Typhoon mode · October 15, 2025 – October 23, 2025

Fengshen (Ramil) 2025

17,559 DPWH flood-control projects worth ₱872.82B sit within 209.3 km of this storm’s track. Peak sustained wind 51 kt (94 km/h, 1-minute average). Being on this list says nothing about a project’s quality. It is where photos after the storm are most useful.

Send a check-in photo

Track and projects

Red line: storm centre (best track). Shaded band: 209.3 km around the track (median 34-kt wind radius near the Philippines, or 100 km where radii were not reported). Blue dots: projects with DPWH coordinates.

Projects in path

17,559

Contract value

₱872.82B

Reported complete

14,637

Ongoing or not reported

2,922

Largest contractors in the path

  1. SUNWEST INC FORMERLY: SUNWEST CONST162 · ₱20.05B
  2. 11-16 CONST165 · ₱14.68B
  3. ST TIMOTHY CONST CORP226 · ₱12.46B
  4. L R TIQUI BUILDERS INC163 · ₱12.26B
  5. E F CHUA CONST INC125 · ₱10.74B
  6. CENTERWAYS CONST AND DEVELOPMENT INC123 · ₱9.11B
  7. TOPNOTCH CATALYST BUILDERS INC115 · ₱8.60B
  8. LEGACY CONST CORP FORMERLY: LEGACY CONST95 · ₱8.35B
  9. HI-TONE CONST & DEVELOPMENT CORP FORMERLY79 · ₱7.89B
  10. HI-TONE CONST106 · ₱7.72B

By DPWH implementing office

  1. Bulacan 1st DEO742 · ₱37.21B
  2. Region IV-B155 · ₱33.26B
  3. Region V285 · ₱33.19B
  4. BULACAN491 · ₱32.80B
  5. Flood Control Management Cluster155 · ₱30.57B
  6. Albay 2nd DEO383 · ₱20.41B
  7. North Manila DEO371 · ₱19.08B
  8. Bulacan 2nd DEO380 · ₱18.02B
  9. Zambales 1st DEO261 · ₱17.39B
  10. Region VIII123 · ₱16.86B
  11. Metro Manila 1st DEO565 · ₱16.73B
  12. Tarlac DEO299 · ₱16.06B

Satellite before and after

Largest projects in the path with archived imagery. Imagery dates are before and after the contract, not the storm. They are not proof of completion.

Imagery © Esri, Maxar, Earthstar Geographics, and the GIS User Community (World Imagery Wayback).

Projects to check (largest 1,500 of 17,559)

Near one of these? Open the project and use “Check in” to add a dated photo. Faces and plates are blurred automatically.

ProjectPlaceCostStatusContractorkm from track
CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LDFlood Control Management Cluster₱942.7M12% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO10Check in
AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 TFlood Control Management Cluster₱941.2M69% reported progressL R TIQUI BUILDERS INC129Check in
CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROWFlood Control Management Cluster₱934.0M99% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO24Check in
REHABILITATION OF NAPINDAN HYDRAULIC CONTROL STRUCTURES THROUGH DESIGN AND BUILD SCHEME, BRGY. BUTING, PASIG CITYFlood Control Management Cluster₱849.1MReported completeA M ORETA & CO INC 1083Check in
FLOOD CONTROL WORKS-ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGAFlood Control Management Cluster₱761.0MReported completeR U AQUINO CONST AND DEVELOPMENT CORP FO44Check in
DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMARFlood Control Management Cluster₱744.4M87% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY129Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 2 AND 3 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER UPSTREAM OF MARIKINA BRIDGE) STA. 14+100 TO STA. 15+450, LEFT BANK, MARIKINA CITYFlood Control Management Cluster₱714.7M91% reported progressMSB VITUG CONST13Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITYFlood Control Management Cluster₱689.3MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC16Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITYFlood Control Management Cluster₱652.3M99% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO17Check in
ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST FLOODS: IMPROVEMENT OF WATERWAYS/RETARDING PONDS OF PUMPING STATIONS AT WEST OF MANGGAHAN FLOODWAY, C-6 ROAD, WEST MANGGAHAN RD., TAGUIG CITY, METRO MANILANational Capital Region₱596.9MReported completePREMIUM MEGASTRUCTURES INC3Check in
ORGANIZATIONAL OUTCOME 2 PROTECT LIVES AND PROPERTIES AGAINST FLOOD: CONSTRUCTION OF MAYTUNAS PUMPING STATION AND IMPROVEMENT OF MAYTUNAS CREEK AND ITS VICINITY, MANDALUYONG CITYNational Capital Region₱519.4M19% reported progressPREMIUM MEGASTRUCTURES INC3Check in
PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS)National Capital Region₱502.3M95% reported progressMSB VITUG CONST2Check in
CONSTRUCTION OF FLOOD CONTROL PROTECTION DIKE ALONG MUZON RIVER, MALABON, NAVOTAS-OBANDO SECTION, MALABON CITYNational Capital Region₱481.7MReported completeFLORDES CONST & TRADING CORP FORMERLY FLO12Check in
FLOOD CONTROL WORKS-PAMPANGA DELTA DEVELOPMENT PROJECT-PHASE II, CALUMPIT, BULACAN, PROVINCE OF BULACANFlood Control Management Cluster₱472.7M93% reported progressRAYMAN BUILDERS INC29Check in
CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCEFlood Control Management Cluster₱445.3MReported completeMSB VITUG CONST129Check in
LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BATANGAS ACCESS ZONE - WEST SIDE, BATANGAS CITY, SAN PASCUAL AND BAUAN, BATANGASRegion IV-A₱442.9MReported completeTCSC CORP79Check in
CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMARFlood Control Management Cluster₱438.8MReported completeMSB VITUG CONST128Check in
FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALESFlood Control Management Cluster₱420.4MReported completeHORAMABI BUILDERS28Check in
UPGRADING OF CATMON PUMPING STATION, MALABON CITYFlood Control Management Cluster₱416.4MReported completeE F CHUA CONST INC11Check in
PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 9 - CONSTRUCTION OF MALANDAY PUMPING STATION AND ASSOCIATED WORKS, MARIKINA CITYFlood Control Management Cluster₱399.5M95% reported progressJ D LEGASPI CONST14Check in
METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATIONFlood Control Management Cluster₱390.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC7Check in
UPGRADING OF TAPAYAN PUMPING STATION, TAGUIG CITYFlood Control Management Cluster₱389.3MReported completeA M ORETA & CO INC 1084Check in
FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALESZambales 2nd DEO₱386.0MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP12Check in
UPGRADING OF SPINE PUMPING STATION, NAVOTAS CITYFlood Control Management Cluster₱385.0MReported completeA M ORETA & CO INC 1089Check in
UPGRADING/REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND REPAIR OF NAVOTAS NAVIGATIONAL GATE (PHASE I)Flood Control Management Cluster₱382.4MReported completeE F CHUA CONST INC10Check in
FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGAFlood Control Management Cluster₱376.8M72% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO32Check in
CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2)National Capital Region₱376.8M1% reported progressE F CHUA CONST INC4Check in
AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-RFlood Control Management Cluster₱363.2MReported completeMSB VITUG CONST108Check in
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGARegion III₱354.4M0% reported progressFERDSTAR BUILDERS INC20Check in
REVETMENT WORKS ALONG MARULAS TUNGTONG CREEK DIVERSION CHANNEL, LAS PIÑAS CITYFlood Control Management Cluster₱351.8MReported completeE F CHUA CONST INC8Check in
CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN II (YLANG-YLANG RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO CHICO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROWFlood Control Management Cluster₱350.2M96% reported progressMSB VITUG CONST20Check in
CONSTRUCTION OF FLOODGATES NUMBER 3 AND NUMBER 4 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITYFlood Control Management Cluster₱328.1M81% reported progressPRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP33Check in
SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14B, TACLOBAN CITY, LEYTERegion VIII₱313.0M0% reported progressL N R CONST186Check in
SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTERegion VIII₱313.0M0% reported progressSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP186Check in
CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGAFlood Control Management Cluster₱309.6MReported completeNORTHERN BUILDERS35Check in
CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 2), ANGELES-PORAC, PAMPANGAFlood Control Management Cluster₱298.5MReported completeNORTHERN BUILDERS34Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. CAMBAJAO-BRGY. ALIBAGON, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLONRegion IV-B₱297.0M90% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST162Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE MUMPONG RIVER, TUBAN-BATONG BUHAY, BRGY. TUBAN, SABLAYAN, OCC. MINDORORegion IV-B₱291.8M38% reported progressSUNWEST INC FORMERLY: SUNWEST CONST187Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, MUMPONG RIVER, TUBAN-STA. LUCIA, BRGY. TUBAN, SABLAYAN, OCC. MINDORORegion IV-B₱291.5M37% reported progressSUNWEST INC FORMERLY: SUNWEST CONST187Check in
Construction of Camiling-Agno River Floodway, Tarlac, Phase 3CAMILING (TARLAC), TARLAC₱289.5MReported completeBMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP94Check in
Construction of Camiling-Agno River Floodway, Tarlac, Phase 4CAMILING (TARLAC), TARLAC₱289.5MReported completeBMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP93Check in
CONSTRUCTION OF FLOOD CONTROL ALONG ZAPOTE RIVER AND ITS TRIBUTARIES (UPSTREAM), LAS PINAS CITYLas Piñas-Muntinlupa DEO₱289.5MReported completeE F CHUA CONST INC17Check in
FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-PASIG-POTRERO RIVER (BACOLOR SECTION), PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT), PROVINCE OF PAMPANGARegion III₱289.5MReported completeA D GONZALES JR CONST32Check in
SUSTAINABLE INFRASTRUCTURE PROECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CARMEN PORT, SAN AGUSTIN, ROMBLONRegion IV-B₱289.5MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST158Check in
Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island RomblonALCANTARA (ROMBLON), ROMBLON₱289.5MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST163Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MONGPONG, BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORORegion IV-B₱289.5MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST194Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD AND CAUSEWAY FOR TOURISM ALONG AZAGRA PORT, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST TIMOTHY CONST CORP173Check in
Construction of Flood Control Structure (River Training Works) along Mompong River (Downstream), Sablayan, Occidental MindoroSABLAYAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱289.5MReported completeGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC194Check in
CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1Region IV-B₱289.5M62% reported progressST TIMOTHY CONST CORP151Check in
Construction of Road Dike/Esplanade along Pangalaan River (Left Side), Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱289.5MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP129Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CAJIDIOCAN PORT, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST TIMOTHY CONST CORP161Check in
Construction of Road Dike/Esplanade along Sitio Anduyanan, Paluan, Occidental MindoroPALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱289.5MReported completeAMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP136Check in
Construction of Paluan Shore Protection and Causeway Development, Sitio Ipol Section, Occidental MindoroPALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱289.5MReported completeD T RECIO INC138Check in
SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY FOR TOURISM ALONG AMBULONG PORT, MAGDIWANG, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST PIUS CONST AND SUPPLY157Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG POBLACION SAN FERNANDO, SIBUYAN ISLAND, ROMBLONRegion IV-B₱289.5MReported completeST TIMOTHY CONST CORP172Check in
Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, RomblonSAN ANDRES (ROMBLON), ROMBLON₱289.5MReported completeYPR GEN CONTRACTOR AND CONST SUPPLY INC171Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SABLAYAN PORT, ROMBLON, ROMBLONRegion IV-B₱289.5MReported completeST PIUS CONST AND SUPPLY165Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/Region V₱288.5MReported completeSUNWEST INC FORMERLY: SUNWEST CONST29Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE I, NAUJAN, OR. MINDORORegion IV-B₱287.2M86% reported progressSUNWEST INC FORMERLY: SUNWEST CONST137Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. VICTORIA SECTION, PHASE III, SABLAYAN, OCC. MINDORORegion IV-B₱287.1M85% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGAFlood Control Management Cluster₱285.9MReported completeR U AQUINO CONST AND DEVELOPMENT CORP FO34Check in
RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITYFlood Control Management Cluster₱284.5M99% reported progressE M CUERPO INC12Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION (RS), ARMADO, STA. 000+234-STA. 000+900, ABRA DE ILRegion IV-B₱284.3M30% reported progressD T RECIO INC142Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN, STA. 000+000-STA. 000+473.35, SAN JOSE, OCC. MINDORORegion IV-B₱284.2M65% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST206Check in
FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJAFlood Control Management Cluster₱284.2MReported completeNORTHERN BUILDERS57Check in
CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1)South Manila DEO₱283.3M8% reported progressE F CHUA CONST INC3Check in
CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICTRegion V₱281.5MReported completePHILWORKS CONST31Check in
REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND NAVOTAS NAVIGATION GATE (PHASE 3), NAVOTAS CITY (RE-ADVERTISEMENT)National Capital Region₱281.2M65% reported progressANORE CONST10Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 2, BACOOR, CAVITERegion IV-A₱280.7M11% reported progressI&E CONST CORP FORMERLY: I&E CONSTR14Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 1, BACOOR, CAVITERegion IV-A₱280.7M14% reported progressI&E CONST CORP FORMERLY: I&E CONSTR14Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BRRegion V₱280.3MReported completePHILWORKS CONST29Check in
SUSTAINABLE INFRASTRUCTURE POJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG UBI RIVER, BRGY. TAGUMPAY, PHASE V, NAUJAN, OR. MINDORORegion IV-B₱280.2M91% reported progressSUNWEST INC FORMERLY: SUNWEST CONST135Check in
SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. VICTORIA SECTION, PHASE I, SABLAYAN, OCC. MINDORORegion IV-B₱280.2M84% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG DULANGAN RIVER, BRGY. EVANGELISTA, PHASE I, NAUJAN, ORIENTAL MINDORORegion IV-B₱280.1M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST127Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING M,AJOR/STRATEGIC PUBLIC BUILDINGS/FCILITIES- CONST. OF ROAD DIKE ALONG M,AG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE III, NAUJAN, ORIENTAL MINDORORegion IV-B₱280.1M89% reported progressSUNWEST INC FORMERLY: SUNWEST CONST135Check in
REVETMENT AND DREDGING WORKS ALONG STA. 14+038 TO STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITYFlood Control Management Cluster₱280.0MReported completeMSB VITUG CONST16Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILUITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE IV, NAUJAN, OR. MINDORORegion IV-B₱279.9M86% reported progressSUNWEST INC FORMERLY: SUNWEST CONST132Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PJHASE IV, NAUJAN, ORIENTAL MINDORORegion IV-B₱279.9M88% reported progressSUNWEST INC FORMERLY: SUNWEST CONST135Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱279.8MReported completeHI-TONE CONST & DEVELOPMENT CORP FORMERLY31Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRICRegion V₱279.8MReported completeG C I CONST AND DEV'T CORP31Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱279.8MReported completeSUNWEST INC FORMERLY: SUNWEST CONST31Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD DIKE ALONG PATRICK RIVER, BRGY. TAGUMPAY SECTION, PHASE II, SABLAYAN, OCC. MINDORORegion IV-B₱279.7M92% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE II, NAUJAN, OR. MINDORORegion IV-B₱279.7M87% reported progressSUNWEST INC FORMERLY: SUNWEST CONST136Check in
PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE IIFlood Control Management Cluster₱279.6MReported completeNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST1Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. VICTORIA SECTION, PHASE II, SABLAYAN, OCC. MINDORORegion IV-B₱279.6M86% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY.INARAWAN, PHASE II, NAUJAN, OR. MINORTORegion IV-B₱279.4M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST134Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORORegion IV-B₱279.4M82% reported progressSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP134Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE III, NAUJAN, OR. MINDORORegion IV-B₱279.2M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST133Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. TAGUMPAY SECTION, PHASE I, SABLAYAN, OCC. MINDORORegion IV-B₱278.8M94% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PATRICK RIVER, SITIO MANAMOK, BRGY. TAGUMPAY, SABLAYAN, OCC. MINDORORegion IV-B₱277.8M37% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PATRICK RIVER, OLD TAGUMPAY, BRGY. TAGUMPAY, SABLAYAN, OCC. MINDORORegion IV-B₱277.5M37% reported progressSUNWEST INC FORMERLY: SUNWEST CONST175Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORORegion IV-B₱276.2M24% reported progressLE BRON CONST126Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORORegion IV-B₱276.1M30% reported progressANORE CONST125Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN,Region IV-B₱276.0M32% reported progressHGG BUILDERS129Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORORegion IV-B₱276.0M24% reported progressANORE CONST125Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (DOWNSTREAM LS), NAUJAN, OR. MINDORORegion IV-B₱275.8M61% reported progressRAYMAN BUILDERS INC132Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DFIKE, PANGALAAN RIVER, DOWNSTREAM (RIGHT SIDE), PACKAGE A, NAUJAN, OR. MINDORORegion IV-B₱275.7M79% reported progressRAYMAN BUILDERS INC124Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (UPSTREAM LS), NAUJAN, OR. MINDORORegion IV-B₱275.6M60% reported progressRAYMAN BUILDERS INC132Check in
PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE IFlood Control Management Cluster₱271.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC2Check in
Flood Control Works-Abacan River Diking and Slope Protection Works, Mexico, PampangaARAYAT (PAMPANGA), PAMPANGA₱270.2MReported completeA D GONZALES JR CONST & TRADING CO INC47Check in
CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 4+780.00 - STATION 5+480, SECTION 5 PHASE 11, BRGY. STA. CRUZ, TANAUAN, LEYTERegion VIII₱265.3MReported completeSUNWEST INC FORMERLY: SUNWEST CONST197Check in
CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 1+900 - STATION 2+550, SECTION 5 PHASE 9, BRGY. SAN JOAQUIN, PALO, LEYTERegion VIII₱263.4MReported completeWTG CONST196Check in
REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGAFlood Control Management Cluster₱260.3MReported completeSTO CRISTO CONST & TRADING INC FOR: STO CRISTO CONST & TRADING49Check in
CONSTRUCTION OF DRAINAGE SYSTEM/OUTFALL EXTENSION AT MANILA BAYNational Capital Region₱258.6M77% reported progressPREMIUM MEGASTRUCTURES INC1Check in
Flood Control Works - Pasig-Potrero River and San Fernando - Sto. Tomas - Minalin Taildike (San Fernando and Bacolor Section) PampangaCITY OF SAN FERNANDO (CAPITAL) (LA UNION), LA UNION₱257.3MReported completeA D GONZALES JR CONST & TRADING CO INC33Check in
UPPER MARIKINA RIVER IMPV'T./REVETMENT WALL,MARIKINA CITY 1ST LD (CONTRACT PACKAGE 3) RIVER IMPV'T.Flood Control Management Cluster₱256.8MReported completeE M CUERPO INC14Check in
CONSTRUCTION OF TWO (2) PUMPING STATION ALONG NAVOTAS COASTAL DIKE (PHASE 6), NAVOTAS CITYFlood Control Management Cluster₱250.9MReported completeMSB VITUG CONST10Check in
Construction of Road Dike along Bucayao River (East Side), Sitio Malaya Section, Barangay Tagumpay, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeST TIMOTHY CONST CORP137Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLONRegion IV-B₱247.5M93% reported progressYPR GEN CONTRACTOR AND CONST SUPPLY INC194Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAYRegion IV-B₱247.5M94% reported progressYPR GEN CONTRACTOR AND CONST SUPPLY INC194Check in
Construction of Road Dike along Bucayao River (East Side), Sitio Malinao Section, Barangay Tagumpay, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeELITE GEN CONTRACTOR AND DEVELOPMENT CORP138Check in
BASIC INFRASTRUCTURE PROGRAM- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE, BRY. DULANGAN, PTO. GALERA, ORIENTAL MINDORORegion IV-B₱247.5M69% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST113Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORORegion IV-B₱247.5M79% reported progressANORE CONST197Check in
Construction of Road Dike aling Mag-asawang Tubig River, Sampaloc Section, Barangay Sto. Niño, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeRAYMAN BUILDERS INC127Check in
Construction of Road Dike along Mag-asawang Tubig River, Dayapan Section, Barangay Sto. Niño, Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱247.5MReported completeRAYMAN BUILDERS INC128Check in
CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C.Flood Control Management Cluster₱247.1M40% reported progressR U AQUINO CONST AND DEVELOPMENT CORP FO10Check in
Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, CaviteCAVITE₱244.1MReported completeE F CHUA CONST INC17Check in
CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITERegion IV-A₱241.4M90% reported progressSILVERWOLVES CONST CORP24Check in
CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I)Region IV-A₱241.4M92% reported progressSILVERWOLVES CONST CORP24Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱241.2M90% reported progressSUNWEST INC FORMERLY: SUNWEST CONST22Check in
Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines SurBAAO (CAMARINES SUR), CAMARINES SUR₱241.2MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP21Check in
UPGRADING OF MAYPAJO PUMPING STATION, CALOOCAN CITYFlood Control Management Cluster₱241.2MReported completeE F CHUA CONST INC8Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUERegion IV-B₱241.2M87% reported progressSARGASSO CONST95Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF TUGDAN CAUSEWAY, ALCANTARA, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST191Check in
Construction of Flood Control Structure along Libtangin River, Barangay Mangiliol Section, Gasan, MarinduqueGASAN (MARINDUQUE), MARINDUQUE₱241.2MReported completeHGG BUILDERS & SUPPLY96Check in
Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos SurTAGUDIN (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST188Check in
FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORORegion IV-B₱241.2M71% reported progressEIGHT J'S CONST SERVICES150Check in
SUSTAINABLE INFRASTCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLI BUILDINGS/FACILITIES- CONST. OF TABLAS EAST COAST BOULEVARD, SANTA MARIA, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2MReported completeLEGACY CONST CORP FORMERLY: LEGACY CONST182Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORORegion IV-B₱241.2M76% reported progressNEW RICH GEN CONTRACTOR SERVICES & TRADING CO INC150Check in
FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIORegion IV-B₱241.2M82% reported progressEIGHT J'S CONST SERVICES150Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORORegion IV-B₱241.2M81% reported progressEIGHT J'S CONST SERVICES150Check in
Construction of Flood Control Structure along Abra de Ilog River, Sitio Kuli-Kuli Section, Armado, Abra de Ilog, Occidental MindoroABRA DE ILOG (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱241.2MReported completeGOLDEN J'S CONST SERVICES142Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 1, BRGY. SAN VICENTE, SANTA CRUZ, OCRegion IV-B₱241.2MReported completeSILVERWOLVES CONST CORP151Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUERegion IV-B₱241.2M74% reported progressHGG BUILDERS76Check in
Construction of Road Dike/Esplanade along Pangalaan River (Right Side), Naujan, Oriental MindoroNAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO₱241.2MReported completeGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC126Check in
Construction of Road Dike/Esplanade along Sitio Katanlawan, Paluan, Occidental MindoroPALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱241.2MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP137Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 2, BRGY. SAN VICENTE, SANTA CRUZ, OCRegion IV-B₱241.2MReported completeSILVERWOLVES CONST CORP151Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVER CONTROL STRUCTURE ALONG MAYHA-TULAY RIVER, ODIONGAN, ROMBLONRegion IV-B₱241.2M83% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST188Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. CARMEN SECTION, SAN AGUSTIN, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2M87% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST157Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, PERLAS SECTION, WAWA, ABRA DE ILOG, OCC. MINDORORegion IV-B₱241.2M83% reported progressST TIMOTHY CONST CORP123Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAANRegion III₱241.2M98% reported progressJASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S8Check in
Construction of Paluan Shore Protection and Causeway Development, Sitio Malugao Section, Occidental MindoroPALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱241.2MReported completeD T RECIO INC138Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (DOWNSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2M82% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST163Check in
FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLONRegion IV-B₱241.2M87% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST163Check in
Construction of Flood Control Structure along Abra de Ilog River, Cabacao Section, Abra de Ilog, Occidental MindoroABRA DE ILOG (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO₱241.2MReported completeGOLDEN J'S CONST SERVICES139Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MOCONG, BASUD, CAMARINES NORTE, BASUD, CRegion V₱240.1M93% reported progressBRENTMIN ROOFING ENT23Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BASUD RIVER, BARANGAY MAMPILI, BASUD, CAMARINES NRegion V₱240.1M93% reported progressBRENTMIN ROOFING ENT24Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUERegion IV-B₱239.9M63% reported progressHGG BUILDERS72Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 1, BRGY. MULAWIN, NAUJAN, OR. MINDORORegion IV-B₱239.3M35% reported progressHGG BUILDERS130Check in
CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 2+550 - STATION 3+180, SECTION 5 PHASE 10, BRGY. SAN JOAQUIN, PALO, LEYTERegion VIII₱239.0MReported completeSUNWEST INC FORMERLY: SUNWEST CONST196Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION, BUENAVISTA, MARINDUQUERegion IV-B₱238.9M87% reported progressSARGASSO CONST99Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGERegion V₱238.7M90% reported progressE GARCIA CONST CORP FOR E GARCIA CONST25Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ILVITA RIVERBANK PROTECTION WORKS ALONG AMNAY RIVER (DOWNSTREAM), SABLAYAN, OCC. MINDORORegion IV-B₱238.3M80% reported progressANORE CONST172Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGARegion V₱237.4M92% reported progressHGG BUILDERS & SUPPLY31Check in
FLOOD CONTROL WORKS - REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED PAMPANGA RIVER BANK INCLUDING CANDABA CUT-OFF CHANNEL, PAMPANGA AND NUEVA ECIJAFlood Control Management Cluster₱237.1MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC39Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), STA. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORORegion IV-B₱237.0M52% reported progressADSL CONST & TRADING124Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADFE ALONG PATRICK RIVER (UPSTREAM), BRGY. SAN FRANCISCO-BRGY. PAETAN SECTION, STA. 000+668.34-STA. 001+000 (Region IV-B₱236.9M9% reported progressSILVERWOLVES CONST CORP173Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-STA. 000+305.50, CALAPAN, OR. MINDORORegion IV-B₱236.9M38% reported progressADSL CONST & TRADING124Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG PATRICK RIVER (UPSTREAM), BRGY. PAETAN-BRGY. TAGUMPAY, STA.01+010-STA. 001+335.99 (LEFT SIDE), SABRegion IV-B₱236.9M64% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST173Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG PATRICK RIVER (DOWNSTREAM), BRGY. PAETAN-BRG. TAGUMPAY, STA. 001+345-STA. 001+639.06 (LEFT SIDE), SRegion IV-B₱236.9M62% reported progressLEGACY CONST CORP FORMERLY: LEGACY CONST173Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGERegion V₱236.4MReported completeE GARCIA CONST CORP FOR E GARCIA CONST24Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLONRegion IV-B₱236.4MReported completeYPR GEN CONTRACTOR AND CONST SUPPLY INC157Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTERegion VIII₱236.2M20% reported progressEZJONES CONST INC193Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITYRegion VIII₱236.1M31% reported progressEZJONES CONST INC177Check in
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORORegion IV-B₱236.1M71% reported progressALRIE CONST SERVICES151Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH FLOOD CONTROL DIKE, BARANGAY BATAN,Region V₱235.9M77% reported progressSUNWEST INC FORMERLY: SUNWEST CONST6Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱235.7M87% reported progressSUNWEST INC FORMERLY: SUNWEST CONST21Check in
CONSTRUCTION OF TWO (2) FLOODGATES ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY(CONSTRUCTION OF FLOODGATE NO. 1 AND ELECTRICAL WORKS FOR FLOODGATES NO. 1 AND 2)Flood Control Management Cluster₱235.5M0% reported progressPRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP9Check in
CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCTCatanduanes DEO₱235.3M0% reported progressG C I CONST AND DEV'T CORP45Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DAET RIVER, BARANGAY BIBIRAO, DAERegion V₱235.2M95% reported progressE GARCIA CONST CORP FOR E GARCIA CONST25Check in
CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, DOWNSTREAM, PHASE 2, SAN JUAN, BATANGASRegion IV-A₱235.2M0% reported progressSTRUKTURA TEKNIKA SERVICES CO58Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 2, BRGY. SAN LUIS, NAUJAN, OR. MINDORRegion IV-B₱234.3M87% reported progressGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC131Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BARegion V₱234.0M89% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST20Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, BARANGAY CAHABAAN,Region V₱234.0M80% reported progressHGG BUILDERS & SUPPLY28Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAYRegion V₱234.0M84% reported progressBRENTMIN ROOFING ENT19Check in
Construction of Pumping Station along Veinte Reales, Valenzuela CityCITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY₱234.0MReported completeTOUGHBUILT CONST & TRADING INC / AKN CONST CORP17Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TALISAY RIVER, BARANGAY BINARegion V₱234.0M96% reported progressHGG BUILDERS & SUPPLY30Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMARRegion V₱234.0M89% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST23Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. AGUAS, RIZAL, OCC. MINDORegion IV-B₱232.8M88% reported progressSUNWEST INC FORMERLY: SUNWEST CONST206Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. PITOGO, RIZAL, OCC. MINDORRegion IV-B₱232.8M82% reported progressSUNWEST INC FORMERLY: SUNWEST CONST208Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TORRIJOS SHORE PROTECTION STRUCTURE, BRGY. POBLACION, TORRIJOS, MARINDUQUERegion IV-B₱232.8M89% reported progressHGG BUILDERS87Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SEAWALL, BRGY. MORALES SECTION, STA. CRUZ, MARINDUQUERegion IV-B₱232.8M70% reported progressHGG BUILDERS70Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROAD/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SANTA CRUZ SEAWALL, BRGY. TAGUM-BGRY. MORALES SECTION, STA. CRUZ, MARINDUQUERegion IV-B₱232.8M91% reported progressHGG BUILDERS71Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION STRUCTURE, BRGY. TUNGIB-LIPATA, BUENAVISTA, MARINDUQUERegion IV-B₱232.7M90% reported progressHGG BUILDERS100Check in
FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG, SITIO KALINYAWAN SECTION, SAN VICENTE, ABRA DE ILOG, OCC. MINDORORegion IV-B₱232.6M72% reported progressANORE CONST132Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE I, BRGY. SAN LUIS, NAUJAN, OR. MINDORRegion IV-B₱232.4M82% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST131Check in
CONSTRUCTION OF FLOODGATES NUMBER 5 AND NUMBER 6 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITYFlood Control Management Cluster₱231.6M82% reported progressHALREY CONST INC32Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (UPSTREAM), STA. 000+330-STA. 000+649.50, BONGABONG, OR. MINDORRegion IV-B₱231.5M28% reported progressJJPR CONST SERVICES180Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOMPONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORORegion IV-B₱231.3M30% reported progressANORE CONST192Check in
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORORegion IV-B₱231.2M0% reported progressGOLDEN J'S CONST SERVICES151Check in
FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (DOWNSTREAM), STA. 000+680-STA. 000+995.85, BONGABONG, O.Region IV-B₱231.1M45% reported progressJIIK CONST SERVICES180Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (UPSTREAM/LS), STA. CRUZ, OCC. MINDORORegion IV-B₱231.1M60% reported progressD T RECIO INC163Check in
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORORegion IV-B₱231.0M0% reported progressGOLDEN J'S CONST SERVICES150Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORORegion IV-B₱231.0M60% reported progressD T RECIO INC164Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, MOMPONG RIVER,BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORORegion IV-B₱230.2M61% reported progressANORE CONST194Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER, BRGY. CONRAZON, BANSUD, OR. MINDORORegion IV-B₱230.1M59% reported progressLE BRON CONST161Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORORegion IV-B₱230.1M46% reported progressALRIE CONST SERVICES150Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLONRegion IV-B₱230.1M90% reported progressYPR GEN CONTRACTOR AND CONST SUPPLY INC171Check in
CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER DOWNSTREAM, GLORIA, OR. MINDORORegion IV-B₱230.1M78% reported progressJIIK CONST SERVICES150Check in
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORORegion IV-B₱230.1M43% reported progressANORE CONST138Check in
Share card: Fengshen (Ramil) 2025: flood-control projects in its path

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Track: IBTrACS v04r01, NOAA National Centers for Environmental Information (Knapp et al., 2010), including JTWC data. Recent storms use provisional tracks that may change. Local name assigned by PAGASA. Projects: DPWH flood-control project list; distance is from the project’s reported coordinates to the track line.