TOPNOTCH CATALYST BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 241 linked DPWH project(s) totaling about ₱13,551,575,770.23. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
TOPNOTCH CATALYST BUILDERS INC
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 241
- Total value
- ₱13,551,575,770.23
- Published flags
- 65
- Region
- Bulacan 1st DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for TOPNOTCH CATALYST BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 69.00 / 100 · Projects in sample: 241 · As of Oct 28, 2026 UTC
Grade capped at D (max 69/100; 77.6 before the cap) because one project linked to this contractor is the subject of published reports by official bodies or credible news outlets. These are reports by the sources named below, not findings of this site, and they may be disputed.
Commission on Audit (fraud audit report), as reported by rappler.com (2025-09-25), reported work reported as not built or not found on contract 25CC0151 — Riverbank protection structure (Package A), Brgy. Bulihan (Sitio Dulo):
“COA found that the original site was already occupied by another flood control project attributable to a different contract altogether”
Read the source (rappler.com)
The contractor may respond to these reports: submit a right of reply.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 55.6/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 55.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 143
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 201
- pastTargetOngoingProjects
- 57
- undatedCompletedProjectsExcluded
- 10
- Termination rate
Component score: 98.8/100 · Weight: 21%
- totalProjects
- 241
- componentScore
- 98.8
- terminatedProjects
- 1
- terminationRatePct
- 0.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 240
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 92.9/100 · Weight: 11%
- projects
- 241
- componentScore
- 92.9
- flagsPerProject
- 0.24
- publishedV2Flags
- 57
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 241
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 238 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 3, BRGY. SAN LUIS, NAUJAN, OR. MINDOR24E00160 · ₱185,972,759.19 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT FILINVEST, BARANGAY BAGONGSILANGAN, QUEZON CITY24OF0263 · ₱143,287,902.50 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK25CP0070 · ₱142,491,455.95 · mapped
- CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONSTRUCTION OF ROAD, PHASE I, SITIO DUPLAS, BARANGA25CP0064 · ₱142,491,200.58 · mapped
- CONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAAN24CB0139 · ₱141,493,203.12 · mapped
- CONSTRUCTION OF DRAINAGE ALONG BACOOR DIVERSION ROAD, CAVITE24D00309 · ₱112,330,502.83 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG (KAKULISAN), BOCAUE, BULACAN24CC0151 · ₱98,999,736.58 · mapped
- BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. MASALIPIT, SAN MIGUEL, BULACAN (PHASE 1)24C00514 · ₱98,999,702.90 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PRITIL (PHASE II), GUIGUINTO, BULACAN24CC0056 · ₱98,999,571.90 · mapped
- BASIC INFRASTRUCTURE PROGRAM-BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR (LEFT SIDE), BRGY. TARTARO, SAN MIGUEL, BULACAN24C00511 · ₱98,999,511.39 · mapped
- BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER-PINAMBARAN SECTION(RIGHT DIKE), BRGY. PINAMBARAN, SAN MIGUEL, BULACAN24C00520 · ₱98,999,242.49 · mapped
- BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. MASALIPIT, SAN MIGUEL, BULACAN (PHASE 2)24C00515 · ₱98,999,227.45 · mapped
- BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. TARTARO, SAN MIGUEL, BULACAN (PHASE 4)24C00523 · ₱98,999,222.42 · mapped
- BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, PINAMBARAN SECTION, BRGY. PINAMBARAN, SAN MIGUEL, BULACAN24C00519 · ₱98,999,170.54 · mapped
- BASIC INFRASTRUCTURE PROJECTS-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER, BRGY. MASALIPIT, SAN MIGUEL, BULACAN24C00531 · ₱98,999,027.23 · mapped
- BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN (PHASE 3)24C00522 · ₱98,998,907.55 · mapped
- BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN(PHASE 5)24C00513 · ₱98,998,665.62 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BARANGAY IGULOT, BOCAUE, BULACAN24CC0289 · ₱98,998,221.99 · mapped
- BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER, BRGY. TARTARO, SAN MIGUEL, BULACAN24C00525 · ₱98,998,201.29 · mapped
- CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BARANGAY BAGBAGUIN, PANDI, BULACAN24CC0267 · ₱98,996,326.07 · mapped
- CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. MANATAL, PANDI, BULACAN24CC0268 · ₱98,994,837.37 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. MANATAL (PUROK 2-3), PANDI, BULACAN24CC0454 · ₱98,992,075.75 · mapped
- CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF SLOPE REVET. STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CONTROL BALAONG - MASALIPI25CP0152 · ₱97,564,233.63 · mapped
- CONVERG. AND SPECIAL SUPPORT PROG.-BASIC-INFRA. PROG.-BIP-FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF SLOPE REVETMENT STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CTRL., BALAONG-MASALIPIT BR. SECTION25CP0150 · ₱97,532,034.33 · mapped
- CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF SLOPE REVET. STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CONTROL BALAONG - MASALIPI25CP0153 · ₱97,523,590.46 · mapped
- BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN (PHASE 2)24C00524 · ₱97,519,697.55 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG CANUMAY CREEK (PHASE 3) BARANGAY CANUMAY WEST, VALENZUELA CITY25OD0132 · ₱97,214,408.51 · mapped
- CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2)25CB0098 · ₱96,920,992.71 · mapped
- CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3)25CB0099 · ₱96,920,992.71 · mapped
- CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 1)25CB0097 · ₱96,920,992.19 · mapped
- CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6)25CB0095 · ₱96,920,991.75 · mapped
- CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN25CB0093 · ₱96,920,991.58 · mapped
- CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5)25CB0094 · ₱96,920,653.55 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - MAHARLIKA HIGHWAY SOLAR LED LIGHT INSTALLATION, SAN MIGUEL, BULACAN (SEGMENT A), SAN MIGUEL, BULACAN25CP0255 · ₱96,597,775.96
- Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 2, Taguig City22OB0100 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structures along Bocaue River, Bocaue, Bulacan21CC0292 · ₱96,499,940.40 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (TRIBUTARY), PACKAGE D), PUROK 5, BARANGAY BULIHAN, PLARIDEL, BULACAN24CC0598 · ₱96,499,933.36 · mapped
- CONSTRUCTION OF ROAD, SAARAY ROAD TO GALALAN ROAD, BRGY. SARAY, PAKIL, LAGUNA22DH0066 · ₱96,499,856.35 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN24CC0599 · ₱96,499,773.79 · mapped
- Construction of Riverbank Protection Structure along Angat River, Barangay Lumang Bayan, Plaridel, Bulacan24CC0079 · ₱96,499,699.70 · mapped
- Construction of Riverbank Protection Structure at Barangay Pritil, Guiguinto, Bulacan24CC0053 · ₱96,499,556.14 · mapped
- Construction of Riverbank Protection Structure at Barangay Bunsuran, Pandi, Bulacan24CC0047 · ₱96,499,509.10 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, PACKAGE B, PUROK 4, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN24CC0597 · ₱96,499,456.25 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY SAN JOSE, PLARIDEL, BULACAN24CC0600 · ₱96,499,335.50 · mapped
- FLOOD MANAGEMENT PROGRAM - COSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUTURE ALONG MADLUM RIVER (PHASE 4), BARANGAY MASALIPIT, SAN MIGUEL BULACAN24C00475 · ₱96,499,304.06 · mapped
- Construction of Riverbank Protection Structure at Barangay Bunsuran (Phase II), Pandi, Bulacan24CC0048 · ₱96,499,112.67 · mapped
- Construction of Riverbank Protection Structure at Barangay Tilapayong, Baliuag, Bulacan24CC0035 · ₱96,498,805.78 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCT. ALONG, MADLUM RIVER(PHASE 1),BACK OF BIAK-NA-BATO- ELEM. SCHOOL SECTION, SAN MIGUEL, BULACAN24C00677 · ₱95,069,576.57 · mapped
- CONSTRUCTION OF REVETMENT, PACKAGE A, BARANGAY BAGBAGUIN, PANDI, BULACAN25CC0106 · ₱95,060,368.35 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG THE BANKS OF PH10 CREEK, BARANGAY 176, CALOOCAN CITY24OD0306 · ₱94,758,145.10 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 192 awards · ₱9,064,879,881.52
- City of San Pedro Infrastructure: 19 awards · ₱251,225,746.05
- City of Malolos Infrastructure: 3 awards · ₱28,602,747.40
- 25CP0256₱95,148,475.55· 2025-12-08· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- 25CC0313 - Construction of Reinforced Concrete Riv₱71,285,954.12· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0412 - Construction of Reinforced Concrete Riv₱47,451,236.61· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0458 - Construction of Multi-Purpose Building₱14,678,866.80· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0333-Construction of Road at Barangay Sto. Nin₱19,304,316.93· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0310 - Construction of Reinforced Concrete Riv₱71,279,544.33· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- Contract ID No. 25OB0342 - Construction of Multi₱19,393,374.53· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 25CC0467 - Construction of Multi-Purpose Building,₱14,478,666.21· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CP0153₱97,523,590.46· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- 25OD0132₱97,214,408.51· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 25CP0152₱97,564,233.63· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- 25CP0150₱97,532,034.33· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- Contract ID No. 25OB0346 - Construction of Multi₱38,748,468.90· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Contract ID No. 25OB0352 - Construction of Multi₱58,176,986.12· 2025-03-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 24CB0138₱94,334,695.65· 2025-02-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATAAN 2ND DEO
- 24CC0665-Construction of Flood Control Structure a₱46,459,863.05· 2025-02-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CB0139₱141,493,203.12· 2025-02-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATAAN 2ND DEO
- 25CC0132 - Construction of Riverbank Protection St₱69,479,843.70· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0087-Construction of Riverbank Protection Stru₱74,113,302.99· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0155 - Construction of Riverbank Protection St₱69,479,857.18· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0090-Construction of Riverbank Protection Stru₱74,120,218.65· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0088-Construction of Riverbank Protection Stru₱74,111,884.50· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0178 - Construction of Riverbank Protection St₱74,150,527.46· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0078-Construction of Riverbank Protection Stru₱74,112,782.52· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0089-Construction of Riverbank Protection Stru₱74,111,046.36· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →