DPWH projects in Rizal

2,553 DPWH public works projects are recorded in Rizal (Region Iv-A), with start dates from 2016 to 2025. Recorded contract values total about ₱49,816,073,390.24. 2,082 are recorded at 100% progress and 671 are flood control works. Figures are as recorded by DPWH; they are not findings.

Largest recorded projects

  1. Construction of Flood Control and Bank Protection Structureslukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2₱192,977,502.40
  2. Construction of Flood Control Structure Along Upper Marikina River (Phase Viii), San Mateo, Rizal₱144,750,000.00
  3. Construction of Flood Control Structure Along Upper Marikina River (Phase Ix), San Mateo, Rizal₱144,750,000.00
  4. Construction of Flood Control Structure Along Nangka River, Barangay Silangan, San Mateo, Rizal₱144,394,880.00
  5. Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers - Construction of River Capacity Enhancem₱138,526,398.52
  6. Construction of Flood Control Mitigation Structure Along Ampid River, Phase 1, San Mateo, Rizal₱125,449,994.80
  7. Construction of Reinforced Concrete (Box Culvert Drainage) (Phase 1), Kambal Road Guitnangbayan Ii, San Mateo, Rizal₱125,449,561.50
  8. Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Network Development Program-Construction of By-Pass and Diversion Roads-Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Rizal₱124,413,132.58
  9. Flood Control and River Improvement Projects Along Laguna Lake Based On Metro Manila Master Plan-Construction of Slope Protection for Tanay River, Tanay Rizal₱114,892,101.75
  10. Construction of Flood Control Structure Along Bilibiran Creek, Binangonan, Rizal₱106,149,946.50
  11. Construction of Flood Mitigation Structure at East Manggahan River, Phase 2, Barangay San Juan, Taytay, Rizal₱106,149,488.00
  12. Construction of Flood Control Mitigation Structure Along Ampid River, Phase 2, San Mateo, Rizal₱106,146,063.90
  13. Construction of Flood Mitigation Structure at East Manggahan River, Brgy. San Juan, Taytay, Rizal₱102,289,850.00
  14. Access Roads and/Or Bridges From the National Road/S Leading to Major/Strategic Public Buildings/Facilities - Improvement of Road and Drainage System, Botong Francisco Avenue, Barangay San Isidro Angono, Rizal (First District)₱99,356,295.38
  15. Local Program - Local Infrastructure Program - National Roads and Bridges - National Roads - Rehabilitation/Improvement of Marikina-Infanta Road, K0049+000 to K0052+000 and K0055+400, Tanay, Rizal₱98,999,867.42
  16. Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Asphalt Overlay of Tanay-Sampaloc Rd - K0066+100 - K0068+000, K0069+000 - K0070+443, Tanay, Rizal₱98,000,000.00
  17. Convergence and Special Support Program (Cssp) - Special Road Fund -Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239 - Installation of Street Lights and Road Safety Devices Along San Mateo - Rodriguez Road - K0021+(-418) - K0025 + 818, San Mateo, Riza₱96,500,000.00
  18. Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Tertiary Roads-Tanay Sampaloc Rd K0057+(-685) - K0060+000₱96,500,000.00
  19. Local Program-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects-Local Roads and Bridges-Local Roads-Construction of Rizal-Bulacan Inter-Province Link Road, Rizal₱96,500,000.00
  20. Construction of Flood Control and River Bank Protection Structure Along Pililla River, Brgy. Hulo, Pililla, Rizal₱96,500,000.00
  21. Construction of Flood Control Structure Along Upper Marikina River (Phase Iv, R/S), Brgy. San Jose, Rodriguez, Rizal₱96,500,000.00
  22. Construction of Flood Control Structure Along Puray River, Brgy. San Jose and Brgy, San Isidro, Rodriguez, Rizal₱96,500,000.00
  23. Construction of River Capacity Enhancement Structure Along Teresa River, Sitio Abuyod, Barangay May-Iba, Teresa, Rizal₱96,500,000.00
  24. Convergence and Special Support Program - Basic Infrastructure Program (Bip) - Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities - Construction of River Capacity Enhancement Structure Along Upper Marikina River, Brgy. Sta.₱96,500,000.00
  25. Mfo2-Flood Management Services-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Slope Protection Works for Upper Montalban River, Brgy. San Jose, Rodriguez Rizal₱96,500,000.00