C F TRINIDAD CONST AND SUPPLIES CORP FOR is listed as a company organization in Philippine public procurement records on this site, with 81 linked DPWH project(s) totaling about ₱1,982,805,189.59. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
C F TRINIDAD CONST AND SUPPLIES CORP FOR
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 81
- Total value
- ₱1,982,805,189.59
- Published flags
- 0
- Region
- Rizal 1st DEO · Region IV-A
Public Record Grade
A transparent, data-derived summary of reported public records for C F TRINIDAD CONST AND SUPPLIES CORP FOR — not an accusation or finding of wrongdoing.
Score: 89.20 / 100 · Projects in sample: 81 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 84.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 84.1
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 74
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 81
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 81
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 81
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 81
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 81
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 67 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CAINTA RIVER, BARANGAY SAN JUAN, CAINTA, RIZAL25D00084 · ₱94,087,004.90 · mapped
- CONSTRUCTION OF BREAKWATER AT BARANGAY LIMBON-LIMBON TO BARANGAY ITHAN, BINANGONAN, RIZAL25D00162 · ₱94,085,754.21 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CAINTA RIVER, BARANGAY SAN ROQUE, CAINTA, RIZAL25D00085 · ₱93,990,666.71 · mapped
- OO1-ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ANGONO - ANTIPOLO DIVERSION ROAD (ANGONO SECTION), PACKAGE D ANGONO, RIZAL21DN0020 · ₱67,549,991.49 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ANGONO-ANTIPOLO DIVERSION ROAD (ANGONO SECTION) PACKAGE B, RIZAL, RIZAL (FIRST DISTRICT)19DN0009 · ₱65,584,295.00 · mapped
- Construction/Rehabilitation of Flood Control Structure at Bangiad Creek, (Phase 2), Sta. 0+120 - Sta. 0+580, Taytay, Rizal22DN0060 · ₱57,898,640.09 · mapped
- CONSTRUCTION OF DRAINAGE ALONG LAKESHORE, BARANGAY KALAYAAN, ANGONO, RIZAL24D00242 · ₱55,186,567.20 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - TANAY - PILILLA ROAD LEADING TO WINDMILLS, TANAY-PILILLA, RIZAL19DO0035 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ANGONO RIVER, BARANGAY SAN VICENTE, ANGONO, RIZAL (FIRST DISTRICT)25DN0049 · ₱47,529,925.76 · mapped
- ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS, MANILA EAST RD., K0019+140 - K0019+830, K0021+1050 - K0023+033, K0023+040 - K0023+689, K0026+060 - K0026+640, RIZAL (FIRST DISTRICT) (CAINTA, TAYTAY, ANGONO)19DN0007 · ₱47,366,234.11 · mapped
- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF IMELDA AVENUE K0018+(-232) - K0018+520, K0020+588-K0021+638, CAINTA, RIZAL20DN0100 · ₱47,036,075.47 · mapped
- 001-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS TAYTAY DIVERSION ROAD (S01587LZ) K0022+036 - K0023+056, K0023+378-K0023+680, TAYTAY, RIZAL18DN0002 · ₱45,569,478.46 · mapped
- ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS, IMELDA AVE. - CH.0 - CH. 0915, K0018+520 - K0020+588, CH.0 - CH.566, RIZAL (FIRST DISTRICT) (CAINTA)19DN0012 · ₱41,239,264.67 · mapped
- Construction/Rehabilitation of Flood Control Structures of Cainta River, Brgy. San Roque and Brgy. San Andres, Sta. 0-400, Cainta, Rizal21DN0096 · ₱40,819,918.28 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE- TERTIARY ROADS, REHABILITATION (ASPHALT OVERLAY) SAN PABLO BDRY-DOLORES-PINAGDANLAYAN RD-K0101+1287-K0102+655, K0103+273-K0103+766, BRGY. MALIGAYA AND B23DJ0177 · ₱38,600,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, LUTUCAN-GUISGUIS PORT RD - K0115+(229) - K0115+702, SARIAYA, QUEZON PROVINCE24DJ0216 · ₱38,600,000.00 · mapped
- Construction/Rehabilitation of Flood Control Structure at Patoto Creek, (Phase 2), Sta. 0+141.6 - Sta. 0+440, Taytay, Rizal22DN0082 · ₱38,092,846.40 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ANGONO - ANTIPOLO DIVERSION ROAD (ANGONO SECTION) COMPLETION, RIZAL, ANGONO, RIZAL (FIRST DISTRICT)22DN0050 · ₱38,002,394.33 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES/ INTERCEPTOR FROM HALANG CREEK TO MUNTINDILAW RIVER ALONG MARIKINA DIVERSION ROAD AND MARIKINA - INFANTA ROAD (PHASE 2) ANTIPOLO CITY21DN0024 · ₱37,626,120.03 · mapped
- IMPROVEMENT/CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF NHA CREEK, BRGY. DELA PAZ, ANTIPOLO CITY (FIRST DISTRICT)19DN0113 · ₱37,587,960.96 · mapped
- ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS, CAINTA-KAYTICKLING-ANTIPOLO-TERESA-MORONG RD., K0020+571 - K0020+826, K0019+225 - K0018+013, K0018+-013 - K0018+445, K0019+000 - K0019+051, K0019+078 - K0019+500, RIZAL (1ST DIST.) (CAINTA, TAYT19DN0010 · ₱34,644,103.13 · mapped
- MFO-1 NATIONAL ROAD NETWORK SERVICES-ASSET PRESERVATION OF NATL. RDS. PREVENTIVE MAINT. BASED ON PAVEMENT MANAGEMENT SYSTEM/HWY. DEVELOPMENT & MANAGEMENT-4 (HDM-4), TAYTAY DIV. ROAD, K0022+(-750)-K0022+036, TAYTAY, RIZAL, 1ST LD17DN0022 · ₱34,289,509.94 · mapped
- IMPROVEMENT / CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF CAINTA RIVER, BRGY. SAN JUAN CAINTA, RIZAL20DN0063 · ₱29,512,156.34 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS, REHABILITATION (ASPHALT OVERLAY) LUTUCAN-GUISGUIS PORT RD-K0124+080-K0124+580, K0124+591-K0125+140, BRGY. BIGNAY 1 AND BRGY. GUISGUIS TAL23DJ0174 · ₱28,950,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION AND DRAINAGE SYSTEM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT EAST MANGGAHAN RIVER, TAYTAY, RIZAL18DN0104 · ₱27,937,317.97 · mapped
- MFO1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-SECONDARY ROADS-MANILA EAST ROAD-K0045+260-K0046+108 MORONG RIZAL17DO0021 · ₱27,713,420.00 · mapped
- Construction of Slope Protection Structure, Patoto Creek, Taytay, Rizal22DN0081 · ₱27,343,115.77 · mapped
- NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, BINANGONAN DIVERSION ROAD, K0035+(-678) TO K0035+405, BINANGONAN, RIZAL16DN0011 · ₱25,461,061.60 · mapped
- OO1-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, BINANGONAN DIVERSION ROAD, K0034+396-K0035+273 (S01581LZ), BINANGONAN, RIZAL18DN0102 · ₱23,475,209.30 · mapped
- ORGANIZATIONAL OUTCOME 2: CONSTRUCTION/MAINTENANACE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION WITH SLOPE PROTECTION OF BALANTI CREEK, CAINTA, RIZAL18DN0127 · ₱19,600,000.00 · mapped
- REHABILITATION WITH SLOPE PROTECTION OF KAYTICKLING CREEK, PHASE 2, BRGY. SAN ISIDRO, TAYTAY, RIZAL, 1ST LD17DN0037 · ₱19,600,000.00
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MANILA EAST RD - K0020+380 - K0020+630 TAYTAY, RIZAL (FIRST D23DN0061 · ₱19,599,865.25 · mapped
- ASSETPRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS, TAYTAY DIV. RD. K0023+056 - K0023+378, RIZAL (FIRST DISTRICT) TAYTAY)19DN0003 · ₱19,599,753.08 · mapped
- Construction of Flood Control Structure, Taytay River (Package 2), Taytay, Rizal24DN0046 · ₱19,599,554.70 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL AT EAST MANGGAHAN RIVER, TAYTAY, RIZAL19DN0093 · ₱19,594,299.85 · mapped
- OO2-REHABILITATION WITH SLOPE PROTECTION OF DIVERSION CHANNEL, TAYTAY, RIZAL18DN0101 · ₱19,590,443.90 · mapped
- REHABILITATION WITH SLOPE PROTECTION OF DIVERSION CHANNEL, PHASE 2, BRGY. SAN JUAN, TAYTAY, RIZAL17DN0042 · ₱19,569,629.23
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA, BARANGAY SAN RAFAEL, RODRIGUEZ, RIZAL23DO0073 · ₱19,238,576.75 · mapped
- IMPROVEMENT/ CONCRETING WITH DRAINAGE SYSTEM OF KEEP MOVING AVENUE, BRGY. KALAYAAN, ANGONO, RIZAL20DN0121 · ₱19,203,029.86 · mapped
- ASSET PRESERVATION- CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS, TAYTAY DIV. RD. - CH.000 - CH.541, K0022+(-780) - K0023+600, RIZAL (FIRST DISTRICT) TAYTAY, RIZAL19DN0071 · ₱18,992,643.04 · mapped
- MFO-2 - FLOOD MANAGEMENT SERVICES, CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHAB. WITH SLOPE PROTECTION OF DIVERSION CHANNEL, BRGY. SAN JUAN, TAYTAY, RIZAL, 1ST LD15DN0153 · ₱18,882,337.21
- LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION/IMPROVEMENT OF TANAY-PILILLA ROAD LEADING TO WINDMILLS, TANAY, RIZAL18DO0080 · ₱18,717,294.35 · mapped
- REHABILITATION WITH SLOPE PROTECTION OF KAYTICKLING CREEK, BRGY. DOLORES, TAYTAY, RIZAL18DN0071 · ₱18,674,598.55 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES, TAYTAY RIVER TAYTAY, RIZAL19DN0185 · ₱18,614,881.20 · mapped
- CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT TOMAS CLAUDIO MEMORIAL ELEMENTARY SCHHOL, MORONG, RIZAL18DO0131 · ₱18,423,358.39 · mapped
- MFO-2 FLOOD MANAGEMENT SERIVES, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHAB. WITH SLOPE PROTECTION AT KAYTICKLING CREEK, BRGY. DOLORES, TAYTAY, RIZAL, 1ST LD16DN0037 · ₱18,420,770.67 · mapped
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHAB. WITH SLOPE PROTECTION OF KAYTICKLING CREEK, BRGY. SAN ISIDRO, TAYTAY, RIZAL, 1ST LD16DN0022 · ₱18,381,398.84 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL AT EAST MANGGAHAN RIVER, TAYTAY, RIZAL20DN0004 · ₱18,019,476.55 · mapped
- MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS, CONSTRUCTION/ UPGRADING/REHABILITATION OF DRAINAGE ALONG TAYTAY DIVERSION ROAD, K0023+056 - K0023+378, TAYTAY, RIZAL17DN0041 · ₱17,843,650.30 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES, TAYTAY RIVER, TAYTAY, RIZAL20DN0002 · ₱17,482,294.08 · mapped
Equipment & capacity
PCAB license
- License no.
- 09199
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Nov 28, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 09199); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; average final rating 89.2% over 1 rated project; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Sep 3, 2019 | DPWH | ₱19,599,753.00 | Completed | 89.2% | 89.2% | 40th, p. 58 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →