction of Sitio Tagcayo, Brgy. Ambulong - Sitio Small Dulangan - Sitio Pisi, Brgy. Ipil Road, Magdiwang, Romblon₱144,747,141.11
- Construction of River Control Structure, Mayor River Phase 2, Barangay Binonga-An, San Agustin, Romblon₱143,304,837.73
- Construction of Flood Control Structure, Sitio Agcahico, Barangay Carmen Phase 2, San Agustin, Romblon₱143,304,301.33
- Construction of Road, Brgy. Tumingad - Leading to Canlumay Elementary School (Phase 2), Odiongan, Romblon₱143,177,050.00
- Construction of Road, Alcantara to Odiongan, Alcantara, Romblon₱142,658,846.72
- Construction of Road, Odiongan Road Leading to Tugdan Airport, Odiongan, Romblon₱142,609,363.90
- Construction of Flood Control Structure Along Cambajao Bridge Ds, Phase 2, Cajidiocan, Romblon₱142,577,422.20
- Rehabilitation of Flood Control Structure Along Cambijang Bridge (Upstream), Cajidiocan, Romblon₱142,576,731.04
- Construction of Seawall/Causeway Leading to Poblacion, Phase 4, Odiongan, Romblon₱141,857,762.88
- Construction of Shore Protection/Causeway Poblacion, Alcantara, Romblon₱141,856,035.32
- Construction of Flood Control Structure, Tabobo-An River, Odiongan, Romblon₱141,855,510.56