FERDSTAR BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 139 linked DPWH project(s) totaling about ₱8,850,577,317.87. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
FERDSTAR BUILDERS INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 139
- Total value
- ₱8,850,577,317.87
- Published flags
- 1
- Region
- Pampanga 1st DEO · Region III
Online presence
Google Maps: Ferdstar Builders Contractors★ 4.6 (9 reviews)Google Maps, 2026-10-22
San Antonio, Lubao, Pampanga, Lubao, Pampanga
Licensed officers (PCAB)
- GABRIEL BELTRAN SI · Authorized Managing Officer (PCAB license 04965) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for FERDSTAR BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 88.70 / 100 · Projects in sample: 139 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 79.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 79.1
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 114
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 134
- pastTargetOngoingProjects
- 14
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 139
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 139
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 139
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 139
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 129 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA24C00593 · ₱354,433,922.79 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 3, PROVINCE OF PAMPANGA20C00022 · ₱192,996,676.29 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ABACAN RIVER, DIKING AND SLOPE PROTECTION WORKS-PHASE 2, MEXICO, PAMPANGA25C00068 · ₱170,115,933.14 · mapped
- PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY22O00063 · ₱148,392,701.82 · mapped
- Flood Control Works - Diking/Slope Protection of Pasig-Potrero River, Bacolor and Porac, Pampanga23C00055 · ₱144,750,000.00 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 5, PROVINCE OF PAMPANGA20C00025 · ₱144,746,918.04 · mapped
- FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT BARANGAY CANDELARIA, MACABEBE, PAMPANGA25CG0033 · ₱140,417,105.28 · mapped
- FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PAMPANGA RIVER BANK, BARANGAY SULIPAN, APALIT, PAMPANGA25CG0019 · ₱140,407,405.40 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE,25CG0088 · ₱140,262,750.00 · mapped
- LOCAL PROGRAMS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION/IMPROVEMENT/UPGRADING OF LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (PHASE 4), PAMPANGA18C00084 · ₱139,209,338.01 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF ROADA AND DRAINAGE IN ANGELES CITY, PAMPANGA24CI0064 · ₱117,211,296.88 · mapped
- FLOOD CONTROL WORKS-SLOPE PROTECTION WORKS ALONG STA. FE AND STA. FILOMENA ALONG GUAGUA, PAMPANGA19C00040 · ₱96,867,382.37 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DREDGING OF TALISAY RIVER (TORTUGAS SECTION), BALANGA CITY, BATAAN18CB0036 · ₱96,500,000.00 · mapped
- CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN23CC0586 · ₱96,499,960.90 · mapped
- Construction of River Protection Structure along Calero River and Its Tributaries, Barangay Atlag, Malolos City, Bulacan23CC0236 · ₱96,498,343.32 · mapped
- CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY POBLACION, CALUMPIT, BULACAN23CC0474 · ₱96,498,182.21 · mapped
- Construction of River Protection Structure along Calero River and Its Tributaries, Barangay Masile, Malolos City, Bulacan23CC0242 · ₱96,497,317.65 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA24CH0155 · ₱96,494,261.43 · mapped
- Rehabilitation of Slope Protection Works including Roads along Sapang Maragul River Dike (Betis Section), Betis, Guagua, Pampanga24CH0097 · ₱96,494,237.11 · mapped
- Rehabilitation of Slope Protection along Upper Dalan Bapor, Phase II, at Sasmuan, Pampanga23CH0062 · ₱96,494,018.96 · mapped
- Construction of Slope Protection Works along Guagua River (Betis Section), Phase 2, Betis, Guagua, Pampanga24CH0087 · ₱96,493,832.58 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SAN MIGUEL SECTION, GUAGUA, PAMPANGA24CH0154 · ₱96,493,124.55 · mapped
- Construction of Slope Protection Structure along Betis River and its Tributaries at Guagua, Pampanga22CH0082 · ₱96,491,313.16 · mapped
- Rehabilitation/Improvement of Guagua River, Sta. Ursula-San Rafael, Guagua, Pampanga22CH0064 · ₱96,476,999.14 · mapped
- Construction of Slope Protection along Angeles-Porac Bypass Road (Phase II), Porac, Pampanga22CH0002 · ₱96,143,949.95 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - PRIMARY ROADS, JOSE ABAD SANTOS AVENUE (JASA), PAMPANGA 3R16C00027 · ₱94,711,901.00 · mapped
- Construction of Slope Protection Structure, Sacobia-Bamban River, Left Bank, Brgy. San Francisco, Concepcion, Tarlac22CK0077 · ₱93,169,679.22 · mapped
- Construction of Slope Protection Structure, Sacobia-Bamban River, Left Bank, Brgy. Sta. Rita, Concepcion, Tarlac22CK0079 · ₱93,168,832.14 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF APALIT BRIDGE AND BYPASS ROAD AT BARANGAY TABUYUC, APALIT, PAMPANGA23CG0039 · ₱93,122,467.02 · mapped
- NATIONAL BUILDING PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA23CG0038 · ₱93,122,365.82 · mapped
- CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT MAMBOG CREEK, PHASE II, MALOLOS CITY, BULACAN25CC0327 · ₱92,712,522.71 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE AND SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, PANIQUI - CAMILING SECTION (LEFT DIKE), PANIQUI AND CAMILING, TARLAC STA 0+000 - STA 0+77117CJ0079 · ₱92,600,332.80
- CONSTRUCTION OF PUMPING STATION AND FLOOD GATE, PHASE II, BARANGAY MERCADO, HAGONOY, BULACAN25CC0318 · ₱92,555,425.94 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN24CC0522 · ₱92,537,559.25 · mapped
- CONSTRUCTION OF PUMPING STATION AND FLOOD GATE, PHASE II, BARANGAY IBA, HAGONOY, BULACAN25CC0317 · ₱92,495,717.15 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE AND SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, PANIQUI - CAMILING SECTION (LEFT DIKE), PANIQUI AND CAMILING, TARLAC STA 0+771 - STA 1+54217CJ0080 · ₱92,466,746.23
- REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT TABUYUC, APALIT, PAMPANGA19CG0056 · ₱91,646,012.89 · mapped
- REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT BUAS, CANDABA, PAMPANGA19CG0034 · ₱91,579,098.90 · mapped
- REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG MANDASIG (PHASE I), CANDABA, PAMPANGA18CG0114 · ₱91,578,300.20 · mapped
- REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT GULAP, CANDABA, PAMPANGA19CG0032 · ₱91,578,045.60 · mapped
- REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. CATALINA (PHASE II), SAN LUIS, PAMPANGA18CG0091 · ₱91,291,717.10 · mapped
- RESTORATION OF DIKE WITH SLOPE PROTECTION ALONG POTRERO RIVER MANCATIAN PORAC, PAMPANGA PHASE II. STA. 0+000-STA. 0+461.36, PORAC, PAMPANGA18CH0153 · ₱85,361,590.06 · mapped
- FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, RANG AYAN - NANCAMARINAN SECTION, PANIQUI, TARLAC19CJ0045 · ₱83,376,900.37 · mapped
- REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, REHABILITATION/IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT CANDATING, ARAYAT, PAMPANGA, PROVINCE OF PAMPANGA19C00050 · ₱82,933,012.67 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG SAPANG MARAGUL DIVERSION CHANNEL, SAN JUAN NEPOMUCENO, GUAGUA, PAMPANGA20CH0004 · ₱77,368,361.95 · mapped
- Construction of Flood Mitigation Structures along Barangay Balubad, Bulacan, Bulacan23CC0136 · ₱77,198,713.48 · mapped
- Construction/improvement of Flood Mitigation Structure at Panducot, Calumpit, Bulacan24CC0178 · ₱77,182,692.83 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT SANTO ROSARIO, MALOLOS CITY, BULACAN24CC0180 · ₱74,111,429.79 · mapped
- Construction of Riverbank Protection Structure at Barangay Pagala, Baliuag, Bulacan24CC0036 · ₱72,374,181.80 · mapped
- Construction of Slope Protection Structure at Sapang Maragul River Bank, Guagua, Pampanga22CH0085 · ₱72,358,811.49 · mapped
Equipment & capacity
PCAB license
- License no.
- 04965
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- May 18, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 04965); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
18 evaluations listed across 4 GPPB CPES releases; average final rating 92.0% over 10 rated projects; 18 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 11, 2025 | NIA | ₱148,726,880.00 | Completed | 91.9% | 91.9% | 40th, p. 110 |
| Nov 3, 2025 | NIA | ₱97,036,474.00 | Completed | 88.9% | 88.9% | 40th, p. 110 |
| Nov 3, 2025 | NIA | ₱142,231,775.00 | Completed | 88.9% | 88.9% | 40th, p. 110 |
| Jul 28, 2025 | NIA | ₱135,471,635.00 | Completed | 91.2% | 91.2% | 40th, p. 110 |
| Jul 28, 2025 | NIA | ₱193,613,105.00 | On-going | 84.6% | — | 40th, p. 110 |
| Jul 20, 2025 | NIA | ₱188,969,997.00 | Completed | 88.2% | 88.2% | 40th, p. 110 |
| Jun 25, 2025 | DPWH | ₱96,493,832.00 | Completed | 90.2% | 92.8% | 40th, p. 109 |
| May 4, 2025 | DPWH | ₱96,494,237.00 | Completed | 93.0% | 94.0% | 40th, p. 109 |
| Feb 10, 2025 | DPWH | ₱43,100,435.00 | On-going | 94.8% | — | 39th (rev), p. 69 |
| Feb 10, 2025 | DPWH | ₱117,211,297.00 | Completed | 93.3% | 95.1% | 39th (rev), p. 69 |
| Oct 23, 2024 | DPWH | ₱96,494,237.00 | On-going | 94.6% | — | 39th (rev), p. 69 |
| Aug 12, 2024 | DPWH | ₱117,211,297.00 | On-going | 96.3% | — | 38th, p. 83 |
Showing the 12 most recent of 18.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- NCB-RO2-ISA04-25₱242,351,001.81· 2025-05-16· Other construction· NATIONAL IRRIGATION ADMINISTRATION - REGIONAL OFFICE NO. 2
- NCB-INFRA-ISA55-25-EGPIP-CAUAYANP3₱49,291,048.31· 2025-03-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - ISABELA IRRIGATION MANA
- NCB-INFRA-ISA57-25-EGPIP-CAUAYANP3₱49,293,028.31· 2025-03-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - ISABELA IRRIGATION MANA
- NCB-INFRA-ISA54-25-EGPIP-CAUAYANP3₱49,292,236.31· 2025-03-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - ISABELA IRRIGATION MANA
- NCB-INFRA-ISA58-25-EGPIP-CAUAYANP3₱49,293,028.31· 2025-03-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - ISABELA IRRIGATION MANA
- NCB-INFRA-ISA56-25-EGPIP-CAUAYANP3₱49,292,764.31· 2025-03-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - ISABELA IRRIGATION MANA
- 5th District Solar Pump Irrigation Project of Pang
- 6th District Solar Pump Irrigation Project of Pang
- 3rd District Solar Pump Irrigation Project of Pang
- 4th District Solar Pump Irrigation Project of Pang
- Construction Project
- Construction Project
- Construction Project
- NIAR3-2024-SOLAR-35
- NIAR3-2024-SOLAR-36
- 2024-EOD-DV-SPIP-002
- 2024-EOD-DV-SPIP-001
- 2024-EOD-DIII-SPIP-002
- 2024-EOD-DII-SPIP-001
- 2024-EOD-DIV-SPIP-002
- 2024-EOD-DIV-SPIP-003
- 2024-EOD-DVI-SPIP-001
- 2024-EOD-DI-SPIP-001
- 2024-EOD-DIV-SPIP-001
- 2024-EOD-DIII-SPIP-001
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →