Flood Control and Drainage24CL0070

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VIII, CANDELARIA, ZAMBALES

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VIII, CANDELARIA, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱96,499,995.30. Status: Past target date (DPWH On-Going). Contractor on record: YPR GEN CONTRACTOR AND CONST SUPPLY INC. Figures trace to dpwh.

Zambales 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Follow the peso

3 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVB-24-0008180 · ₱217,502

    Possible match · score 0.56

    DBM release source ↗
  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    98% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Zambales

Based on the coordinates published with the DPWH record and NOAH file Zambales.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Omaya River, San Narciso, Zambales ( Phase 1 )
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-24-0008180

₱217,502.00 · FY2024

Released to President Diosdado Macapagal Memorial National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

217 projects · ₱8.6B total · 22 flags

4. Implementation

Contract Amount

₱96,499,995.30

Progress

Past target date (DPWH On-Going)

Start Date

February 23, 2024

Target End

March 18, 2025

5. Audit