Construction of Flood Mitigation Structure23D00199

Construction of Flood Control and Bank Protection StructuresLukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2

Construction of Flood Control and Bank Protection StructuresLukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2 is a DPWH-tracked public work in MONTALBAN (RIZAL), RIZAL, Region IV-A. Reported contract value: ₱192,977,502.40. Status: Reported complete (DPWH). Contractor on record: ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST. Figures trace to sumbong.

MONTALBAN (RIZAL), RIZAL, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Upper Marikina, Barangay San Isidro, Rodriguez, Rizal
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Rizal 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

103 projects · ₱10.5B total · 4 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF THE NBI MAIN BUILDING (PHASE I)

National Capital Region, National Capital Region

2023₱447.7M
Past target date (DPWH On-Going)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURES AL;ONG PUERTO PRINCESA SDOUTH ROAD, K0147+398-K0180+313 (WITH EXCEPTIONS), PALAWAN

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURE ALONG PUERTO PRINCESA SOUTH ROAD- K0180+313-K0203+730 (INTERMITTENT SECTIONS), PALAWAN

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PRIMARY ROADS, DAANG MAHARLIKA (LZ), NUEVA ECIJA 2ND LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA

Region III, Region III

2017₱289.5M
Reported complete (DPWH)
No sat.

CLUSTER 1: 1. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PALO - PASTRANA - STA. FE BY-PASS RD, PACKAGE A 2. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATION

Region VIII, Region VIII

2025₱289.4M
Ongoing (DPWH-reported)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 2

Region II, Region II

2023₱285.9M
Past target date (DPWH On-Going)
View all 103 projects →

4. Implementation

Contract Amount

₱192,977,502.40

Progress

Reported complete (DPWH)

Start Date

August 10, 2023

Target End

June 4, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.