PERSAN CONST INC FORMERLY: PERSAN CONST is listed as a company organization in Philippine public procurement records on this site, with 170 linked DPWH project(s) totaling about ₱9,981,994,678.13. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
PERSAN CONST INC FORMERLY: PERSAN CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 170
- Total value
- ₱9,981,994,678.13
- Published flags
- 10
- Region
- Metro Manila 3rd DEO · National Capital Region
Online presence
persan.phGoogle Maps business profile, 2026-10-22
Google Maps: Persan Construction, Inc.★ 4.6 (9 reviews)Google Maps, 2026-10-22
249 Quirino Hwy, Quezon City, 1100 Metro Manila
Public Record Grade
A transparent, data-derived summary of reported public records for PERSAN CONST INC FORMERLY: PERSAN CONST — not an accusation or finding of wrongdoing.
Score: 84.20 / 100 · Projects in sample: 170 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 70.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 70.9
- lateCompletedProjects
- 18
- onTimeCompletedProjects
- 125
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 166
- pastTargetOngoingProjects
- 23
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 94.7/100 · Weight: 21%
- totalProjects
- 170
- componentScore
- 94.7
- terminatedProjects
- 3
- terminationRatePct
- 1.8
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 169
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.1/100 · Weight: 11%
- projects
- 170
- componentScore
- 99.1
- flagsPerProject
- 0.03
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 170
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 166 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF 4 STOREY W/ BASEMENT PARKING AND ROOF DECK DPWH REGIONAL OFFICE XI, ADMINISTRATIVE, MANPOWER DEVELOPMENT AND FINANCIAL MANAGEMENT BUILDING, R. MAGSAYSAY COR. CHAVEZ STS., DAVAO CITY20L00132 · ₱341,456,028.44 · mapped
- CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES-GENERAL ALEJO SANTOS BRIDGE (BO0013LZ) ALONG BALIWAG-BUSTOS ROAD, PROVINCE OF BULACAN16C00074 · ₱282,746,283.85 · mapped
- CLUSTER 2 1.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (BUSDI BR.), MALAYBALAY CITY 2.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (MATILOM BR.), IMPASUG-ONG, BUKIDNON 3.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD19KA0138 · ₱260,147,547.66 · mapped
- CONSTRUCTION OF MILITARY POLICE BATALLION ADMINISTRATION BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY20O00014 · ₱231,590,998.26 · mapped
- ROAD WIDENING OF MARINDUQUE CIRCUMFERENTIAL ROAD, KO016+000.00-KO018+351.00, MARINDUQUE21E00042 · ₱228,355,630.17 · mapped
- REPLACEMENT OF WEAK BRIDGES - BINAYAAN BRIDGE (B00037SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, STA. 27+718.40 - STA. 28+226.50, ROMBLON22E00055 · ₱221,912,364.93 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA24C00181 · ₱192,999,969.37 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE-PHASE 3-BALER, AURORA, PROVINCE OF AURORA25C00003 · ₱189,202,290.09 · mapped
- CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 123D00143 · ₱187,214,202.29 · mapped
- CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 223D00142 · ₱187,212,862.78 · mapped
- SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE23E00007 · ₱185,858,997.05 · mapped
- CLUSTER BUK-01 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (MALUSIKOB BR.) MALAYBALAY CITY, BUKIDNON = PHP65,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL STRUCT...20K00369 · ₱185,713,115.49 · mapped
- IMPROVEMENT/WIDENING OF MARINDUQUE CIRCUM. ROAD, SECT. 1: KO070+420 KO072+380 (STA. 70+420-STA. 72+480); SECT. 2: KO092+000-KO092+977 (STA. 92+000-STA. 92+977): SECT. 3: KO098+060-KO098+980 (STA. 98+060-STA. 98+980), MARINDUQUE17E00001 · ₱144,741,732.69 · mapped
- CONSTRUCTION OF BRIDGE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - BRGY. MACAPARI, DAMULOG -SITIO TALASAN, BRGY. PINAMANGGUHAN ROAD, KADINGILAN, BUKIDNON (PACKAGE III)22K00314 · ₱140,696,849.10 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 224D00190 · ₱139,957,436.44 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 324D00207 · ₱137,365,268.11 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 124D00189 · ₱137,125,724.61 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 424D00208 · ₱131,724,934.97 · mapped
- CLUSTER BUK1-02 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (KULAMAN BR.) MALAYBALAY CITY, BUKIDNON = PHP70,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL ...20K00370 · ₱127,154,662.80 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-JCT BATASAN-SN MATEO-RODRIGUEZ BYPASS LINK ROAD, RIZAL25DO0076 · ₱124,413,132.58 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BOAC-MOGPOG BYPASS ROAD, MARINDUQUE20E00002 · ₱106,149,975.68 · mapped
- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- BOAC-MOGPOG BY-PASS ROAD, MARINDUQUE23E00001 · ₱102,620,734.89 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIV19DQ0010 · ₱97,464,244.01 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG GOV JJ LINAO ROAD (SO4822LZ) KO141+600-KO143+147, KO143+345-KO146+000, KO148+365-KO148+820, BATAAN 2ND DISTRICT21CB0053 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHANGE (MVUC) AS PER R.A. 11239 - REPAIR/REHABILITATION OF SAN MATEO RODRIGUEZ ROAD, RODRIGUEZ RIZAL K0027+500 - K0034+07821DO0007 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - MARIKINA-INFANTA RD - K0069+200 - K0072+069 TANAY, RIZAL, 2ND LD23DO0017 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYATING RIVER (SEGMENT 5), CAMILING, TARLAC25CJ0010 · ₱96,500,000.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - CONSTRUCTION/REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BAGAC - MARIVELES ROAD KO177+020-KO177+140, BATAAN 2ND DISTRICT21CB0051 · ₱96,500,000.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG ROMAN EXPRESSWAY (SO1313LZ) KO119+000-KO119+200, KO119+800-KO119+923, KO120+000-KO120+665, KO121+871-KO122+067, KO122+113-KO122+531, KO125+466-KO126+1821CB0052 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REPAIR/REHABILITATION OF MANILA EAST ROAD K0056+000 TO K0064+000 PILILLA, RIZAL21DO0008 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-JCT BATASAN-SAN MATEO-RODRIGUEZ BYPASS LINK ROAD, RIZAL24DO0072 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MATEO - RODRIGUEZ RD - K0021+(-418) - K0022+025, K0021+(-463) - K0021+(-418), K0022+025 - K0023+00023DO0003 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 CONSTRUCTION/REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PAG-ASA - TALA ROAD LEADING TO MT. NATIB, BATAAN NATIONAL PARK,21CA0098 · ₱96,499,999.84 · mapped
- NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH OFFICE BUILDING OF RIZAL 2ND DEO, BARAS, RIZAL25DO0042 · ₱96,361,182.44 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) DR. DAMIAN REYES ROAD (TORRIJOS SIDE) STA. 45+141-STA.47+470.80; T16E00003 · ₱95,807,052.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANK OF SHELTERVILLE CREEK, BARANGAY 171, CALOOCAN CITY18OD0198 · ₱93,917,846.60 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL25DO0012 · ₱92,156,557.61 · mapped
- Construction of Flood Control Wall along the Banks of Creeks, Brgy. 171 Phase 2, Caloocan City23OD0106 · ₱90,070,431.63 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF MATARIK, BARANGAY 176 (PHASE 3), CALOOCAN CITY25OD0036 · ₱89,931,184.37 · mapped
- Construction of Flood Control Wall along the Banks of Creeks, Brgy. 172, Caloocan City23OD0085 · ₱89,748,679.99 · mapped
- Construction of Flood Control Wall along Jacinto Creek and Robes Creek, Brgy. 175, Caloocan City23OD0088 · ₱89,748,579.45 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL23DO0092 · ₱86,850,000.00 · mapped
- Construction of Flood Control and Bank Protection Structure along Lukutang Malaki River, Rodriguez (Montalban), Rizal23DO0064 · ₱80,705,888.18 · mapped
- Construction of Flood Control Structure along Puray River, Barangay San Isidro, Rodriguez, Rizal, Phase I23DO0067 · ₱78,557,807.92 · mapped
- REPLACEMENT OF BAMBANG BRIDGE BOCAUE, BULACAN19CC0287 · ₱74,249,494.29 · mapped
- CONSTRUCTION OF 2 UNITS- 4 STOREY - 24 CLASSROOM PARADA NHS, STA. MARIA, BULACAN16CD0205 · ₱73,570,080.00 · mapped
- ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NANGKA RIVER (STA. 0+3823DO0090 · ₱69,480,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (BULONAY BR.), IMPASUG-ONG, BUKIDNON20KA0102 · ₱69,300,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, DR. DAMIAN REYES RD (BOAC SIDE) - K0010+276 - K0011+01421EA0138 · ₱65,869,916.65 · mapped
- Construction of Flood Control Wall along the Banks of Creek, Brgy. 176, Caloocan City22OD0070 · ₱65,374,049.41 · mapped
Equipment & capacity
PCAB license
- License no.
- 02852
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jul 20, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 02852); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 4 GPPB CPES releases; average final rating 90.2% over 4 rated projects; 9 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Dec 1, 2024 | DPWH | ₱86,852,988.00 | Completed | 98.4% | 94.1% | 39th (rev), p. 160 |
| Nov 29, 2024 | DPWH | ₱48,999,924.00 | Completed | 89.6% | 93.0% | 39th (rev), p. 160 |
| Oct 22, 2024 | DPWH | ₱137,125,725.00 | On-going | 89.7% | — | 39th (rev), p. 160 |
| Sep 24, 2024 | NHA | ₱99,678,000.00 | Completed | 79.8% | 79.9% | 39th (rev), p. 160 |
| Aug 17, 2024 | DPWH (JV) | ₱146,679,616.00 | On-going | 95.2% | — | 38th, p. 184 |
| Aug 23, 2023 | DPWH (JV) | ₱140,696,849.00 | On-going | 96.8% | — | 36th, p. 155 |
| Mar 14, 2023 | DPWH (JV) | ₱140,696,849.00 | On-going | 92.6% | — | 35th, p. 129 |
| Dec 12, 2022 | DPWH (JV) | ₱1,747,730,781.00 | On-going | 93.9% | — | 35th, p. 129 |
| Oct 19, 2022 | DPWH (JV) | ₱96,500,000.00 | Completed | 94.0% | 93.9% | 35th, p. 139 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →