CONSTRUCTION OF LAUIS RIVER-MASINLOC SIDE FLOOD MITIGATION STRUCTURE DOWNSTREAM, MASINLOC, ZAMBALES (PHASE 5)
CONSTRUCTION OF LAUIS RIVER-MASINLOC SIDE FLOOD MITIGATION STRUCTURE DOWNSTREAM, MASINLOC, ZAMBALES (PHASE 5) is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱98,999,997.39. Status: Past target date (DPWH On-Going). Contractor on record: JTC CRUZ CONST CO INC 32479. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost