AARCON BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 386 linked DPWH project(s) totaling about ₱11,183,595,482.83. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
AARCON BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 386
- Total value
- ₱11,183,595,482.83
- Published flags
- 0
- Region
- Metro Manila 2nd DEO · National Capital Region
Online presence
aarconbuilders.comGoogle Maps business profile, 2026-10-22
Google Maps: Aarcon Builders★ 5 (1 reviews)Google Maps, 2026-10-22
18 Sct. Tuason St, Diliman, Quezon City, Metro Manila
Licensed officers (PCAB)
- Arnold A. Reyes · Authorized Managing Officer (PCAB license 28336) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for AARCON BUILDERS — not an accusation or finding of wrongdoing.
Score: 86.00 / 100 · Projects in sample: 386 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 74.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 74.3
- lateCompletedProjects
- 40
- onTimeCompletedProjects
- 292
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 376
- pastTargetOngoingProjects
- 44
- undatedCompletedProjectsExcluded
- 10
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 386
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 386
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 386
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 386
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 373 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- DREDGING OF GUAGUA-PASAC RIVER, SASMUAN, PAMPANGA18C00052 · ₱187,534,010.23 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - EPIFANIO DELOS SANTOS AVE (EDSA) - K0021 + (-158) - K0021 + 000, K0021 + (-229) - K0021 + (-158), K0021 + 000 - K0025 + 16324O00001 · ₱160,478,869.84 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA-CAVITE (NCR BDRY-JCT CAVITE CITY SECT) - K0015 + 985 - K0016 + 087, K0016 + 303 - K0016 + 651; MC DONALD JCT-AGUINALDO H-WAY - K0015 + 274 - K0015 + 690 AND MANILA-CAVITE (NCR BDRY-JCT CAVITE CITY SECT) - K25DQ0017 · ₱140,936,658.98 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADSKAWIT-NOVELETA DIV RD. - K0024 + 495 - K0025 + 43825DF0036 · ₱103,872,378.33 · mapped
- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BACOOR FLOOD CONTROL PROJECT INCL. A PUMPING STATION, (PACKAGE A), BACOOR CITY, CAVITE19D00016 · ₱102,964,513.30 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY OF TANAY-SAMPALOC RD - K0066+100 - K0068+000, K0069+000 - K0070+443, TANAY, RIZAL24DO0096 · ₱98,000,000.00 · mapped
- Construction of Flood Control Structures along Lemery-Taal Diversion Road, Lemery, Batangas23DB0091 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, QUEZON-BATANGAS RD - K0106 + 284 - K0107 + 48924DJ0185 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-TANAY SAMPALOC RD K0057+(-685) - K0060+00024DO0013 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG MANILA BAY, BARANGAY WAWA 2, PHASE II, ROS23DF0033 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG MANILA BAY, BARANGAY WAWA 1, PHASE II, ROS23DF0032 · ₱96,500,000.00 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, PHASE IV, BACOOR20DQ0073 · ₱96,499,876.22 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, PHASE II, BRGY. LAN20DQ0128 · ₱96,499,814.37 · mapped
- REHABILITATION OF MAJOR ROADS LEADING TO INTERNATIONAL BASKETBALL FEDERATION (FIBA) SITES, (1. PHILIPPINE ARENA, 2. SMART ARANETA COLISEUM, 3. RIZAL MEMORIAL SPORTS COMPLEX, 4. NINOY AQUINO STADIUM & 5. PHILSPORT COMPLEX)23O00078 · ₱96,499,796.98 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSREHABILITATION OF ROAD ALONG KAWIT-NOVELETA DIVERSION RD K0022+151-K0022 + 528, K0023+000-K0023+75024DF0154 · ₱95,521,855.51 · mapped
- ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE/BANK IMPV'T. OF MARICABAN CREEK, STA. 0+936 TO STA.1+17025OH0025 · ₱95,292,879.35 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGAYTAY-NASUGBU RD - K0072 + 240 - K0073 + 40023DB0089 · ₱94,954,760.00 · mapped
- CONSTRUCTION OF REVETMENT ALONG PARAÑAQUE RIVER, DISTRICT 1,PARAÑAQUE CITY, METRO MANILA25OC0123 · ₱94,570,737.10 · mapped
- ASPHALT OVERLAY ALONG C5 EXTENSION EB, DISTRICT 1PARAÑAQUE CITY, METRO MANILA24OC0098 · ₱92,639,980.40 · mapped
- CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-TULLAHAN RIVER (UPSTREAM SIDE), BRGY. POTRERO, MALABON CITY21O00095 · ₱92,448,907.12 · mapped
- Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 3, Taguig City22OB0101 · ₱91,577,975.10 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0111 + 628 - K0113 + 18023DB0086 · ₱89,647,260.00 · mapped
- Construction of Drainage System along Libertad Main (From Roxas Blvd to FB Harrison), Pasay City, Phase 324OH0038 · ₱89,163,791.72 · mapped
- CONSTRUCTION OF SLOPE AND FLOOD PROTECTION STRUCTURE ALONG CARMONA RIVER, PHASE 1, CARMONA, CAVITE23DQ0089 · ₱89,099,967.38 · mapped
- Construction of Slope and Flood Protection Structure along Carmona River, Phase 2, Carmona, Cavite23DQ0106 · ₱89,092,693.05 · mapped
- REHABILITATION/CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER WEST BANK (PACKAGE I), BARANGAY BAMBANG, TAGUIG CITY21OB0106 · ₱84,218,705.29 · mapped
- LOCAL PROGRAM-CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES-NATIONAL ROADS- ASPHALT OVERLAY ALONG BACOOR BOULEVARD (S04271LZ), PHASE II, BACOOR CITY, CAVITE21DQ0037 · ₱81,986,814.21 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0108 + 566 - K0110 + 00023DB0085 · ₱81,637,760.00 · mapped
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL RD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINT-SECONDARY RDS-PALICO-BALAYAN-BATANGAS RD-K0119+160-K0119+460,K0119+504-K0120+ 120,K0121+234-K0121+479,K0121+566-K0121+686,K0121+782-K0122+00023DB0088 · ₱79,611,260.00 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONTRUCTION OF REVETMENT ALONG MANILA BAY, BARANGAY WAWA 3, PHASE II, RO23DF0026 · ₱79,130,000.00 · mapped
- Construction of Gimaloto River Control, Sorsogon City, Sorsogon22FK0018 · ₱77,165,034.11 · mapped
- REHABILITATION OF PAMPANGA RIVER (INLCUDING PULO) AT ARAYAT AND MACABEBE, PAMPANGA, PROVINCE OF PAMPANGA20C00050 · ₱72,096,377.18 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0101 + 000 - K0102 + 000, K0103 + 000 - K0103 + 22623DB0084 · ₱71,891,260.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT ALONG ESTERO DE VALENCIA, STA. 0+916.17 TO STA. 0+971.37 AND STA. 0+979.87 TO S19OE0019 · ₱70,541,414.12 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA24OC0111 · ₱70,207,716.91 · mapped
- CONST./SEALING/IMPVT OF RIVERWALL ALONG MALABON-TULLAHAN RIVER (STA.1+043 TO 1+527 W/ EXEMP)BRGY TAN18OA0015 · ₱69,335,357.08 · mapped
- CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BACOOR RIVER HABAY II PHASE III, BACOOR CAVITE AND CONSTRUCTION OF REVETMENT ALONG MALIKSI RIVER EAST SIDE PHASE III BACOOR CAVITE19DQ0045 · ₱68,245,611.05 · mapped
- Construction of Flood Control Structure along Pililla River (Sta. 4 + 658 - Sta. 4 + 972), Barangay Hulo, Pililla, Rizal23DO0011 · ₱67,550,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CORAZON C. AQUINO AVE. K0037+875 - K040+10223DO0001 · ₱67,550,000.00 · mapped
- Construction of Revetment along Fisherman's Wharf (Phase IV), Barangay La Huerta, Parañaque City23OC0114 · ₱67,549,911.44 · mapped
- Construction of Revetment along Fisherman's Wharf (Phase III), Barangay La Huerta, Parañaque City23OC0100 · ₱67,543,629.01 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-SOUTH SUPER H-WAY-K0005+(-108)-K0005+519, K0007+766-K0007+1014,MAKATI CITY, METRO MANILA22OC0003 · ₱66,888,975.00 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0114 + 085 - K0114 + 468, K0114 + 820 - K0114 + 886, K0115 + 000 - K0115 + 64523DB0087 · ₱63,399,260.00 · mapped
- CONSTRUCTION OF REVETMENT WALL ALONG SAN JOSE CREEK (FROM J.P. RIZAL EXTENSION TO KALAYAAN AVENUE), BARANGAY CEMBO AND BARANGAY GUADALUPE NUEVO, MAKATI CITY, METRO MANILA19OC0029 · ₱60,514,189.40 · mapped
- Construction of Slope Protection Structure/Bank Improvement/Sheet Piling of Maricaban Creek (Sta. 0+468 to 0+702), Pasay City22OH0029 · ₱57,893,459.38 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MNGMT. PROGRAM CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS CONST. OF REVETMENT ALONG MALIKSI RIVER, EAST SIDE, PHASES I & II, BACOOR, CAVITE18D00055 · ₱56,045,414.67 · mapped
- REHABILITATION OF ROAD INCLUDING OTHER RELATED IMPROVEMENTS ALONG BACOOR-DASMARIÑAS NATIONAL RD., BACOOR CITY, CAVITE22DQ0057 · ₱49,443,621.19 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JUANITO R. REMULLA, SR. RD - K0040 + 916 - K0041 + 232, K0041 +22DQ0074 · ₱49,147,332.46 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-KALAYAAN AVE. EXT.-K0027+000-K0027+953, K0027+968-K0028+228,MAKATI CITY, METRO MANILA22OC0017 · ₱49,000,000.00 · mapped
- ASPHALT OVERLAY ALONG NINOY AQUINO AVENUEPARAÑAQUE CITY, METRO MANILA20OC0094 · ₱49,000,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 28336
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Apr 28, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 28336); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
32 evaluations listed across 7 GPPB CPES releases; average final rating 710.3% over 15 rated projects; 30 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱24,108,000.00 | Completed | 93.4% | 94.4% | 40th, p. 15 |
| May 5, 2025 | DPWH | ₱70,207,717.00 | On-going | 87.8% | — | 40th, p. 15 |
| Apr 29, 2025 | DPWH | ₱95,292,879.00 | On-going | 94.0% | — | 40th, p. 15 |
| Apr 7, 2025 | NIA | ₱22,533,720.00 | On-going | 86.3% | — | 39th (rev), p. 12 |
| Feb 13, 2025 | DPWH | ₱46,193,680.00 | Completed | 93.5% | 95.8% | 40th, p. 14 |
| Dec 1, 2024 | DPWH | ₱96,500,235.00 | Completed | 95.0% | 96.1% | 39th (rev), p. 12 |
| Nov 26, 2024 | DPWH | ₱29,388,853.00 | Completed | 92.4% | 93.6% | 39th (rev), p. 12 |
| Oct 21, 2024 | DPWH | ₱47,531,647.00 | On-going | 91.5% | — | 39th (rev), p. 12 |
| Oct 19, 2024 | DPWH | ₱24,112,232.00 | On-going | 95.1% | — | 39th (rev), p. 12 |
| Oct 15, 2024 | DPWH | ₱39,160,655.00 | On-going | 86.8% | — | 39th (rev), p. 12 |
| Aug 22, 2024 | DPWH | ₱43,160,741.00 | On-going | 97.4% | — | 38th, p. 11 |
| Aug 14, 2024 | DPWH | ₱48,999,833.00 | On-going | 94.8% | — | 38th, p. 11 |
Showing the 12 most recent of 32.
2 amounts flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 402 awards · ₱11,160,168,556.80
- NIA Infrastructure: 11 awards · ₱554,995,093.08
- City of Parañaque Infrastructure: 12 awards · ₱518,197,666.73
- NIA Goods & services: 3 awards · ₱112,102,136.22
- City of Manila Goods & services: 1 award · ₱89,437,420.00
- Department of Justice Infrastructure: 1 award · ₱42,252,824.27
- Pasig River Rehabilitation Commission Infrastructure: 1 award · ₱40,705,881.32
- Manila International Airport Authority Infrastructure: 2 awards · ₱39,653,413.25
- Municipality of San Mateo, Rizal Infrastructure: 6 awards · ₱33,820,643.53
- City of Valenzuela Infrastructure: 1 award · ₱33,504,806.69
- Province of Marinduque Infrastructure: 3 awards · ₱29,825,888.61
- City of Makati Infrastructure: 2 awards · ₱23,372,294.24
- City of Pasig Infrastructure: 4 awards · ₱20,999,753.06
- Municipality of Gingoog City, Misamis Oriental Infrastructure: 2 awards · ₱19,853,705.78
- Province of Rizal Infrastructure: 8 awards · ₱14,188,211.14
- Clark Development Corporation Infrastructure: 1 award · ₱10,251,987.83
- Marinduque State College Infrastructure: 1 award · ₱8,698,500.00
- City of Pasay Infrastructure: 1 award · ₱6,953,525.00
- Philippine Tourism Authority Infrastructure: 1 award · ₱3,523,131.21
- Municipality of San Mateo, Rizal Goods & services: 1 award · ₱2,968,000.00
- Province of Laguna Infrastructure: 1 award · ₱2,374,958.83
- Barangays and Sangguniang Kabataan Infrastructure: 3 awards · ₱627,727.60
- Proposed Asphalt Patching and Selective Overlay
- Construction of Revetment₱94,570,737.10· 2025-11-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25DO0011₱46,070,690.77· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL II DEO
- Construction Projects₱46,006,262.03· 2025-05-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- Construction Projects₱46,054,583.28· 2025-05-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- 25CP0027₱28,515,385.43· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- 25DQ0017₱140,936,658.98· 2025-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CAVITE 3RD DISTRIC
- 25DF0092₱51,937,561.81· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CAVITE I DEO
- Asset Preservation Program-Preventive Maintenance₱7,899,444.24· 2025-03-18· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25DF0036₱103,872,378.33· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CAVITE I DEO
- Contract ID No. 25OH0025₱95,292,879.35· 2025-03-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH METRO MANILA
- 25DO0016₱48,172,439.39· 2025-03-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL II DEO
- Contract ID No. 25OH0013₱48,578,750.59· 2025-03-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH METRO MANILA
- 25OH0012-Convergence and Special Support Program -₱2,363,952.39· 2025-03-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH METRO MANILA
- Asset Preservation Program₱20,533,094.22· 2025-02-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- Asset Preservation Program₱25,665,926.89· 2025-02-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- Asset Preservation Program₱6,653,206.59· 2025-02-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- Construction Projects₱3,735,910.78· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- Construction Projects₱20,405,544.37· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- Construction Projects₱8,962,667.91· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- Construction Projects₱26,642,167.05· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- 25D00197₱140,407,897.56· 2025-02-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- Construction Projects₱6,423,424.40· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- Construction Projects₱23,086,280.32· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- Construction Projects₱22,822,741.48· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →