Typhoon mode · November 4, 2025 – November 14, 2025

Fung-Wong (Uwan) 2025

20,506 DPWH flood-control projects worth ₱994.89B sit within 300 km of this storm’s track. Peak sustained wind 115 kt (213 km/h, 1-minute average). Being on this list says nothing about a project’s quality. It is where photos after the storm are most useful.

Send a check-in photo

Track and projects

Red line: storm centre (best track). Shaded band: 300 km around the track (median 34-kt wind radius near the Philippines, or 100 km where radii were not reported). Blue dots: projects with DPWH coordinates.

Projects in path

20,506

Contract value

₱994.89B

Reported complete

16,982

Ongoing or not reported

3,524

Largest contractors in the path

  1. 11-16 CONST199 · ₱15.96B
  2. ST TIMOTHY CONST CORP286 · ₱15.75B
  3. MG SAMIDAN CONST140 · ₱14.50B
  4. SUNWEST INC FORMERLY: SUNWEST CONST129 · ₱13.86B
  5. L R TIQUI BUILDERS INC163 · ₱12.26B
  6. JWU CONST AND SUPPLY121 · ₱11.36B
  7. E F CHUA CONST INC125 · ₱10.74B
  8. CENTERWAYS CONST AND DEVELOPMENT INC123 · ₱9.11B
  9. DALCON CONST102 · ₱8.63B
  10. TOPNOTCH CATALYST BUILDERS INC115 · ₱8.60B

By DPWH implementing office

  1. Flood Control Management Cluster168 · ₱40.77B
  2. Bulacan 1st DEO742 · ₱37.21B
  3. Region V285 · ₱33.19B
  4. BULACAN491 · ₱32.80B
  5. ISABELA321 · ₱21.77B
  6. Region IV-B104 · ₱21.72B
  7. Albay 2nd DEO383 · ₱20.41B
  8. North Manila DEO371 · ₱19.08B
  9. Bulacan 2nd DEO380 · ₱18.02B
  10. Zambales 1st DEO261 · ₱17.39B
  11. Metro Manila 1st DEO565 · ₱16.73B
  12. Tarlac DEO299 · ₱16.06B

Satellite before and after

Largest projects in the path with archived imagery. Imagery dates are before and after the contract, not the storm. They are not proof of completion.

Imagery © Esri, Maxar, Earthstar Geographics, and the GIS User Community (World Imagery Wayback).

Projects to check (largest 1,500 of 20,506)

Near one of these? Open the project and use “Check in” to add a dated photo. Faces and plates are blurred automatically.

ProjectPlaceCostStatusContractorkm from track
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYANFlood Control Management Cluster₱1.10BReported completeRAYMAN BUILDERS INC197Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYANFlood Control Management Cluster₱1.04BReported completeR-II BUILDERS INC196Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYANFlood Control Management Cluster₱945.5MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC172Check in
CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LDFlood Control Management Cluster₱942.7M12% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO173Check in
AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 TFlood Control Management Cluster₱941.2M69% reported progressL R TIQUI BUILDERS INC46Check in
CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROWFlood Control Management Cluster₱934.0M99% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO207Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱931.7MReported completeRAYMAN BUILDERS INC166Check in
RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱907.5MReported completeRAYMAN BUILDERS INC162Check in
REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC173Check in
REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC175Check in
CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRAFlood Control Management Cluster₱853.1MReported completeRAYMAN BUILDERS INC108Check in
REHABILITATION OF NAPINDAN HYDRAULIC CONTROL STRUCTURES THROUGH DESIGN AND BUILD SCHEME, BRGY. BUTING, PASIG CITYFlood Control Management Cluster₱849.1MReported completeA M ORETA & CO INC 108179Check in
FLOOD CONTROL WORKS-ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGAFlood Control Management Cluster₱761.0MReported completeR U AQUINO CONST AND DEVELOPMENT CORP FO136Check in
DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMARFlood Control Management Cluster₱744.4M87% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY247Check in
CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱715.1M94% reported progressMSB VITUG CONST148Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 2 AND 3 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER UPSTREAM OF MARIKINA BRIDGE) STA. 14+100 TO STA. 15+450, LEFT BANK, MARIKINA CITYFlood Control Management Cluster₱714.7M91% reported progressMSB VITUG CONST170Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITYFlood Control Management Cluster₱689.3MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC167Check in
REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱669.3MReported completeE M CUERPO INC173Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITYFlood Control Management Cluster₱652.3M99% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO166Check in
ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST FLOODS: IMPROVEMENT OF WATERWAYS/RETARDING PONDS OF PUMPING STATIONS AT WEST OF MANGGAHAN FLOODWAY, C-6 ROAD, WEST MANGGAHAN RD., TAGUIG CITY, METRO MANILANational Capital Region₱596.9MReported completePREMIUM MEGASTRUCTURES INC180Check in
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱533.8M94% reported progressTOKWING CONST CORP FOR TOKWING CONSTRUC161Check in
ORGANIZATIONAL OUTCOME 2 PROTECT LIVES AND PROPERTIES AGAINST FLOOD: CONSTRUCTION OF MAYTUNAS PUMPING STATION AND IMPROVEMENT OF MAYTUNAS CREEK AND ITS VICINITY, MANDALUYONG CITYNational Capital Region₱519.4M19% reported progressPREMIUM MEGASTRUCTURES INC180Check in
PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS)National Capital Region₱502.3M95% reported progressMSB VITUG CONST181Check in
CONSTRUCTION OF FLOOD CONTROL PROTECTION DIKE ALONG MUZON RIVER, MALABON, NAVOTAS-OBANDO SECTION, MALABON CITYNational Capital Region₱481.7MReported completeFLORDES CONST & TRADING CORP FORMERLY FLO171Check in
FLOOD CONTROL WORKS-PAMPANGA DELTA DEVELOPMENT PROJECT-PHASE II, CALUMPIT, BULACAN, PROVINCE OF BULACANFlood Control Management Cluster₱472.7M93% reported progressRAYMAN BUILDERS INC152Check in
CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCEFlood Control Management Cluster₱445.3MReported completeMSB VITUG CONST248Check in
LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BATANGAS ACCESS ZONE - WEST SIDE, BATANGAS CITY, SAN PASCUAL AND BAUAN, BATANGASRegion IV-A₱442.9MReported completeTCSC CORP248Check in
CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMARFlood Control Management Cluster₱438.8MReported completeMSB VITUG CONST247Check in
FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALESFlood Control Management Cluster₱420.4MReported completeHORAMABI BUILDERS144Check in
UPGRADING OF CATMON PUMPING STATION, MALABON CITYFlood Control Management Cluster₱416.4MReported completeE F CHUA CONST INC172Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYANFlood Control Management Cluster₱415.9M90% reported progressJ D LEGASPI CONST169Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 9 - CONSTRUCTION OF MALANDAY PUMPING STATION AND ASSOCIATED WORKS, MARIKINA CITYFlood Control Management Cluster₱399.5M95% reported progressJ D LEGASPI CONST169Check in
METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATIONFlood Control Management Cluster₱390.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC176Check in
UPGRADING OF TAPAYAN PUMPING STATION, TAGUIG CITYFlood Control Management Cluster₱389.3MReported completeA M ORETA & CO INC 108177Check in
FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALESZambales 2nd DEO₱386.0MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP163Check in
UPGRADING OF SPINE PUMPING STATION, NAVOTAS CITYFlood Control Management Cluster₱385.0MReported completeA M ORETA & CO INC 108174Check in
UPGRADING/REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND REPAIR OF NAVOTAS NAVIGATIONAL GATE (PHASE I)Flood Control Management Cluster₱382.4MReported completeE F CHUA CONST INC172Check in
FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGAFlood Control Management Cluster₱376.8M72% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO147Check in
CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2)National Capital Region₱376.8M1% reported progressE F CHUA CONST INC179Check in
CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTEFlood Control Management Cluster₱366.6MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC224Check in
AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-RFlood Control Management Cluster₱363.2MReported completeMSB VITUG CONST66Check in
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGARegion III₱354.4M0% reported progressFERDSTAR BUILDERS INC161Check in
REVETMENT WORKS ALONG MARULAS TUNGTONG CREEK DIVERSION CHANNEL, LAS PIÑAS CITYFlood Control Management Cluster₱351.8MReported completeE F CHUA CONST INC191Check in
CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN II (YLANG-YLANG RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO CHICO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROWFlood Control Management Cluster₱350.2M96% reported progressMSB VITUG CONST203Check in
CONSTRUCTION OF FLOODGATES NUMBER 3 AND NUMBER 4 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITYFlood Control Management Cluster₱328.1M81% reported progressPRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP214Check in
CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGAFlood Control Management Cluster₱309.6MReported completeNORTHERN BUILDERS142Check in
CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 2), ANGELES-PORAC, PAMPANGAFlood Control Management Cluster₱298.5MReported completeNORTHERN BUILDERS146Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. CAMBAJAO-BRGY. ALIBAGON, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLONRegion IV-B₱297.0M90% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST270Check in
Construction of Camiling-Agno River Floodway, Tarlac, Phase 3CAMILING (TARLAC), TARLAC₱289.5MReported completeBMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP79Check in
Construction of Camiling-Agno River Floodway, Tarlac, Phase 4CAMILING (TARLAC), TARLAC₱289.5MReported completeBMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP81Check in
Construction of Casalogan River Control, Casiguran, AuroraCASIGURAN (AURORA), AURORA₱289.5MReported completeDALCON CONST / EGB CONST CORP FORMERLY: EGB CONST40Check in
CONSTRUCTION OF FLOOD CONTROL ALONG ZAPOTE RIVER AND ITS TRIBUTARIES (UPSTREAM), LAS PINAS CITYLas Piñas-Muntinlupa DEO₱289.5MReported completeE F CHUA CONST INC198Check in
FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-PASIG-POTRERO RIVER (BACOLOR SECTION), PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT), PROVINCE OF PAMPANGARegion III₱289.5MReported completeA D GONZALES JR CONST148Check in
SUSTAINABLE INFRASTRUCTURE PROECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CARMEN PORT, SAN AGUSTIN, ROMBLONRegion IV-B₱289.5MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST273Check in
Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island RomblonALCANTARA (ROMBLON), ROMBLON₱289.5MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST278Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD AND CAUSEWAY FOR TOURISM ALONG AZAGRA PORT, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST TIMOTHY CONST CORP282Check in
CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1Region IV-B₱289.5M62% reported progressST TIMOTHY CONST CORP291Check in
Construction of Road Dike/Esplanade along Pangalaan River (Left Side), Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱289.5MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP281Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CAJIDIOCAN PORT, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST TIMOTHY CONST CORP270Check in
SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY FOR TOURISM ALONG AMBULONG PORT, MAGDIWANG, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST PIUS CONST AND SUPPLY266Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG POBLACION SAN FERNANDO, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST TIMOTHY CONST CORP281Check in
Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, RomblonSAN ANDRES (ROMBLON), ROMBLON₱289.5MReported completeYPR GEN CONTRACTOR AND CONST SUPPLY INC287Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SABLAYAN PORT, ROMBLON, ROMBLONRegion IV-B₱289.5MReported completeST PIUS CONST AND SUPPLY276Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/Region V₱288.5MReported completeSUNWEST INC FORMERLY: SUNWEST CONST140Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE I, NAUJAN, OR. MINDORORegion IV-B₱287.2M86% reported progressSUNWEST INC FORMERLY: SUNWEST CONST288Check in
REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGAFlood Control Management Cluster₱285.9MReported completeR U AQUINO CONST AND DEVELOPMENT CORP FO146Check in
RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITYFlood Control Management Cluster₱284.5M99% reported progressE M CUERPO INC171Check in
FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJAFlood Control Management Cluster₱284.2MReported completeNORTHERN BUILDERS121Check in
CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1)South Manila DEO₱283.3M8% reported progressE F CHUA CONST INC180Check in
CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICTRegion V₱281.5MReported completePHILWORKS CONST139Check in
REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND NAVOTAS NAVIGATION GATE (PHASE 3), NAVOTAS CITY (RE-ADVERTISEMENT)National Capital Region₱281.2M65% reported progressANORE CONST172Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 2, BACOOR, CAVITERegion IV-A₱280.7M11% reported progressI&E CONST CORP FORMERLY: I&E CONSTR197Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 1, BACOOR, CAVITERegion IV-A₱280.7M14% reported progressI&E CONST CORP FORMERLY: I&E CONSTR197Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BRRegion V₱280.3MReported completePHILWORKS CONST137Check in
SUSTAINABLE INFRASTRUCTURE POJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG UBI RIVER, BRGY. TAGUMPAY, PHASE V, NAUJAN, OR. MINDORORegion IV-B₱280.2M91% reported progressSUNWEST INC FORMERLY: SUNWEST CONST286Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG DULANGAN RIVER, BRGY. EVANGELISTA, PHASE I, NAUJAN, ORIENTAL MINDORORegion IV-B₱280.1M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST283Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING M,AJOR/STRATEGIC PUBLIC BUILDINGS/FCILITIES- CONST. OF ROAD DIKE ALONG M,AG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE III, NAUJAN, ORIENTAL MINDORORegion IV-B₱280.1M89% reported progressSUNWEST INC FORMERLY: SUNWEST CONST286Check in
REVETMENT AND DREDGING WORKS ALONG STA. 14+038 TO STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITYFlood Control Management Cluster₱280.0MReported completeMSB VITUG CONST167Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILUITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE IV, NAUJAN, OR. MINDORORegion IV-B₱279.9M86% reported progressSUNWEST INC FORMERLY: SUNWEST CONST284Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PJHASE IV, NAUJAN, ORIENTAL MINDORORegion IV-B₱279.9M88% reported progressSUNWEST INC FORMERLY: SUNWEST CONST286Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱279.8MReported completeHI-TONE CONST & DEVELOPMENT CORP FORMERLY139Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRICRegion V₱279.8MReported completeG C I CONST AND DEV'T CORP139Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱279.8MReported completeSUNWEST INC FORMERLY: SUNWEST CONST139Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE II, NAUJAN, OR. MINDORORegion IV-B₱279.7M87% reported progressSUNWEST INC FORMERLY: SUNWEST CONST287Check in
PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE IIFlood Control Management Cluster₱279.6MReported completeNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST179Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY.INARAWAN, PHASE II, NAUJAN, OR. MINORTORegion IV-B₱279.4M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST285Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORORegion IV-B₱279.4M82% reported progressSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP285Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE III, NAUJAN, OR. MINDORORegion IV-B₱279.2M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST285Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORORegion IV-B₱276.2M24% reported progressLE BRON CONST278Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORORegion IV-B₱276.1M30% reported progressANORE CONST277Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN,Region IV-B₱276.0M32% reported progressHGG BUILDERS283Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORORegion IV-B₱276.0M24% reported progressANORE CONST278Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (DOWNSTREAM LS), NAUJAN, OR. MINDORORegion IV-B₱275.8M61% reported progressRAYMAN BUILDERS INC284Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DFIKE, PANGALAAN RIVER, DOWNSTREAM (RIGHT SIDE), PACKAGE A, NAUJAN, OR. MINDORORegion IV-B₱275.7M79% reported progressRAYMAN BUILDERS INC276Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (UPSTREAM LS), NAUJAN, OR. MINDORORegion IV-B₱275.6M60% reported progressRAYMAN BUILDERS INC284Check in
PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE IFlood Control Management Cluster₱271.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC179Check in
Flood Control Works-Abacan River Diking and Slope Protection Works, Mexico, PampangaARAYAT (PAMPANGA), PAMPANGA₱270.2MReported completeA D GONZALES JR CONST & TRADING CO INC134Check in
REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGAFlood Control Management Cluster₱260.3MReported completeSTO CRISTO CONST & TRADING INC FOR: STO CRISTO CONST & TRADING132Check in
CONSTRUCTION OF DRAINAGE SYSTEM/OUTFALL EXTENSION AT MANILA BAYNational Capital Region₱258.6M77% reported progressPREMIUM MEGASTRUCTURES INC182Check in
Flood Control Works - Pasig-Potrero River and San Fernando - Sto. Tomas - Minalin Taildike (San Fernando and Bacolor Section) PampangaCITY OF SAN FERNANDO (CAPITAL) (LA UNION), LA UNION₱257.3MReported completeA D GONZALES JR CONST & TRADING CO INC148Check in
UPPER MARIKINA RIVER IMPV'T./REVETMENT WALL,MARIKINA CITY 1ST LD (CONTRACT PACKAGE 3) RIVER IMPV'T.Flood Control Management Cluster₱256.8MReported completeE M CUERPO INC170Check in
CONSTRUCTION OF TWO (2) PUMPING STATION ALONG NAVOTAS COASTAL DIKE (PHASE 6), NAVOTAS CITYFlood Control Management Cluster₱250.9MReported completeMSB VITUG CONST173Check in
Construction of Road Dike along Bucayao River (East Side), Sitio Malaya Section, Barangay Tagumpay, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeST TIMOTHY CONST CORP289Check in
Construction of Road Dike along Bucayao River (East Side), Sitio Malinao Section, Barangay Tagumpay, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeELITE GEN CONTRACTOR AND DEVELOPMENT CORP289Check in
BASIC INFRASTRUCTURE PROGRAM- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE, BRY. DULANGAN, PTO. GALERA, ORIENTAL MINDORORegion IV-B₱247.5M69% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST277Check in
Construction of Road Dike aling Mag-asawang Tubig River, Sampaloc Section, Barangay Sto. Niño, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeRAYMAN BUILDERS INC279Check in
Construction of Road Dike along Mag-asawang Tubig River, Dayapan Section, Barangay Sto. Niño, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeRAYMAN BUILDERS INC280Check in
CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C.Flood Control Management Cluster₱247.1M40% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO173Check in
Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, CaviteCAVITE₱244.1MReported completeE F CHUA CONST INC199Check in
CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITERegion IV-A₱241.4M90% reported progressSILVERWOLVES CONST CORP205Check in
CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I)Region IV-A₱241.4M92% reported progressSILVERWOLVES CONST CORP205Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱241.2M90% reported progressSUNWEST INC FORMERLY: SUNWEST CONST130Check in
Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines SurBAAO (CAMARINES SUR), CAMARINES SUR₱241.2MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP129Check in
Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos SurSANTA CATALINA (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST108Check in
UPGRADING OF MAYPAJO PUMPING STATION, CALOOCAN CITYFlood Control Management Cluster₱241.2MReported completeE F CHUA CONST INC175Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUERegion IV-B₱241.2M87% reported progressSARGASSO CONST226Check in
Construction of Flood Control Structure along Libtangin River, Barangay Mangiliol Section, Gasan, MarinduqueGASAN (MARINDUQUE), MARINDUQUE₱241.2MReported completeHGG BUILDERS & SUPPLY226Check in
Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos SurTAGUDIN (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST42Check in
FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORORegion IV-B₱241.2M71% reported progressEIGHT J'S CONST SERVICES286Check in
SUSTAINABLE INFRASTCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLI BUILDINGS/FACILITIES- CONST. OF TABLAS EAST COAST BOULEVARD, SANTA MARIA, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST296Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORORegion IV-B₱241.2M76% reported progressNEW RICH GEN CONTRACTOR SERVICES & TRADING CO INC286Check in
FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIORegion IV-B₱241.2M82% reported progressEIGHT J'S CONST SERVICES285Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORORegion IV-B₱241.2M81% reported progressEIGHT J'S CONST SERVICES285Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUERegion IV-B₱241.2M74% reported progressHGG BUILDERS210Check in
Construction of Road Dike/Esplanade along Pangalaan River (Right Side), Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱241.2MReported completeGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC278Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. CARMEN SECTION, SAN AGUSTIN, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2M87% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST273Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, PERLAS SECTION, WAWA, ABRA DE ILOG, OCC. MINDORORegion IV-B₱241.2M83% reported progressST TIMOTHY CONST CORP294Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAANRegion III₱241.2M98% reported progressJASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S190Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (DOWNSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2M82% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST278Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2M87% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST278Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MOCONG, BASUD, CAMARINES NORTE, BASUD, CRegion V₱240.1M93% reported progressBRENTMIN ROOFING ENT88Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BASUD RIVER, BARANGAY MAMPILI, BASUD, CAMARINES NRegion V₱240.1M93% reported progressBRENTMIN ROOFING ENT88Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUERegion IV-B₱239.9M63% reported progressHGG BUILDERS196Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 1, BRGY. MULAWIN, NAUJAN, OR. MINDORORegion IV-B₱239.3M35% reported progressHGG BUILDERS283Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION, BUENAVISTA, MARINDUQUERegion IV-B₱238.9M87% reported progressSARGASSO CONST227Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGERegion V₱238.7M90% reported progressE GARCIA CONST CORP FOR E GARCIA CONST88Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGARegion V₱237.4M92% reported progressHGG BUILDERS & SUPPLY82Check in
FLOOD CONTROL WORKS - REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED PAMPANGA RIVER BANK INCLUDING CANDABA CUT-OFF CHANNEL, PAMPANGA AND NUEVA ECIJAFlood Control Management Cluster₱237.1MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC142Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), STA. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORORegion IV-B₱237.0M52% reported progressADSL CONST & TRADING280Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-STA. 000+305.50, CALAPAN, OR. MINDORORegion IV-B₱236.9M38% reported progressADSL CONST & TRADING281Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGERegion V₱236.4MReported completeE GARCIA CONST CORP FOR E GARCIA CONST90Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLONRegion IV-B₱236.4MReported completeYPR GEN CONTRACTOR AND CONST SUPPLY INC266Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITYRegion VIII₱236.1M31% reported progressEZJONES CONST INC295Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORORegion IV-B₱236.1M71% reported progressALRIE CONST SERVICES287Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH FLOOD CONTROL DIKE, BARANGAY BATAN,Region V₱235.9M77% reported progressSUNWEST INC FORMERLY: SUNWEST CONST126Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱235.7M87% reported progressSUNWEST INC FORMERLY: SUNWEST CONST130Check in
CONSTRUCTION OF TWO (2) FLOODGATES ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY(CONSTRUCTION OF FLOODGATE NO. 1 AND ELECTRICAL WORKS FOR FLOODGATES NO. 1 AND 2)Flood Control Management Cluster₱235.5M0% reported progressPRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP173Check in
CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCTCatanduanes DEO₱235.3M0% reported progressG C I CONST AND DEV'T CORP78Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DAET RIVER, BARANGAY BIBIRAO, DAERegion V₱235.2M95% reported progressE GARCIA CONST CORP FOR E GARCIA CONST88Check in
CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, DOWNSTREAM, PHASE 2, SAN JUAN, BATANGASRegion IV-A₱235.2M0% reported progressSTRUKTURA TEKNIKA SERVICES CO215Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 2, BRGY. SAN LUIS, NAUJAN, OR. MINDORRegion IV-B₱234.3M87% reported progressGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC284Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BARegion V₱234.0M89% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST92Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, BARANGAY CAHABAAN,Region V₱234.0M80% reported progressHGG BUILDERS & SUPPLY85Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAYRegion V₱234.0M84% reported progressBRENTMIN ROOFING ENT91Check in
Construction of Pumping Station along Veinte Reales, Valenzuela CityCITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY₱234.0MReported completeTOUGHBUILT CONST & TRADING INC / AKN CONST CORP166Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TALISAY RIVER, BARANGAY BINARegion V₱234.0M96% reported progressHGG BUILDERS & SUPPLY82Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMARRegion V₱234.0M89% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST88Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TORRIJOS SHORE PROTECTION STRUCTURE, BRGY. POBLACION, TORRIJOS, MARINDUQUERegion IV-B₱232.8M89% reported progressHGG BUILDERS210Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SEAWALL, BRGY. MORALES SECTION, STA. CRUZ, MARINDUQUERegion IV-B₱232.8M70% reported progressHGG BUILDERS195Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROAD/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SANTA CRUZ SEAWALL, BRGY. TAGUM-BGRY. MORALES SECTION, STA. CRUZ, MARINDUQUERegion IV-B₱232.8M91% reported progressHGG BUILDERS196Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION STRUCTURE, BRGY. TUNGIB-LIPATA, BUENAVISTA, MARINDUQUERegion IV-B₱232.7M90% reported progressHGG BUILDERS223Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE I, BRGY. SAN LUIS, NAUJAN, OR. MINDORRegion IV-B₱232.4M82% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST285Check in
CONSTRUCTION OF FLOODGATES NUMBER 5 AND NUMBER 6 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITYFlood Control Management Cluster₱231.6M82% reported progressHALREY CONST INC214Check in
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORORegion IV-B₱231.2M0% reported progressGOLDEN J'S CONST SERVICES287Check in
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORORegion IV-B₱231.0M0% reported progressGOLDEN J'S CONST SERVICES286Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER, BRGY. CONRAZON, BANSUD, OR. MINDORORegion IV-B₱230.1M59% reported progressLE BRON CONST296Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORORegion IV-B₱230.1M46% reported progressALRIE CONST SERVICES285Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLONRegion IV-B₱230.1M90% reported progressYPR GEN CONTRACTOR AND CONST SUPPLY INC280Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER DOWNSTREAM, GLORIA, OR. MINDORORegion IV-B₱230.1M78% reported progressJIIK CONST SERVICES286Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORORegion IV-B₱230.0M25% reported progressLE BRON CONST277Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (DOWNSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORORegion IV-B₱230.0M43% reported progressJIIK CONST SERVICES285Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORORegion IV-B₱230.0M45% reported progressALRIE CONST SERVICES285Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER BRGY. CONRAZON (UPSTREAM), BANSUD, OR. MINDORORegion IV-B₱230.0M61% reported progressLE BRON CONST296Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (DOWNSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, OR. MINDORORegion IV-B₱230.0M34% reported progressHGG BUILDERS282Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN-BRGY. SAMPAGUITA (UPSTREAM), PACKAGE A, NAUJAN, OR. MINDORORegion IV-B₱229.9M70% reported progressRAYMAN BUILDERS INC276Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN-BRGY. SAMPAGUITA, PACKAGE B, NAUJAN, OR. MINDORORegion IV-B₱229.9M25% reported progressRAYMAN BUILDERS INC276Check in
FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLONRegion IV-B₱229.8M88% reported progressYPR GEN CONTRACTOR AND CONST SUPPLY INC277Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. SAMPAGUITA (DOWNSTREAM), NAUJAN, OR. MINDORORegion IV-B₱229.6M60% reported progressRAYMAN BUILDERS INC277Check in
Construction of Basey Tide Embankment, Basey, SamarSAMAR (WESTERN SAMAR)₱227.8MReported completeNORTHERN BUILDERS / RIANNE CONST296Check in
Construction of Basey Tide Embankment, Basey, SamarSAMAR (WESTERN SAMAR)₱227.8MReported completeNORTHERN BUILDERS / RIANNE CONST296Check in
Construction of Basey Tide Embankment, Basey, SamarSAMAR (WESTERN SAMAR)₱227.8MReported completeNORTHERN BUILDERS / RIANNE CONST296Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAYS TALON 1 TO TALON 3, LAS PINAS CITYLas Piñas-Muntinlupa DEO₱218.3M25% reported progressI&E CONST CORP FORMERLY: I&E CONSTR193Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MALIS-POBLACION-ILANG-ILANG, GUIGUINTO, BULACANBulacan 1st DEO₱217.1MReported completeST TIMOTHY CONST CORP160Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-LEFTSIDE), BOAC, MARINDUQUERegion IV-B₱212.6M79% reported progressMONOLITHIC CONST218Check in
Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos NorteVINTAR (ILOCOS NORTE), ILOCOS NORTE₱211.3MReported completeJOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST188Check in
CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITYMetro Manila 3rd DEO₱210.6MReported completeJASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S166Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORORegion IV-B₱207.5M85% reported progressANORE CONST276Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN (UPSTREAM), NAUJAN, OR. MINDORORegion IV-B₱204.8M87% reported progressSUNWEST INC FORMERLY: SUNWEST CONST285Check in
Construction of Flood Control Structure (Naujan Seawall), Baragay Estrella Section, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱202.6MReported completeST TIMOTHY CONST CORP264Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, BONGABONG, ORIENTAL MINDORORegion IV-B₱200.1M90% reported progressANORE CONST299Check in
Construction of Flood Control River Wall (Road Dike) along Veinte Reales Creek (Right Side Bank), Brgy. Veinte Reales, Valenzuela CityCITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY₱199.7MReported completeE M CUERPO INC / TOUGHBUILT CONST & TRADING INC166Check in
CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGAFlood Control Management Cluster₱198.7MReported completeA D GONZALES JR CONST16Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B)Region I₱198.0MReported completeALPHA164Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B)Region I₱198.0M95% reported progressKATHA BUILDERS & SUPPLIES INC164Check in
LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL STRUCTURE, CONSTRUCTION OF REVETMENT - CONSTRUCTION OF A REVETMENT AT MASUKOL, PAOMBONG, BULACANRegion III₱198.0MReported completeNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST167Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VIRegion V₱198.0MReported completePARTIDO CONST85Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), TACLOBAN CITY, LEYTERegion VIII₱197.5M86% reported progressEZJONES CONST INC295Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD CONTROL STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN (DOWNSTREAM), NAUJAN, OR. MINDORORegion IV-B₱195.3M93% reported progressSUNWEST INC FORMERLY: SUNWEST CONST284Check in
CONSTRUCTION OF REVETMENT ALONG MARIBLO CREEK, STA. 0+010.000 TO STA. 0+524.458 (LEFT AND RIGHT RIVER BANK), QUEZON CITYFlood Control Management Cluster₱195.0MReported completeTRIPLE 8 CONST174Check in
Flood Control Works - Construction of Guagua Pasac RiverGUAGUA (PAMPANGA), PAMPANGA₱193.0MReported completeNORTHERN BUILDERS158Check in
Share card: Fung-Wong (Uwan) 2025: flood-control projects in its path

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Track: IBTrACS v04r01, NOAA National Centers for Environmental Information (Knapp et al., 2010), including JTWC data. Recent storms use provisional tracks that may change. Local name assigned by PAGASA. Projects: DPWH flood-control project list; distance is from the project’s reported coordinates to the track line.