2,047 DPWH public works projects are recorded in Zambales (Region Iii), with start dates from 2016 to 2025. Recorded contract values total about ₱60,004,877,935.98. 1,733 are recorded at 100% progress and 492 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers, Rehabilitation of Flood Mitigation Structure, Sto. Tomas River (Sta. Fe Section), San Marcelino, Zambales₱385,999,637.07
- National Building Program - Buildings and Other Structures - Multipurpose/Facilities, Construction of Subic General Hospital, Subic, Zambales₱289,500,000.00
- Improvement of Sto. Tomas River (Sta. Fe Section) San Marcelino, Zambales Phase 2₱192,999,998.60
- Cssp, Bip, Multi-Purpose Buildings/Facilities to Support Social Services, Construction of Multi-Purpose Building Phase 2, Barangay San Agustin, Castillejos, Zambales₱147,757,478.56
- Construction of Access Road/Diversion Road, Daang Kalikasan to Yamot, Phase 1, Sta. Cruz, Zambales₱143,229,989.00
- Construction of Flood Control Structure Along Marangla River Iba Side, Barangay San Agustin, Iba, Zambales₱143,186,628.72
- Construction of Access Road/Diversion Road, Daang Kalikasan to Lucapon South (Acoje Section), Brgy. Lucapon South, Sta. Cruz, Zambales₱142,679,323.15
- Construction of Slope Protection Structure Along Gabor River (South Side), Phase 1, San Felipe, Zambales₱142,651,110.88
- Construction of Slope Protection/Flood Mitigation Structure Along Bucao River Downstream, Botolan, Zambales (Phase 6)₱138,594,042.95
- Construction of By-Pass and Diversion Roads Subic By-Pass Including Slope Protection, Subic, Zambales₱112,087,101.51
- Construction of Bank Protection Structure Along Marangla River, Downstream, South Approach, Barangay San Agustin, Iba, Zambales Package 3₱107,310,374.31
- Construction of Lauis River-Masinloc Side Flood Mitigation Structure Downstream, Masinloc, Zambales (Phase 5)₱98,999,997.39
- Basic Infrastructure Program (Bip), Public Water Supply System, Construction of Castillejos Water System, Castillejos, Zambales₱98,999,996.56
- Construction of Castillejos Multi-Purpose Building, Castillejos, Zambales₱98,999,996.35
- Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 4)₱98,999,798.68
- Construction of Slope Protection at Lawis River Upstream, Candelaria, Zambales (Phase 2)₱98,999,580.83
- Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 2)₱98,999,501.03
- Construction of Slope Protection at Lawis River, Upstream, Candelaria, Zambales (Phase 4)₱98,999,368.00
- Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 3)₱98,999,273.23
- Construction of Flood Mitigation Structure, Bancal Danac Bunga Section, Botolan, Zambales₱98,910,080.05
- Construction of Flood Alleviation Structure Along Santo Tomas River (Maculcol Dike), Phase 1, San Narciso, Zambales₱98,010,895.44
- Construction of Flood Alleviation Structure Along Santo Tomas River (Maculcol Dike), Phase 2 San Narciso, Zambales₱98,010,835.80
- Construction of Slope Protection at Lawis River Upstream, Candelaria, Zambales (Phase 1)₱98,009,518.07
- Construction of Slope Protection at Lawis River, Upstream, Candelaria, Zambales (Phase 5)₱98,009,417.70
- Construction of Slope Protection at Lawis River, Upstream, Candelaria, Zambales (Phase 6)₱98,009,393.29