Roads24D00309

CONSTRUCTION OF DRAINAGE ALONG BACOOR DIVERSION ROAD, CAVITE

CONSTRUCTION OF DRAINAGE ALONG BACOOR DIVERSION ROAD, CAVITE is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱112,330,502.83. Status: Past target date (DPWH On-Going). Contractor on record: TOPNOTCH CATALYST BUILDERS INC. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

241 projects · ₱13.6B total · 65 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 3, BRGY. SAN LUIS, NAUJAN, OR. MINDOR

Region IV-B, Region IV-B

2024₱186.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT FILINVEST, BARANGAY BAGONGSILANGAN, QUEZON CITY

Quezon City 1st DEO, National Capital Region

2024₱143.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK

Bulacan 3rd DEO, Region III

2025₱142.5M
Past target date (DPWH On-Going)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONSTRUCTION OF ROAD, PHASE I, SITIO DUPLAS, BARANGA

Bulacan 3rd DEO, Region III

2025₱142.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAAN

Bataan 2nd DEO, Region III

2024₱141.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG (KAKULISAN), BOCAUE, BULACAN

Bulacan 1st DEO, Region III

2024₱99.0M
Past target date (DPWH On-Going)
View all 241 projects →

4. Implementation

Contract Amount

₱112,330,502.83

Progress

Past target date (DPWH On-Going)

Start Date

April 14, 2025

Target End

January 8, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.