CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMBAJAO BRIDGE DS, PHASE 2, CAJIDIOCAN, ROMBLON
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMBAJAO BRIDGE DS, PHASE 2, CAJIDIOCAN, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱142,577,422.20. Status: Past target date (DPWH On-Going). Contractor on record: SCATR CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost




