| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYAN | Flood Control Management Cluster | ₱1.10B | Reported complete | RAYMAN BUILDERS INC | 189 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYAN | Flood Control Management Cluster | ₱1.04B | Reported complete | R-II BUILDERS INC | 188 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Flood Control Management Cluster | ₱945.5M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 172 | Check in |
| CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Flood Control Management Cluster | ₱942.7M | 12% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 157 | Check in |
| AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Flood Control Management Cluster | ₱941.2M | 69% reported progress | L R TIQUI BUILDERS INC | 50 | Check in |
| CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Flood Control Management Cluster | ₱934.0M | 99% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 192 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱931.7M | Reported complete | RAYMAN BUILDERS INC | 167 | Check in |
| RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱907.5M | Reported complete | RAYMAN BUILDERS INC | 162 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 132 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 134 | Check in |
| CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Flood Control Management Cluster | ₱853.1M | Reported complete | RAYMAN BUILDERS INC | 79 | Check in |
| REHABILITATION OF NAPINDAN HYDRAULIC CONTROL STRUCTURES THROUGH DESIGN AND BUILD SCHEME, BRGY. BUTING, PASIG CITY | Flood Control Management Cluster | ₱849.1M | Reported complete | A M ORETA & CO INC 108 | 163 | Check in |
| FLOOD CONTROL WORKS-ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱761.0M | Reported complete | R U AQUINO CONST AND DEVELOPMENT CORP FO | 128 | Check in |
| DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | ₱744.4M | 87% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 175 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱715.1M | 94% reported progress | MSB VITUG CONST | 106 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 2 AND 3 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER UPSTREAM OF MARIKINA BRIDGE) STA. 14+100 TO STA. 15+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | ₱714.7M | 91% reported progress | MSB VITUG CONST | 154 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY | Flood Control Management Cluster | ₱689.3M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 151 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱669.3M | Reported complete | E M CUERPO INC | 133 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Flood Control Management Cluster | ₱652.3M | 99% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 150 | Check in |
| ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST FLOODS: IMPROVEMENT OF WATERWAYS/RETARDING PONDS OF PUMPING STATIONS AT WEST OF MANGGAHAN FLOODWAY, C-6 ROAD, WEST MANGGAHAN RD., TAGUIG CITY, METRO MANILA | National Capital Region | ₱596.9M | Reported complete | PREMIUM MEGASTRUCTURES INC | 165 | Check in |
| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱533.8M | 94% reported progress | TOKWING CONST CORP FOR TOKWING CONSTRUC | 123 | Check in |
| ORGANIZATIONAL OUTCOME 2 PROTECT LIVES AND PROPERTIES AGAINST FLOOD: CONSTRUCTION OF MAYTUNAS PUMPING STATION AND IMPROVEMENT OF MAYTUNAS CREEK AND ITS VICINITY, MANDALUYONG CITY | National Capital Region | ₱519.4M | 19% reported progress | PREMIUM MEGASTRUCTURES INC | 165 | Check in |
| PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS) | National Capital Region | ₱502.3M | 95% reported progress | MSB VITUG CONST | 166 | Check in |
| CONSTRUCTION OF FLOOD CONTROL PROTECTION DIKE ALONG MUZON RIVER, MALABON, NAVOTAS-OBANDO SECTION, MALABON CITY | National Capital Region | ₱481.7M | Reported complete | FLORDES CONST & TRADING CORP FORMERLY FLO | 156 | Check in |
| FLOOD CONTROL WORKS-PAMPANGA DELTA DEVELOPMENT PROJECT-PHASE II, CALUMPIT, BULACAN, PROVINCE OF BULACAN | Flood Control Management Cluster | ₱472.7M | 93% reported progress | RAYMAN BUILDERS INC | 142 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE | Flood Control Management Cluster | ₱445.3M | Reported complete | MSB VITUG CONST | 176 | Check in |
| LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BATANGAS ACCESS ZONE - WEST SIDE, BATANGAS CITY, SAN PASCUAL AND BAUAN, BATANGAS | Region IV-A | ₱442.9M | Reported complete | TCSC CORP | 234 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR | Flood Control Management Cluster | ₱438.8M | Reported complete | MSB VITUG CONST | 175 | Check in |
| FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES | Flood Control Management Cluster | ₱420.4M | Reported complete | HORAMABI BUILDERS | 153 | Check in |
| UPGRADING OF CATMON PUMPING STATION, MALABON CITY | Flood Control Management Cluster | ₱416.4M | Reported complete | E F CHUA CONST INC | 158 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYAN | Flood Control Management Cluster | ₱415.9M | 90% reported progress | J D LEGASPI CONST | 159 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 9 - CONSTRUCTION OF MALANDAY PUMPING STATION AND ASSOCIATED WORKS, MARIKINA CITY | Flood Control Management Cluster | ₱399.5M | 95% reported progress | J D LEGASPI CONST | 152 | Check in |
| METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Flood Control Management Cluster | ₱390.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 161 | Check in |
| UPGRADING OF TAPAYAN PUMPING STATION, TAGUIG CITY | Flood Control Management Cluster | ₱389.3M | Reported complete | A M ORETA & CO INC 108 | 161 | Check in |
| FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALES | Zambales 2nd DEO | ₱386.0M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 165 | Check in |
| UPGRADING OF SPINE PUMPING STATION, NAVOTAS CITY | Flood Control Management Cluster | ₱385.0M | Reported complete | A M ORETA & CO INC 108 | 160 | Check in |
| UPGRADING/REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND REPAIR OF NAVOTAS NAVIGATIONAL GATE (PHASE I) | Flood Control Management Cluster | ₱382.4M | Reported complete | E F CHUA CONST INC | 158 | Check in |
| FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Flood Control Management Cluster | ₱376.8M | 72% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 140 | Check in |
| CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2) | National Capital Region | ₱376.8M | 1% reported progress | E F CHUA CONST INC | 164 | Check in |
| CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Flood Control Management Cluster | ₱366.6M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 177 | Check in |
| AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R | Flood Control Management Cluster | ₱363.2M | Reported complete | MSB VITUG CONST | 71 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | ₱354.4M | 0% reported progress | FERDSTAR BUILDERS INC | 152 | Check in |
| REVETMENT WORKS ALONG MARULAS TUNGTONG CREEK DIVERSION CHANNEL, LAS PIÑAS CITY | Flood Control Management Cluster | ₱351.8M | Reported complete | E F CHUA CONST INC | 175 | Check in |
| CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN II (YLANG-YLANG RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO CHICO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Flood Control Management Cluster | ₱350.2M | 96% reported progress | MSB VITUG CONST | 187 | Check in |
| CONSTRUCTION OF FLOODGATES NUMBER 3 AND NUMBER 4 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY | Flood Control Management Cluster | ₱328.1M | 81% reported progress | PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP | 204 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14B, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | L N R CONST | 219 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 219 | Check in |
| CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGA | Flood Control Management Cluster | ₱309.6M | Reported complete | NORTHERN BUILDERS | 140 | Check in |
| CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 2), ANGELES-PORAC, PAMPANGA | Flood Control Management Cluster | ₱298.5M | Reported complete | NORTHERN BUILDERS | 139 | Check in |
| Construction of Camiling-Agno River Floodway, Tarlac, Phase 3 | CAMILING (TARLAC), TARLAC | ₱289.5M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 86 | Check in |
| Construction of Camiling-Agno River Floodway, Tarlac, Phase 4 | CAMILING (TARLAC), TARLAC | ₱289.5M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 87 | Check in |
| Construction of Casalogan River Control, Casiguran, Aurora | CASIGURAN (AURORA), AURORA | ₱289.5M | Reported complete | DALCON CONST / EGB CONST CORP FORMERLY: EGB CONST | 59 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG ZAPOTE RIVER AND ITS TRIBUTARIES (UPSTREAM), LAS PINAS CITY | Las Piñas-Muntinlupa DEO | ₱289.5M | Reported complete | E F CHUA CONST INC | 182 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-PASIG-POTRERO RIVER (BACOLOR SECTION), PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT), PROVINCE OF PAMPANGA | Region III | ₱289.5M | Reported complete | A D GONZALES JR CONST | 140 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/ | Region V | ₱288.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 114 | Check in |
| REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Flood Control Management Cluster | ₱285.9M | Reported complete | R U AQUINO CONST AND DEVELOPMENT CORP FO | 139 | Check in |
| RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITY | Flood Control Management Cluster | ₱284.5M | 99% reported progress | E M CUERPO INC | 156 | Check in |
| FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJA | Flood Control Management Cluster | ₱284.2M | Reported complete | NORTHERN BUILDERS | 117 | Check in |
| CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1) | South Manila DEO | ₱283.3M | 8% reported progress | E F CHUA CONST INC | 165 | Check in |
| CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | ₱281.5M | Reported complete | PHILWORKS CONST | 115 | Check in |
| REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND NAVOTAS NAVIGATION GATE (PHASE 3), NAVOTAS CITY (RE-ADVERTISEMENT) | National Capital Region | ₱281.2M | 65% reported progress | ANORE CONST | 158 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 2, BACOOR, CAVITE | Region IV-A | ₱280.7M | 11% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 181 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 1, BACOOR, CAVITE | Region IV-A | ₱280.7M | 14% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 181 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BR | Region V | ₱280.3M | Reported complete | PHILWORKS CONST | 113 | Check in |
| REVETMENT AND DREDGING WORKS ALONG STA. 14+038 TO STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITY | Flood Control Management Cluster | ₱280.0M | Reported complete | MSB VITUG CONST | 152 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 115 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | G C I CONST AND DEV'T CORP | 115 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 115 | Check in |
| PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II | Flood Control Management Cluster | ₱279.6M | Reported complete | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 163 | Check in |
| PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE I | Flood Control Management Cluster | ₱271.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 163 | Check in |
| Flood Control Works-Abacan River Diking and Slope Protection Works, Mexico, Pampanga | ARAYAT (PAMPANGA), PAMPANGA | ₱270.2M | Reported complete | A D GONZALES JR CONST & TRADING CO INC | 126 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 4+780.00 - STATION 5+480, SECTION 5 PHASE 11, BRGY. STA. CRUZ, TANAUAN, LEYTE | Region VIII | ₱265.3M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 229 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 1+900 - STATION 2+550, SECTION 5 PHASE 9, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱263.4M | Reported complete | WTG CONST | 228 | Check in |
| REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Flood Control Management Cluster | ₱260.3M | Reported complete | STO CRISTO CONST & TRADING INC FOR: STO CRISTO CONST & TRADING | 123 | Check in |
| CONSTRUCTION OF DRAINAGE SYSTEM/OUTFALL EXTENSION AT MANILA BAY | National Capital Region | ₱258.6M | 77% reported progress | PREMIUM MEGASTRUCTURES INC | 166 | Check in |
| Flood Control Works - Pasig-Potrero River and San Fernando - Sto. Tomas - Minalin Taildike (San Fernando and Bacolor Section) Pampanga | CITY OF SAN FERNANDO (CAPITAL) (LA UNION), LA UNION | ₱257.3M | Reported complete | A D GONZALES JR CONST & TRADING CO INC | 139 | Check in |
| UPPER MARIKINA RIVER IMPV'T./REVETMENT WALL,MARIKINA CITY 1ST LD (CONTRACT PACKAGE 3) RIVER IMPV'T. | Flood Control Management Cluster | ₱256.8M | Reported complete | E M CUERPO INC | 153 | Check in |
| CONSTRUCTION OF TWO (2) PUMPING STATION ALONG NAVOTAS COASTAL DIKE (PHASE 6), NAVOTAS CITY | Flood Control Management Cluster | ₱250.9M | Reported complete | MSB VITUG CONST | 159 | Check in |
| CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Flood Control Management Cluster | ₱247.1M | 40% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 158 | Check in |
| Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, Cavite | CAVITE | ₱244.1M | Reported complete | E F CHUA CONST INC | 183 | Check in |
| CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITE | Region IV-A | ₱241.4M | 90% reported progress | SILVERWOLVES CONST CORP | 189 | Check in |
| CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I) | Region IV-A | ₱241.4M | 92% reported progress | SILVERWOLVES CONST CORP | 189 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱241.2M | 90% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 106 | Check in |
| Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines Sur | BAAO (CAMARINES SUR), CAMARINES SUR | ₱241.2M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 105 | Check in |
| Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | SANTA CATALINA (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 65 | Check in |
| UPGRADING OF MAYPAJO PUMPING STATION, CALOOCAN CITY | Flood Control Management Cluster | ₱241.2M | Reported complete | E F CHUA CONST INC | 160 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | ₱241.2M | 87% reported progress | SARGASSO CONST | 216 | Check in |
| Construction of Flood Control Structure along Libtangin River, Barangay Mangiliol Section, Gasan, Marinduque | GASAN (MARINDUQUE), MARINDUQUE | ₱241.2M | Reported complete | HGG BUILDERS & SUPPLY | 215 | Check in |
| Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos Sur | TAGUDIN (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 17 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUE | Region IV-B | ₱241.2M | 74% reported progress | HGG BUILDERS | 199 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAAN | Region III | ₱241.2M | 98% reported progress | JASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S | 180 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MOCONG, BASUD, CAMARINES NORTE, BASUD, C | Region V | ₱240.1M | 93% reported progress | BRENTMIN ROOFING ENT | 75 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BASUD RIVER, BARANGAY MAMPILI, BASUD, CAMARINES N | Region V | ₱240.1M | 93% reported progress | BRENTMIN ROOFING ENT | 74 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUE | Region IV-B | ₱239.9M | 63% reported progress | HGG BUILDERS | 186 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 2+550 - STATION 3+180, SECTION 5 PHASE 10, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱239.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 228 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION, BUENAVISTA, MARINDUQUE | Region IV-B | ₱238.9M | 87% reported progress | SARGASSO CONST | 216 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGE | Region V | ₱238.7M | 90% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 76 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGA | Region V | ₱237.4M | 92% reported progress | HGG BUILDERS & SUPPLY | 70 | Check in |
| FLOOD CONTROL WORKS - REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED PAMPANGA RIVER BANK INCLUDING CANDABA CUT-OFF CHANNEL, PAMPANGA AND NUEVA ECIJA | Flood Control Management Cluster | ₱237.1M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 133 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGE | Region V | ₱236.4M | Reported complete | E GARCIA CONST CORP FOR E GARCIA CONST | 78 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | ₱236.2M | 20% reported progress | EZJONES CONST INC | 227 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | ₱236.1M | 31% reported progress | EZJONES CONST INC | 215 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH FLOOD CONTROL DIKE, BARANGAY BATAN, | Region V | ₱235.9M | 77% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 93 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱235.7M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 105 | Check in |
| CONSTRUCTION OF TWO (2) FLOODGATES ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY(CONSTRUCTION OF FLOODGATE NO. 1 AND ELECTRICAL WORKS FOR FLOODGATES NO. 1 AND 2) | Flood Control Management Cluster | ₱235.5M | 0% reported progress | PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP | 159 | Check in |
| CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCT | Catanduanes DEO | ₱235.3M | 0% reported progress | G C I CONST AND DEV'T CORP | 43 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DAET RIVER, BARANGAY BIBIRAO, DAE | Region V | ₱235.2M | 95% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 76 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, DOWNSTREAM, PHASE 2, SAN JUAN, BATANGAS | Region IV-A | ₱235.2M | 0% reported progress | STRUKTURA TEKNIKA SERVICES CO | 202 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BA | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 79 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, BARANGAY CAHABAAN, | Region V | ₱234.0M | 80% reported progress | HGG BUILDERS & SUPPLY | 74 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAY | Region V | ₱234.0M | 84% reported progress | BRENTMIN ROOFING ENT | 76 | Check in |
| Construction of Pumping Station along Veinte Reales, Valenzuela City | CITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY | ₱234.0M | Reported complete | TOUGHBUILT CONST & TRADING INC / AKN CONST CORP | 152 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TALISAY RIVER, BARANGAY BINA | Region V | ₱234.0M | 96% reported progress | HGG BUILDERS & SUPPLY | 70 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMAR | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 74 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TORRIJOS SHORE PROTECTION STRUCTURE, BRGY. POBLACION, TORRIJOS, MARINDUQUE | Region IV-B | ₱232.8M | 89% reported progress | HGG BUILDERS | 200 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SEAWALL, BRGY. MORALES SECTION, STA. CRUZ, MARINDUQUE | Region IV-B | ₱232.8M | 70% reported progress | HGG BUILDERS | 185 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROAD/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SANTA CRUZ SEAWALL, BRGY. TAGUM-BGRY. MORALES SECTION, STA. CRUZ, MARINDUQUE | Region IV-B | ₱232.8M | 91% reported progress | HGG BUILDERS | 185 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION STRUCTURE, BRGY. TUNGIB-LIPATA, BUENAVISTA, MARINDUQUE | Region IV-B | ₱232.7M | 90% reported progress | HGG BUILDERS | 213 | Check in |
| CONSTRUCTION OF FLOODGATES NUMBER 5 AND NUMBER 6 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY | Flood Control Management Cluster | ₱231.6M | 82% reported progress | HALREY CONST INC | 204 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 212 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 212 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 212 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | ₱226.2M | Reported complete | EZJONES CONST INC | 230 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAYS TALON 1 TO TALON 3, LAS PINAS CITY | Las Piñas-Muntinlupa DEO | ₱218.3M | 25% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 177 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MALIS-POBLACION-ILANG-ILANG, GUIGUINTO, BULACAN | Bulacan 1st DEO | ₱217.1M | Reported complete | ST TIMOTHY CONST CORP | 148 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-LEFTSIDE), BOAC, MARINDUQUE | Region IV-B | ₱212.6M | 79% reported progress | MONOLITHIC CONST | 206 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY BALUD TO BARANGAY STA. ELENA, TANAUAN, LEYTE, LEYTE 1ST LD | Region VIII | ₱212.2M | 94% reported progress | EZJONES CONST INC | 232 | Check in |
| Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte | VINTAR (ILOCOS NORTE), ILOCOS NORTE | ₱211.3M | Reported complete | JOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST | 143 | Check in |
| CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITY | Metro Manila 3rd DEO | ₱210.6M | Reported complete | JASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S | 152 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱207.1M | 27% reported progress | EZJONES CONST INC | 230 | Check in |
| Construction of Flood Control River Wall (Road Dike) along Veinte Reales Creek (Right Side Bank), Brgy. Veinte Reales, Valenzuela City | CITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY | ₱199.7M | Reported complete | E M CUERPO INC / TOUGHBUILT CONST & TRADING INC | 152 | Check in |
| CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱198.7M | Reported complete | A D GONZALES JR CONST | 3 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | Reported complete | ALPHA | 117 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | 95% reported progress | KATHA BUILDERS & SUPPLIES INC | 117 | Check in |
| LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL STRUCTURE, CONSTRUCTION OF REVETMENT - CONSTRUCTION OF A REVETMENT AT MASUKOL, PAOMBONG, BULACAN | Region III | ₱198.0M | Reported complete | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 156 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VI | Region V | ₱198.0M | Reported complete | PARTIDO CONST | 75 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), TACLOBAN CITY, LEYTE | Region VIII | ₱197.5M | 86% reported progress | EZJONES CONST INC | 215 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | ₱195.6M | 40% reported progress | EZJONES CONST INC | 235 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MARIBLO CREEK, STA. 0+010.000 TO STA. 0+524.458 (LEFT AND RIGHT RIVER BANK), QUEZON CITY | Flood Control Management Cluster | ₱195.0M | Reported complete | TRIPLE 8 CONST | 158 | Check in |
| Flood Control Works - Construction of Guagua Pasac River | GUAGUA (PAMPANGA), PAMPANGA | ₱193.0M | Reported complete | NORTHERN BUILDERS | 150 | Check in |
| Construction of Camiling-Agno River Floodway Phase 5 | CAMILING (TARLAC), TARLAC | ₱193.0M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 88 | Check in |
| CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | ₱193.0M | 90% reported progress | BALINTUGAN CONST | 68 | Check in |
| LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, CONSTRUCTION/REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MSR OLD ZIGZAG RD, QUEZON | Quezon 4th DEO | ₱193.0M | Reported complete | KATHA BUILDERS & SUPPLIES INC | 159 | Check in |
| Improvement of Sto. Tomas River (Sta. Fe Section) San Marcelino, Zambales Phase 2 | SAN MARCELINO (ZAMBALES), ZAMBALES | ₱193.0M | Reported complete | REPOLMAN CONST CORP FORMERLY: REPOLMAN CONST / THREE W BUILDERS INC | 165 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION/DIKE IMPROVEMENT ALONG RIVER AT BRGY. PUNGO, CALUMPIT, BULACAN | Region III | ₱193.0M | Reported complete | RAYMAN BUILDERS INC | 143 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | ₱193.0M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST | 12 | Check in |
| Construction of Abitonan Flood Control Structure, Dipaculao, Aurora | DIPACULAO (AURORA), AURORA | ₱193.0M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP | 11 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO TOMAS RIVER, SAN FELIPE, ZAMBALES | Region III | ₱193.0M | 98% reported progress | GLOBALCRETE BUILDERS INC | 173 | Check in |
| Construction of Flood Mitigation Structure along Sinucalan River, Barangay Camantiles, Urdaneta, Pangasinan | CITY OF URDANETA (PANGASINAN), PANGASINAN | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 56 | Check in |
| Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱193.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 126 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, C | Region V | ₱193.0M | 96% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 36 | Check in |
| Construction of Bulos Flood Control Structure, Dipaculao, Aurora | DIPACULAO (AURORA), AURORA | ₱193.0M | Reported complete | R D TALENS CONST AND TRADING | 20 | Check in |
| CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURES ALONG TELABASTAGAN-SAINT JUDE CREEK, SAN FDO. CITY | Region III | ₱193.0M | 90% reported progress | R D POLICARPIO | 134 | Check in |
| Construction of Aguang Flood Control Structure, Baler, Aurora | BALER (CAPITAL) (AURORA), AURORA | ₱193.0M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP | 18 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC, | Region V | ₱193.0M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 48 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION/IMPROVEMENT OF SEAWALL POBLACION-GOGON, RAPU-RAPU, ALBAY (PHASE 2), RAPU-RAP | Region V | ₱193.0M | 95% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 93 | Check in |
| Construction of San Isidro River Control (Downstream) Package 1, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 108 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 2, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | ₱193.0M | 98% reported progress | SILVERWOLVES CONST CORP | 90 | Check in |
| Construction of San Isidro River Control (Downstream) Package 2, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 108 | Check in |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package A) | INFANTA (QUEZON), QUEZON | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 107 | Check in |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package B) | INFANTA (QUEZON), QUEZON | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 107 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I) | Region IV-A | ₱193.0M | 85% reported progress | SILVERWOLVES CONST CORP | 106 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. STA. ANA, TAGUIG CITY | National Capital Region | ₱193.0M | Reported complete | A D GONZALES JR CONST | 165 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. TUKTUKAN, TAGUIG CITY | National Capital Region | ₱193.0M | Reported complete | ALPHA | 165 | Check in |
| BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LD | Region V | ₱193.0M | Reported complete | WCS CONST INC | 116 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. USUSAN, TAGUIG CITY | National Capital Region | ₱193.0M | Reported complete | PASCAL CONST | 165 | Check in |
| Construction of Flood Control and Bank Protection StructuresLukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2 | MONTALBAN (RIZAL), RIZAL | ₱193.0M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 137 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱193.0M | Reported complete | R U AQUINO CONST AND DEVELOPMENT CORP FO | 130 | Check in |
| REHABILITATION OF PARANAQUE RIVER MOUTH (PHASE I AND PHASE II), BARANGAY DON GALO, PARANAQUE CITY | National Capital Region | ₱193.0M | 99% reported progress | AKN CONST CORP | 173 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF ERODED PAMPANGA RIVER BANK (SAN JOSE, SAN SIMON AND SUCAD, APALIT SECTION) PROVINCE OF PAMPANGA | Region III | ₱193.0M | Reported complete | E M CUERPO INC | 138 | Check in |
| Construction of Road Dike along Hitoma River, Phase I, Barangay Obi, Caramoran, Catanduanes | CARAMORAN (CATANDUANES), CATANDUANES | ₱193.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 36 | Check in |
| Construction of Flood Control Structure, Ligao City, Albay Phase II | CITY OF LIGAO (ALBAY), ALBAY | ₱192.9M | Reported complete | SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL / SISBRO CONST CORP FORMERLY: SISBRO CONST & SUPPLY | 114 | Check in |
| OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOL | Region V | ₱192.9M | 96% reported progress | MAKAPA CORP | 118 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.9M | 0% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 158 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY STA. ELENA (UPSTREAM), TANAUAN, LEYTE | Region VIII | ₱192.9M | 89% reported progress | EZJONES CONST INC | 234 | Check in |
| IMPROVEMENT OF BULI CREEK PUMPING STATION ALONG MANGAHAN FLOODWAY, PASIG CITY | Flood Control Management Cluster | ₱192.8M | Reported complete | L R TIQUI BUILDERS INC | 182 | Check in |
| CONSTRUCTION OF RIVERWALL ALONG DAMPALIT RIVER, BRGY. HULONG DUHAT AND BRGY. DAMPALIT, MALABON CITY | Flood Control Management Cluster | ₱192.8M | Reported complete | A L SALAZAR CONST INC | 158 | Check in |
| Construction of Flood Control Structure at Binagasbasan, Barangay Paraiso, San Miguel, Catanduanes | SAN MIGUEL (CATANDUANES), CATANDUANES | ₱192.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 30 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA LAKESHORE AT BGRY. SAN, ANTONIO, MUNICIPALITY OF BAY, LAGUNA | Flood Control Management Cluster | ₱192.8M | Reported complete | 11-16 CONST | 180 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN RIVER, BARANGAY CALINGATNAN - SITIO MINAELI, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.7M | 76% reported progress | HGG BUILDERS & SUPPLY | 160 | Check in |
| Construction of Quinale "A" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, Albay | POLANGUI (ALBAY), ALBAY | ₱192.7M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 115 | Check in |
| CONSTRUCTION OF LAYAC DIVERSION CHANNEL, BATAAN, HERMOSA AND DINALUPIHAN, BATAAN | Flood Control Management Cluster | ₱192.7M | Reported complete | NORTHERN BUILDERS | 164 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINONGTOAN SECTION, TANAUAN, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, GUINGAUAN SECTION, TANAUAN, LEYTE | Region VIII | ₱192.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 237 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | ₱192.4M | 85% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 184 | Check in |
| CONSTRUCTION OF FLOOD CONTROL AND SLOPE PROTECTION STRUCTURES ALONG LUKUTANG MALAKI RIVER, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL PACKAGE 3 | Region IV-A | ₱192.2M | 69% reported progress | PREMIUM MEGASTRUCTURES INC | 136 | Check in |
| Construction of Pantao Storm Surge Protection along Poblacion, Libon, Albay | ALBAY | ₱192.1M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 132 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF PAJO BAGUIO FLOOD CONTROL STRUCTURE,PAJO BAGUIO, VIRAC, CATANDUANES, VIRAC, C | Region V | ₱192.1M | 94% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 53 | Check in |
| UPGRADING OF SANTIBAÑEZ PUMPING STATION, PACO, MANILA | Flood Control Management Cluster | ₱192.0M | Reported complete | J D LEGASPI CONST | 164 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | ₱191.9M | 84% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 139 | Check in |
| FLOOD CONTROL PROJECT BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SORROUNDING AREAS, ZAPOTE RIVE | Las Piñas-Muntinlupa DEO | ₱191.4M | Reported complete | J D LEGASPI CONST | 177 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (UPSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 47% reported progress | LEDA CONST INC | 228 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (DOWNSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 55% reported progress | LEDA CONST INC | 228 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RO | Region II | ₱191.0M | 88% reported progress | R S K M CONST SERVICES | 113 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR | Region VIII | ₱190.9M | 67% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 123 | Check in |
| Construction of Flood Control, Brgy. Belen, Leyte, Leyte | LEYTE (LEYTE), LEYTE | ₱190.9M | Reported complete | EZJONES CONST INC / JGO BUILDERS | 238 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAG | Region II | ₱190.8M | 93% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 130 | Check in |
| INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT WAWANG PULO PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE, BARANGAY WAWANG PULO, VALENZUELA CITY | Metro Manila 3rd DEO | ₱190.5M | 49% reported progress | J SIMEON CONST | 153 | Check in |
| INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT COLOONG PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE AT BARANGAY COLOONG, VALENZUELA CITY | Metro Manila 3rd DEO | ₱190.5M | 29% reported progress | MRB11 CONST CORP FORMERLY:MRB CONS | 152 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | Quezon City 1st DEO | ₱190.4M | 97% reported progress | A L SALAZAR CONST INC | 148 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 1), RODRIGUEZ, RIZAL | Flood Control Management Cluster | ₱190.3M | 98% reported progress | 11-16 CONST | 142 | Check in |