Flood Control and Drainage24CB0139

CONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAAN

CONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAAN is a DPWH-tracked public work in Bataan 2nd DEO, Region III. Reported contract value: ₱141,493,203.12. Status: Past target date (DPWH On-Going). Contractor on record: TOPNOTCH CATALYST BUILDERS INC. Figures trace to dpwh.

Bataan 2nd DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Talisay River ( 8 + 177 - 8 + 475 ) , Pilar, Bataan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Bataan 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

241 projects · ₱13.6B total · 65 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 3, BRGY. SAN LUIS, NAUJAN, OR. MINDOR

Region IV-B, Region IV-B

2024₱186.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT FILINVEST, BARANGAY BAGONGSILANGAN, QUEZON CITY

Quezon City 1st DEO, National Capital Region

2024₱143.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK

Bulacan 3rd DEO, Region III

2025₱142.5M
Past target date (DPWH On-Going)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONSTRUCTION OF ROAD, PHASE I, SITIO DUPLAS, BARANGA

Bulacan 3rd DEO, Region III

2025₱142.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF DRAINAGE ALONG BACOOR DIVERSION ROAD, CAVITE

Region IV-A, Region IV-A

2024₱112.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG (KAKULISAN), BOCAUE, BULACAN

Bulacan 1st DEO, Region III

2024₱99.0M
Past target date (DPWH On-Going)
View all 241 projects →

4. Implementation

Contract Amount

₱141,493,203.12

Progress

Past target date (DPWH On-Going)

Start Date

February 26, 2025

Target End

January 10, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.