Flood Control and Drainage20KA0102

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (BULONAY BR.), IMPASUG-ONG, BUKIDNON

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (BULONAY BR.), IMPASUG-ONG, BUKIDNON is a DPWH-tracked public work in Bukidnon 1st DEO, Region X. Reported contract value: ₱69,300,000.00. Status: Reported complete (DPWH). Contractor on record: PERSAN CONST INC FORMERLY: PERSAN CONST. Figures trace to dpwh.

Bukidnon 1st DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱66,645,785

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-03-02 → 2024-01-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bukidnon

Based on the coordinates published with the DPWH record and NOAH file Bukidnon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (BULONAY BR.), IMPASUG-ONG, BUKIDNON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Saguiaran River Package 1, Kalilangan, Bukidnon
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Bukidnon 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20KA0102 (Readvertisement)

₱66,645,784.93 · Awardee from PhilGEPS

Award / contract ref: 20KA0102 (Readvertisement)

Contractor

B

170 projects · ₱10.0B total · 10 flags

4. Implementation

Contract Amount

₱69,300,000.00

Progress

Reported complete (DPWH)

Start Date

November 23, 2020

Target End

April 6, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)BukidnonImpasug-ongBulonay
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.