YPR GEN CONTRACTOR AND CONST SUPPLY INC is listed as a company organization in Philippine public procurement records on this site, with 217 linked DPWH project(s) totaling about ₱8,581,852,329.23. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
YPR GEN CONTRACTOR AND CONST SUPPLY INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 217
- Total value
- ₱8,581,852,329.23
- Published flags
- 22
- Region
- Metro Manila 1st DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for YPR GEN CONTRACTOR AND CONST SUPPLY INC — not an accusation or finding of wrongdoing.
Score: 83.50 / 100 · Projects in sample: 217 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 67.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 67.7
- lateCompletedProjects
- 8
- onTimeCompletedProjects
- 168
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 215
- pastTargetOngoingProjects
- 39
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 98.6/100 · Weight: 21%
- totalProjects
- 217
- componentScore
- 98.6
- terminatedProjects
- 1
- terminationRatePct
- 0.5
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 216
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 97/100 · Weight: 11%
- projects
- 217
- componentScore
- 97
- flagsPerProject
- 0.1
- publishedV2Flags
- 22
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 217
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 213 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, Romblon24E00118 · ₱289,492,750.90 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLON25E00151 · ₱247,496,687.68 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAY25E00150 · ₱247,496,656.13 · mapped
- Construction of Shore Protection and Coastal Road Development along Barangay Mulawin, Sta. Cruz, Occidental Mindoro23E00151 · ₱241,247,329.30 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON24E00197 · ₱236,395,075.95 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO24E00148 · ₱232,441,162.12 · mapped
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON25E00138 · ₱230,111,469.18 · mapped
- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON25E00147 · ₱229,779,644.03 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR24I00052 · ₱177,897,769.86 · mapped
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGBARUNGIS RIVER WATERWAYS (LS), PTO. PRINCESA CITY, PALAWAN25E00133 · ₱161,782,608.69 · mapped
- REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITY25OG0027 · ₱145,509,402.59 · mapped
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF PILI RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, POBLACION, SAN FERNANDO, ROMBLON25E00139 · ₱144,747,740.90 · mapped
- CONSTRUCTION OF ILOILO CITY FLOOD MITIGATION STRUCTURES ILOILO CITY COMPREHENSIVE FLOOD MITIGATION PROJECT - SECTION 125GJ0052 · ₱143,303,900.68 · mapped
- SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF MAMBURAO SHORE PROTECTION & CAUSEWAY DEVELOPMENT, OCC. MINDORO23E00023 · ₱120,620,173.95 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD, LA UNION (PACKAGE 4)23A00360 · ₱118,799,172.80 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - POBLACION - PUGUIL - TUBADAY ROAD CONNECTING BALAOAN - SANTOL ROAD IN SUPPORT23A00177 · ₱108,614,445.90 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM,CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TAAL LAKE CIRCUMFERENTIAL25DC0045 · ₱108,163,596.00 · mapped
- Construction of Slope Protection at Barangay Narra, San Pedro, Laguna23D00100 · ₱108,079,999.10 · mapped
- ACCESS ROAD LEADING TO MANGINGISDA SEAPORT, 00+000.00 - 00+900.70, 00+920.47 - 03+498.98, 04+784.92 - 04+938, BARANGAY MANGINGISDA, PUERTO PRINCESA CITY25EG0012 · ₱106,789,790.90 · mapped
- Construction of Flood Control Structure along Bilibiran Creek, Binangonan, Rizal23D00077 · ₱106,149,946.50 · mapped
- Construction of Flood Mitigation Structure at East Manggahan River, Phase 2, Barangay San Juan, Taytay, Rizal23D00051 · ₱106,149,488.00 · mapped
- REHABILITATION OF MANSAYA CREEK, ILOILO CITY23G00051 · ₱101,325,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, PIDDIG - CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO - CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 4)23A00308 · ₱98,999,983.27 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE X, CANDELARIA, ZAMBALES24CL0071 · ₱96,499,999.33 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VIII, CANDELARIA, ZAMBALES24CL0070 · ₱96,499,995.30 · mapped
- Construction of Riverbank Protection Structure (Phase III) at Barangay San Roque, Baliuag, Bulacan24CC0024 · ₱96,499,563.20 · mapped
- Construction of Structure for Riverbank Protection along Sta. Rosa River, (near CALAX), Sta. Rosa City, Laguna23DI0053 · ₱96,499,086.72 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V24CL0028 · ₱96,498,298.75 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAMBURAO-PALUAN ROAD, BITUKANG MANOK SECTION (PHASE 1), OCC. MINDORO23E00146 · ₱96,497,725.32 · mapped
- Construction of Concrete Revetment Barangay Pinalpalan, Malita, Davao Occidental23LE0056 · ₱96,488,648.31 · mapped
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 5, SAN NARCISO, ZAMBALES24CL0046 · ₱96,484,076.88 · mapped
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 6, SAN NARCISO, ZAMBALES24CL0048 · ₱95,730,475.31 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN24GA0250 · ₱95,536,333.68 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CATANAUAN RIVER, CATANAUAN, QUEZON (PACKAGE C)25DM0150 · ₱95,053,119.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL AT LAUIS RIVER, PHASE V, CANDELARIA, ZAMBALES23CL0054 · ₱94,591,055.56 · mapped
- CONSTRUCTION OF FLOOD CONTROL AT LAUIS RIVER, PHASE IV, CANDELARIA, ZAMBALES23CL0053 · ₱94,584,467.06 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER, UPSTREAM, PHASE X, BOTOLAN, ZAMBALES23CL0049 · ₱94,569,779.35 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER, UPSTREAM, PHASE IX, BOTOLAN, ZAMBALES23CL0048 · ₱94,569,666.65 · mapped
- Construction of Concrete Revetment, Lawa Flood Control, Don Marcelino, Davao Occidental23LE0020 · ₱77,189,414.06 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE AT STA. ROSA RIVER, NEAR SLEX (UPSTREAM), STA. ROSA CITY, LAGUNA24DI0024 · ₱75,663,050.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS DAANG MAHARLIKA (LZ) - K0081 + 259 - K0082 + 20824D00105 · ₱74,152,023.52 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT POBLACION WIDE AND BARANGAY SAN IGNACIO, GENERAL LUNA, QUEZON24DM0089 · ₱72,375,000.00 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BAMBANG, BULAKAN, BULACAN24CC0326 · ₱72,374,997.19 · mapped
- Construction of Flood Control Structure at Barangay Tangos, Baliuag, Bulacan (K003+200 to K003+500)23CC0253 · ₱72,374,674.87 · mapped
- Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830)23CC0256 · ₱72,374,165.79 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+54123CC0530 · ₱72,372,870.56 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL CENTER FOR MENTAL HEALTH (PACKAGE 4) DESIGNATED AS THE SENATE PRESIDENT NEPTALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY23OB0388 · ₱71,260,406.84 · mapped
- REHABILITATION OF SLOPE PROTECTION ALONG BULI CREEK (LEFT BANK FACING DOWNSTREAM), PASIG CITY (PACKAGE 1)25OB0261 · ₱70,912,508.00 · mapped
- REHABILITATION OF SLOPE PROTECTION ALONG BULI CREEK (LEFT BANK FACING DOWNSTREAM), PASIG CITY (PACKAGE 3)25OB0259 · ₱70,912,500.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 101, ZONE 8, MANILA CITY23OE0236 · ₱67,549,655.23 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- 25DM0150 - Construction of Flood Control Structure₱95,053,119.39· 2025-06-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- Construction of Office Building₱38,417,097.32· 2025-05-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CAPIZ 1ST DEO
- Construction of Iloilo City Flood Mitigation Struc₱143,303,900.68· 2025-05-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOILO CITY DEO
- 25D00292₱97,516,051.34· 2025-05-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- Contract ID No. 25OB0253 - Rehabilitation/Reconst₱47,524,397.30· 2025-03-27· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Rehabilitation/Improvement/Upgrading₱48,817,234.78· 2025-03-19· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- Contract ID No. 24OB0542 - Construction (Completi₱126,779,390.77· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 25DC0045 - ORGANIZATIONAL OUTCOME 2 Protect Live₱108,163,596.00· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS 3RD ED
- Contract ID No. 25OB0259 - Rehabilitation of Slo₱70,912,500.00· 2025-03-14· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Contract ID No. 25OB0261 - Rehabilitation of Slo₱70,912,508.00· 2025-03-14· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 25EG0012-Access Road leading to Mangingisda₱106,789,790.90· 2025-03-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - PALAWAN 3RD DEO
- 25CC0083-Construction of Multi-Purpose Building, B₱38,609,832.24· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25A00284
- 25DI0039₱46,903,691.00· 2025-02-11· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAGUNA II DEO
- 25E00151₱236,169,168.53· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 25E00150₱235,923,489.81· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 25E00147₱229,779,644.03· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 25E00133₱161,782,608.69· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 25E00138₱230,111,469.18· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 25E00139₱137,846,924.53· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 24GA0250
- 23CD0218 - Construction of 4-Storey 8-Classroom₱39,449,290.24· 2024-12-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 2ND DEO
- 24E00279₱11,689,962.15· 2024-10-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 24E00281₱11,690,048.01· 2024-10-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 24A00568
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.