CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHAB. WITH SLOPE PROTECTION OF KAYTICKLING CREEK, BRGY. SAN ISIDRO, TAYTAY, RIZAL, 1ST LD
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHAB. WITH SLOPE PROTECTION OF KAYTICKLING CREEK, BRGY. SAN ISIDRO, TAYTAY, RIZAL, 1ST LD is a DPWH-tracked public work in Rizal 1st DEO, Region IV-A. Reported contract value: ₱18,381,398.84. Status: Reported complete (DPWH). Contractor on record: C F TRINIDAD CONST AND SUPPLIES CORP FOR. Figures trace to dpwh.
Total Contract Cost
