HI-TONE CONST & DEVELOPMENT CORP FORMERLY is listed as a company organization in Philippine public procurement records on this site, with 175 linked DPWH project(s) totaling about ₱17,122,607,274.81. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
HI-TONE CONST & DEVELOPMENT CORP FORMERLY
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 175
- Total value
- ₱17,122,607,274.81
- Published flags
- 10
- Region
- Region V · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for HI-TONE CONST & DEVELOPMENT CORP FORMERLY — not an accusation or finding of wrongdoing.
Score: 75.30 / 100 · Projects in sample: 175 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 48.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 48.9
- lateCompletedProjects
- 13
- onTimeCompletedProjects
- 101
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 167
- pastTargetOngoingProjects
- 53
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 175
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 175
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.8/100 · Weight: 11%
- projects
- 175
- componentScore
- 98.8
- flagsPerProject
- 0.04
- publishedV2Flags
- 7
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 175
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 171 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR19Z00033 · ₱744,417,054.53 · mapped
- LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF BICOL REGIONAL HOSPITAL AND MEDICAL CENTER (MEDICAL ARTS BUILDING AND FACILITIES, PATIENT'S ROOM AND TRAINING CENTER), DARAGA, ALBAY, DARAGA,23F00157 · ₱475,348,478.38 · mapped
- LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTON 0F BICOL UNIVERSITY CONVENTION AND DISASTER RISK REDUCTION MANAGEMENT CENTER, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)24F00442 · ₱374,419,055.03 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC23F00277 · ₱279,849,916.10 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF COASTAL ROAD AND SHORE P24F00509 · ₱279,365,912.48 · mapped
- CONSTRUCTION OF NBI BUILDING, REGIONAL OFFICE V, REGIONAL GOVERNMENT CENTER, RAWIS, LEGAZPI, ALBAY (2ND LEGISLATIVE DISTRICT)23F00345 · ₱241,536,103.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION AT SALVACION TO BUHATAN (PACKAGE 1), STO. DOMIN23F00445 · ₱202,648,863.01 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, C23F00041 · ₱192,999,743.01 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC,24F00072 · ₱192,999,234.99 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF PAJO BAGUIO FLOOD CONTROL STRUCTURE,PAJO BAGUIO, VIRAC, CATANDUANES, VIRAC, C24F00075 · ₱192,059,099.99 · mapped
- LOCAL PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF DPWH REGIONAL OFFICE V - RES COMPOUND, LEGAZPI CITY, ALBAY21F00066 · ₱188,173,871.35 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, OBI, CARAMORAN, CATANDUANES, CARAM24F00074 · ₱187,209,975.99 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION (COMPLETION) OF BRIDGE,BARANGAY PAWA TO BARANGAY BOGTONG,LEGAZPI CITY,24FB0221 · ₱187,143,356.73 · mapped
- LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONSTRUCTION OF BY PASS ROAD FROM MAHARLIKA HIGHWAY (LEGASPI - TABACO ROAD) TO DUTERTE HIGHWAY, LEGAZPI CITY, ALBAY21FB0133 · ₱186,583,372.62 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI - PURPOSE BLDG. (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERENCES FOR EDUCATION, SPORTS BUILDING (MICES) AND PRIMARY24FB0228 · ₱173,248,450.87 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS_FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SIRANGAN, SORSOGON CITY22FK0051 · ₱148,499,812.48 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BARIW-NAHAPUNAN-TAMBUNGO24F00296 · ₱145,466,893.58 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (SORSOGON PILOT ELEMENTARY SCHOOL), BRGY. TALISAY, SORSOGON CITY24FK0034 · ₱145,114,421.58 · mapped
- CONSTRUCTION OF LALUD-GARCHITORENA ROAD (SAGRADA SECTION) STA.37+200 - STA.39+200 (PACKAGE 8), GARCHITORENA, CAMARINES SUR24FG0121 · ₱144,750,000.00 · mapped
- CONSTRUCTION OF LALUD - GARCHITORENA ROAD (SAGRADA SECTION) STA.40+200 - STA. 42+200 (PACKAGE 9), GARCHITORENA, CAMARINES SUR24FG0106 · ₱144,750,000.00 · mapped
- CONSTRUCTION OF LALUD - GARCHITORENA ROAD (BAHI-AZON SECTION) STA.48+765 - STA. 50+765 (PACKAGE 11) GARCHITORENA, CAMARINES SUR24FG0109 · ₱144,750,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KULASI RIVER (UPSTREAM - DAHAT SECTION) PACKAGE 1, LAGONOY, CAMARINES SUR24FG0122 · ₱144,750,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTION FACILITY/MEETINGS, INCENTIVES, CONFERENCES FOR EDUCATION AND SP24F00479 · ₱144,044,046.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY. BANUANG GURANG, DONSOL23FK0091 · ₱142,767,107.04 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG OBI RIVER UPSTREAM STA. 5+313-STA. 5+813 OBI, CARAMORAN,23F00434 · ₱140,407,052.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DUGUE-SAN VICENTE ROAD LEADING TO NATI23F00430 · ₱140,406,779.13 · mapped
- LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTIPURPOSE BUILDING, CAMP OLA, PHASE 2, LEGAZPI CITY, CAMP OLA, LEGAZPI CITY, ALBAY 2ND LD22F00086 · ₱140,380,943.43 · mapped
- Construction of Riverbank Protection/Esplanade along Barit River, Brgy. Sagrada Familia Section Phase 2, Buhi, Camarines Sur23FN0044 · ₱139,859,923.40 · mapped
- Construction of Riverbank Protection/Esplanade along Barit River, Brgy. Sta. Justina Section, Buhi, Camarines Sur23FN0041 · ₱139,819,182.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - CONSTRUCTION OF ROCK CAUSEWAY AT MOROCBOROCAN, RAPU-RAPU, ALBAY24FB0186 · ₱139,569,859.47 · mapped
- Construction/Improvement of Bagong San Roque Flood Control, Sto. Domingo, Albay22F00003 · ₱138,413,784.20 · mapped
- RENOVATION / EXPANSION OF UNIVERSITY HEALTH SERVICE BUILDING, UP DILIMAN, QUEZON CITY20OG0121 · ₱136,809,679.69 · mapped
- SIPAG - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION, BAGACAY, LEGAZPI CITY, ALBAY (PHASE 3)24FB0026 · ₱135,184,349.20 · mapped
- CONSTRUCTION OF LALUD - GARCHITORENA ROAD (SAGRADA SECTION) STA.34+576 - STA. 36+200 (PACKAGE 7), GARCHITORENA, CAMARINES SUR24FG0105 · ₱130,275,000.00 · mapped
- RENOVATION OF UNIVERSITY HEALTH SERVICE, UP DILIMAN, QUEZON CITY18OG0130 · ₱121,231,002.20 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION (COMPLETION) OF PAWA-BOGTONG BRIDGE ALONG SAN JOAQUIN-PAWABOGTONG ROAD24FB0222 · ₱115,783,456.63 · mapped
- Construction of Obi River Control Structures, Brgy. Obi, Caramoran, Catanduanes22F00151 · ₱110,974,607.10 · mapped
- Rehabilitation of Flood Control Structure at Binagasbasan, Brgy. Paraiso, San Miguel, Catanduanes22F00148 · ₱110,916,629.20 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-BACON-MANITO ROAD, PACKAGE 2, SORSOGON, SORSOGON CITY, SORSOGON 1ST LEGISLATIVE DISTRICT21F00069 · ₱106,149,992.33 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS)-CONSTRUCTION OF POLICE REGIONAL HEADQUARTERS BUILDING, LEGA22F00089 · ₱102,928,548.06 · mapped
- Construction of River Protection Structures at Telegrapo River (Downstream), Lidong , Sto. Domingo, Albay23FA0027 · ₱99,000,000.00 · mapped
- CONSTRUCTION OF LIBRARY AND INFORMATION SCIENCES BUILDING, UP DILIMAN, QUEZON CITY19OG0172 · ₱97,504,639.63 · mapped
- LOCAL PROGRAM-MULTI-PURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF PROVINCIAL CAPITOL BUILDING (PHASE I) SORSOGON CITY21FK0017 · ₱96,510,596.12 · mapped
- CONSTRUCTION OF SORSOGON CONVENTION CENTER (PHASE II), SORSOGON CITY18FK0050 · ₱96,505,199.95 · mapped
- Construction of Flood Mitigation Structure along Barit River, Antipolo Old Section, Barangay Antipolo, Nabua, Camarines Sur24FN0008 · ₱96,500,000.00 · mapped
- Construction of Golpeo Street Flood Control Project, Managanaga-Zone 7 Phase 1, Bulan, Sorsogon23FL0007 · ₱96,500,000.00 · mapped
- Construction of River Dike at San Andres, Sto. Domingo, Albay23FA0020 · ₱96,500,000.00 · mapped
- Construction of River Dike at Bagong San Roque, Sto. Domingo, Albay23FA0022 · ₱96,500,000.00 · mapped
- Construction of River Protection Structure at Telegrapo River (Downstream), Lidong, Santo Domingo, Albay23FA0023 · ₱96,500,000.00 · mapped
- Construction of River Dike at barangay Canaway, Malilipot, Albay23FA0021 · ₱96,500,000.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →