| DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY | Region XI | ₱989.1M | 89% reported progress | ULTICON BUILDERS INC | 30 | Check in |
| DAVAO CITY COASTAL BYPASS RD AT JCT. DAVAO-COTABATO RD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AVE.-S | Region XI | ₱352.1M | Reported complete | ULTICON BUILDERS INC | 38 | Check in |
| Construction of Flood Control Structure at Tagoloan River, Package 6, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱282.3M | Reported complete | RAMISES CONST / EQUI-PARCO CONST CO | 100 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL | Region X | ₱282.2M | Reported complete | ME 3 CONST | 100 | Check in |
| Construction of Flood Control Structure at Tagoloan River, Package 8, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱280.8M | Reported complete | EQUI-PARCO CONST CO / TRIPARCO DEVELOPMENT CORP | 98 | Check in |
| Construction of Flood Control Structure at Tagoloan River, Package 7, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱279.4M | Reported complete | EQUI-PARCO CONST CO / TRIPARCO DEVELOPMENT CORP | 98 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PUGAAN RIVER, PACKAGE 5, MISAMIS ORIENTAL | Region X | ₱274.2M | 73% reported progress | EQUI-PARCO CONST CO | 98 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PUGAAN RIVER, PACKAGE 6, MISAMIS ORIENTAL | Region X | ₱274.2M | 60% reported progress | EQUI-PARCO CONST CO | 98 | Check in |
| CONSTRUCTION/ REHABILITATION OF CAGAYAN DE ORO RIVER BASINS, CALA-CALA SECTION, BRGY. MACASANDIG, CAGAYAN DE ORO CITY | Region X | ₱268.0M | Reported complete | ADFIL CORP | 97 | Check in |
| Construction of Flood Control Structure at Tagoloan River, Package 10, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱266.2M | Reported complete | HAPPY ALL3 BUILDERS CORP / EQUI-PARCO CONST CO | 98 | Check in |
| DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 32, DAVAO CITY | Region XI | ₱248.0M | Reported complete | ULTICON BUILDERS INC | 31 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 11, MISAMIS ORIENTAL | Region X | ₱237.6M | 61% reported progress | RAMISES CONST | 99 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 13, MISAMIS ORIENTAL | Region X | ₱237.6M | 61% reported progress | TRIPARCO DEVELOPMENT CORP | 99 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 14, MISAMIS ORIENTAL | Region X | ₱237.6M | 61% reported progress | EQUI-PARCO CONST CO | 99 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 12, MISAMIS ORIENTAL | Region X | ₱237.6M | 65% reported progress | EQUI-PARCO CONST CO | 99 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAWAGA RIVER, LINABO BRIDGE SECTION, BRGY VIOLETA, VIOLETA, MALAYBALAY, BUKIDNON (PACKAGE 1) | Region X | ₱193.2M | 30% reported progress | VICENTE T LAO CONST | 38 | Check in |
| CONSTRUCTION OF BUNAWAN- VERUELA- SANTA JOSEFA ROAD (PHASE 6), AGUSAN DEL SUR | Region XIII | ₱192.9M | Reported complete | ULTICON BUILDERS INC | 76 | Check in |
| CONST./WIDENING/IMPVT. OF BYPASS RD @ JCT. DAVAO CITY DIV. RD-TIGATTO RD-JCT. DAVAO CITY DIV. RD INC | Region XI | ₱192.7M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 30 | Check in |
| CLUSTER 49 CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS IN BUKIDNON | Region X | ₱192.0M | Reported complete | M MONTESCLAROS ENT INC | 25 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, AGUSAN RIVER, PHASE IV, VERUELA, AGUSAN DEL SUR | Region XIII | ₱189.2M | 94% reported progress | ROCK DIWATA BUILDERS INC | 76 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | ₱189.0M | 57% reported progress | M MONTESCLAROS ENT INC | 25 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | ₱189.0M | 92% reported progress | M MONTESCLAROS ENT INC | 25 | Check in |
| CONSTRUCTION OF HIJO RIVER FLOOD CONTROL WITH PROMENADE FROM BRGY. APOKON TO BARANGAY MAGDUM, TAGUM CITY, DAVAO DEL NORTE | Region XI | ₱188.5M | Reported complete | D L CERVANTES CONST CORP FORMERLY: | 13 | Check in |
| CONSTRUCTION OF FLOOD PROTECTION DIKE GABION TYPE, TAMIA, COMPOSTELA, DAVAO DE ORO | Region XI | ₱187.7M | Reported complete | METRO GEAR CONST CORP | 34 | Check in |
| CLUSTER BUK-01 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (MALUSIKOB BR.) MALAYBALAY CITY, BUKIDNON = PHP65,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL STRUCT... | Region X | ₱185.7M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST | 61 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG VALENCIA BYPASS ROAD EXTENSION (SUGOD BRIDGE SECTION), PACKAGE 9, VALENCIA CITY, BUKIDNON | Region X | ₱184.3M | 70% reported progress | M MONTESCLAROS ENT INC | 26 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 7, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱184.2M | Reported complete | M MONTESCLAROS ENT INC | 27 | Check in |
| Construction of Flood Mitigation Structure along Pulangi River, Package 2, San Isidro, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱184.1M | Reported complete | M MONTESCLAROS ENT INC | 31 | Check in |
| Construction of Flood Control Structure along Maramag Maradugao (Downstream), Macapantig Bridge with slope protection, Package 3, Kalilangan, Bukidnon | KALILANGAN (BUKIDNON), BUKIDNON | ₱184.0M | Reported complete | M MONTESCLAROS ENT INC | 40 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 8, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱183.9M | Reported complete | M MONTESCLAROS ENT INC | 27 | Check in |
| Construction of Flood Mitigation Structure along Pulangi River, Package 1, San Isidro, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱183.9M | Reported complete | M MONTESCLAROS ENT INC | 31 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | ₱179.6M | 85% reported progress | M MONTESCLAROS ENT INC | 15 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | ₱179.5M | 67% reported progress | M MONTESCLAROS ENT INC | 32 | Check in |
| Construction of Flood Control Structure (with esplanade) along Pulangi River, Brgy. Poblacion, Package 4, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱178.8M | Reported complete | M MONTESCLAROS ENT INC | 22 | Check in |
| REHABILITATION OF TALOMO RIVER, TALOMO BRIDGE DOWNSTREAM SECTION, LEFT BANK, DAVAO CITY | Region XI | ₱178.2M | 67% reported progress | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 39 | Check in |
| CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | ₱175.4M | 83% reported progress | ED1SON DEVELOPMENT & CONST INC | 70 | Check in |
| CLUSTER 19 CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS&PRINCIPAL RIVERS BUK | Region X | ₱174.0M | Reported complete | PREMIUM MEGASTRUCTURES INC | 31 | Check in |
| Construction of Digos River Flood Control Project, Barangay Ruparan (Section 4), City of Digos, Davao del Sur | CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR), DAVAO DEL SUR | ₱173.7M | Reported complete | MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP | 76 | Check in |
| Construction of Digos River Flood Control Project, Barangay Ruparan (Section 5), City of Digos, Davao del Sur | CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR), DAVAO DEL SUR | ₱173.7M | Reported complete | MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP | 76 | Check in |
| Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Rd, Surigao del Sur | CITY OF BISLIG (SURIGAO DEL SUR), SURIGAO DEL SUR | ₱173.7M | Reported complete | J M LUCIANO CONST INC / SURIGAO LA SUERTE CORP | 94 | Check in |
| Construction of Agusan River Flood Control (Phase II), Veruela, Agusan del Sur | VERUELA (AGUSAN DEL SUR), AGUSAN DEL SUR | ₱173.7M | Reported complete | ROCK DIWATA BUILDERS INC | 76 | Check in |
| Construction of Digos River Flood Control Project, Barangay Ruparan (Section 3), City of Digos, Davao del Sur | CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR), DAVAO DEL SUR | ₱173.6M | Reported complete | MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP | 77 | Check in |
| Construction of Digos River Flood Control Project, Barangay Ruparan (Section 6), City of Digos, Davao del Sur | CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR), DAVAO DEL SUR | ₱173.6M | Reported complete | P L SEBASTIAN CONST INC FORMERLY: P L SEBASTIAN CONST | 77 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, BARANGAY RUPARAN, BARANGAY TRES DE MAYO, BARANGAY COGON, BARANGAY ZONE 1 & BARANGAY APLAYA, DIGOS CITY, DAVAO DEL SUR | Region XI | ₱173.4M | Reported complete | R D POLICARPIO & CO INC | 77 | Check in |
| CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 2), DIGOS CITY, DAVAO DEL SUR | Region XI | ₱173.2M | 95% reported progress | DREIRICH BUILDERS | 77 | Check in |
| CONST. OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG MANAT RIVER,TAPIA SECTION,MONTEVISTA,COMPOST | Region XI | ₱170.8M | Reported complete | DAVAO SANTHONY BUILDERS CORP | 40 | Check in |
| CLUSTER 39 CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASIN & PRINCIPAL RIVERS | Region X | ₱167.8M | Reported complete | NORTHERN BUILDERS | 97 | Check in |
| CONSTRUCTION OF PULANGI RIVERBANK PROTECTION (DOWNSTREAM OF CARMEN BR., RIGHT BANK), PHASE II, STA. 0+000 - STA. 0+652.5, BARANGAY UGALINGAN, CARMEN, COTABATO | Region XII | ₱167.2M | 13% reported progress | MARCUS CONST | 71 | Check in |
| CONSTRUCTION OF PULANGI RIVERBANK PROTECTION (DOWNSTREAM OF CARMEN BR., RIGHT BANK), PHASE III, STA. 0+652.5 - STA. 01+286.5, BARANGAY UGALINGAN, CARMEN, COTABATO | Region XII | ₱167.0M | 5% reported progress | P L SEBASTIAN CONST INC FORMERLY: P L SEBASTIAN CONST | 71 | Check in |
| CONSTRUCTION OF MATINA RIVER CUT-OFF CHANNEL, BALUSONG SECTION, DAVAO CITY | Region XI | ₱165.3M | 70% reported progress | NORTHERN BUILDERS | 37 | Check in |
| CONSTRUCTION OF BISLIG CITY COASTAL PROTECTION ALONG SURIGAO-DAVAO COASTAL RD, SURIGAO DEL SUR | Region XIII | ₱161.7M | Reported complete | J M LUCIANO CONST INC | 94 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT ALONG TAGUM LIBUGAN RIVER, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | ₱161.6M | 99% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 7 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUGAAN RIVER, MISAMIS ORIENTAL (PACKAGE 3) | Region X | ₱156.0M | Reported complete | EQUI-PARCO CONST CO | 98 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PUGAAN RIVER, MISAMIS ORIENTAL (PACKAGE 4) | Region X | ₱155.5M | Reported complete | REDLION MEGATRADE INC | 98 | Check in |
| CONSTRUCTION OF CAGAYAN DE ORO RIVER BASINS, PACKAGE 1, CAGAYAN DE ORO CITY | Region X | ₱151.6M | 71% reported progress | RAMISES CONST | 95 | Check in |
| CONSTRUCTION OF CAGAYAN DE ORO RIVER BASINS, PACKAGE 3, CAGAYAN DE ORO CITY | Region X | ₱151.3M | 66% reported progress | RAMISES CONST | 95 | Check in |
| CONSTRUCTION OF CAGAYAN DE ORO RIVER BASINS, PACKAGE 2, CAGAYAN DE ORO CITY | Region X | ₱151.3M | 70% reported progress | RAMISES CONST | 95 | Check in |
| CLUSTER G CONST. OF VARIOUS FLOOD CONTROL PROJECTS IN LANAO DEL SUR | Region X | ₱148.9M | Reported complete | N B SALBO CONST | 95 | Check in |
| Construction of Flood Control Structure along Hijo River, Brgy. Madaum, Tagum City, Davao del Norte | CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE), DAVAO DEL NORTE | ₱148.5M | Reported complete | KANAWAY BUILDERS CORP | 7 | Check in |
| Construction of Hijo River Flood Control Structure along Brgy. Madaum, Tagum City, Davao del Norte | CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE), DAVAO DEL NORTE | ₱148.5M | Reported complete | ROSBILL CONST AND SUPPLY / NICOMAG UTILITY PROJECTS CONST | 7 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CAGAYAN DE ORO RIVER BASIN, BARANGAY MACASANDIG, PACKAGE 4, CAGAYAN DE ORO CITY | Region X | ₱148.0M | Reported complete | MINDANAO ROCK | 96 | Check in |
| CONSTRUCTION OF CAGAYAN DE ORO RIVER BASINS, BARANGAY MACASANDIG, PACKAGE 1, CAGAYAN DE ORO CITY | Region X | ₱147.3M | Reported complete | EQUI-PARCO CONST CO | 97 | Check in |
| CONSTRUCTION OF NASIPIT FLOOD CONTROL TARRAGONA, DAVAO ORIENTAL | Davao Oriental 1st DEO | ₱146.3M | 61% reported progress | DREIRICH BUILDERS | 27 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 4, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱145.4M | Reported complete | M MONTESCLAROS ENT INC | 26 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 2, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱145.4M | Reported complete | M MONTESCLAROS ENT INC | 26 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 3, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱145.2M | Reported complete | M MONTESCLAROS ENT INC | 27 | Check in |
| Construction of Flood Mitigation Structure in Barangay Magkalungay, San Fernando, Bukidnon | SAN FERNANDO (BUKIDNON), BUKIDNON | ₱144.8M | Reported complete | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 29 | Check in |
| REHABILITATION OF EARTHDIKE WITH SLOPE PROTECTION ALONG TUGANAY RIVER, B.E. DUJALI, DAVAO DEL NORTE | Region XI | ₱144.8M | Reported complete | METRO GEAR CONST CORP | 1 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUIBAWA RIVER, BANTACAN, NEW BATAAN, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | ROAD EDGE TRADING | 27 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | AB APONESTO CONST PARTS AND SUPPLY INC | 48 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE II | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 47 | Check in |
| CONSTRUCTION OF REVETMENT ALONG AUNAN CREEK (UPSTREAM L/S) LEADING TO AGUSAN RIVER, BARANGAY BABAG, MONKAYO, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | ROSBILL CONST AND SUPPLY | 39 | Check in |
| CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 1, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | AB APONESTO CONST PARTS AND SUPPLY INC | 48 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAMOKAN CREEK LEADING TO AGUSAN RIVER, BANGOY BRIDGE SECTION, BARANGAY SAN ROQUE, NEW BATAAN, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | ROSBILL CONST AND SUPPLY | 24 | Check in |
| CONSTRUCTION OF REVETMENT ALONG AUNAN CREEK(JUNCTION L/S) LEADING TO AGUSAN RIVER, BARANGAY BABAG, MONKAYO, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | ROSBILL CONST AND SUPPLY | 39 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER (MANAT BRIDGE UPSTREAM) LEADING TO AGUSAN RIVER, BARANGAY NEW VISAYAS, MONTEVISTA, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | METRO GEAR CONST CORP | 34 | Check in |
| CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 2, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱144.7M | Reported complete | AB APONESTO CONST PARTS AND SUPPLY INC | 47 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-PULANGI BANK PROTECTION, RIGHT & LEFT BANK OF TUNGGOL FLOODWAY, PACKAGE A-PHASE I, STA. 3+300-STA. 3+511 | Region XII | ₱144.7M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 80 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-PULANGI BANK PROTECTION, RIGHT & LEFT BANK OF TUNGGOL FLOODWAY, PACKAGE B-PHASE 1, STA. 3+689-STA. 3+930 | Region XII | ₱144.7M | Reported complete | ABU CONST | 79 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-PULANGI BANK PROTECTION, RIGHT & LEFT BANK OF TUNGGOL FLOODWAY, PACKAGE C-PHASE 1, STA. 15+650-STA. 15+881 | Region XII | ₱144.6M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 80 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAGOLOAN RIVER, MARIBOJOC SECTION, PACKAGE 1, TAGOLOAN, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | ₱144.4M | 98% reported progress | ED1SON DEVELOPMENT & CONST INC | 96 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, AGUSAN RIVER, PHASE V, VERUELA, AGUSAN DEL SUR | Region XIII | ₱144.2M | 93% reported progress | ROCK DIWATA BUILDERS INC | 76 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UMALAG RIVER, PACKAGE 1, CAGAYAN DE ORO CITY | Region X | ₱144.1M | Reported complete | FFJJ CONST | 95 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ₱144.0M | 65% reported progress | ED1SON DEVELOPMENT & CONST INC | 7 | Check in |
| CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (RUBBER TESTING CENTER), STA. 0+000 - STA. 0+648, BARANGAY POBLACION, KABACAN, COTABATO | Region XII | ₱143.6M | 27% reported progress | ILBI CONST SUPPLY | 70 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TAGUM LIBUGANON RIVER, INCL. ROW, KAPALONG SECTION, DAVAO DEL NORTE | Region XI | ₱143.4M | Reported complete | ABU CONST | 0 | Check in |
| CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG TUGANAY RIVER, PACKAGE 2, CARMEN, DAVAO DEL NORTE | Region XI | ₱143.3M | 80% reported progress | WERR CORP INTERNATIONAL | 1 | Check in |
| CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG LASANA RIVER PROTECTING PANABO CITY COASTAL ROAD, CARMEN, DAVAO DEL NORTE | Region XI | ₱143.3M | 66% reported progress | WERR CORP INTERNATIONAL | 4 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG CATEEL RIVER (TINA SECTION, SAN RAFAEL) CATEEL, DAVAO ORIENTAL | Davao Oriental 1st DEO | ₱143.2M | 40% reported progress | R A PAHATI CONST | 50 | Check in |
| CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AT SADPUDON CREEK PHASE 3, CARMEN, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ₱142.6M | 41% reported progress | KANAWAY BUILDERS CORP | 4 | Check in |
| CONSTRUCTION OF REVETMENT PROTECTING SURIGAO DEL SUR BDRY-DAVAO OR. COASTAL RD., BARANGAY TOMOAONG TARRAGONA, DAVAO ORIENTAL | Davao Oriental 1st DEO | ₱142.6M | 18% reported progress | ROSBILL CONST AND SUPPLY | 29 | Check in |
| REHABILITATION OF REVETMENT ALONG DAVAO RIVER, BAYANIHAN ST. SECTION, BARANGAY MANDUG, DAVAO CITY | Davao City DEO | ₱142.4M | 90% reported progress | R A PAHATI CONST | 29 | Check in |
| CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG BUNAWAN RIVER PROTECTING DAANG MAHARLIKA (MN), DAVAO CITY | Region XI | ₱142.4M | 63% reported progress | RITCHE-NATHALIE BUILDERS & GEN MERCHANDISE | 16 | Check in |
| Construction of Flood Mitigation Structure in Barangay Laguitas, Malaybalay City, Bukidnon | CITY OF MALAYBALAY (CAPITAL) (BUKIDNON), BUKIDNON | ₱141.9M | Reported complete | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 44 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), DAVAO CITY | Region XI | ₱141.8M | 2% reported progress | ULTICON BUILDERS INC | 31 | Check in |
| REHABILITATION OF FLOOD CONTROL MITIGATION STRUCTURE AT BUNAWAN RIVER, BUNAWAN BRIDGE, DOWNSTREAM SECTION, DAVAO CITY | Region XI | ₱140.7M | 94% reported progress | VICENTE T LAO CONST | 17 | Check in |
| Construction of Flood Control Structure (with Esplanade) along Pulangi River, Brgy. Batangan, Package 2, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱140.6M | Reported complete | M MONTESCLAROS ENT INC | 24 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM - LIBUGANON RIVER, PACKAGE 2, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ₱140.4M | 51% reported progress | BJAM PRIME BUILDERS OPC | 14 | Check in |
| CONST. OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER PACKAGE 4, KALILANGAN, BUKIDNON | Region X | ₱139.9M | Reported complete | PYRAMID CONSOLIDATED BUILDERS & GEN MDSE | 39 | Check in |
| Construction of Flood Control Structure along Malatipay River, Kalilangan, Bukidnon, Package 1 | KALILANGAN (BUKIDNON), BUKIDNON | ₱139.6M | Reported complete | TKS BUILDERS & SUPPLIES | 39 | Check in |
| CONSTRUCTION OF REVETMENT WORKS ALONG PULANGI RIVER PHASE II, STA. 3+930 STA. 4+160, DATU MONTAWAL, MAGUINDANAO | Region XII | ₱138.7M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 71 | Check in |
| CONST./MAINT.OF FLOOD MITIGATION STRUCT. & DRAINAGE SYSTEMS,CDOC RIVER BASIN FC PROJ.,CDOC | Region X | ₱137.4M | Reported complete | ADFIL CORP | 100 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURES WITHIN MINDANAO RIVER BASIN (ALONG PULANGUI RIVER), DOWNSTREAM OF OLD BATANGAN BR., BRGY. BATANGAN SECTION, BUKIDNON | Region X | ₱137.2M | Reported complete | UKC BUILDERS INC | 21 | Check in |
| Construction of Flood Mitigation Structure within Mindanao River Basin (along Pulangui River) Package 1, Downstream of Old Batangan Br., Brgy. Batangan Section, Sta. 0+000.00 - Sta. 1+535.00, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱137.2M | Reported complete | M MONTESCLAROS ENT INC | 21 | Check in |
| CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AT SADPUDON CREEK PHASE 2, CARMEN, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ₱136.9M | 55% reported progress | KANAWAY BUILDERS CORP | 4 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TAGUM - LIBUGANON RIVER, DOWNSTREAM/UPSTREAM MIRANDA BRIDGE II INCLUDING ROW, TAGUM CITY, DAVAO DEL NORTE | Region XI | ₱136.7M | Reported complete | DREIRICH BUILDERS | 1 | Check in |
| CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO | Cotabato 3rd DEO | ₱136.3M | 77% reported progress | MUST ENT | 73 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE,BARANGAY PARADISE, CABANGLASAN, BUKIDNON, CABANGLASAN, BUKIDNON 2ND LD | Bukidnon 1st DEO | ₱135.1M | 87% reported progress | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 42 | Check in |
| Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon | CITY OF MALAYBALAY (CAPITAL) (BUKIDNON), BUKIDNON | ₱135.1M | Reported complete | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 35 | Check in |
| CONSTRUCTION OF BUNAWAN- VERUELA- SANTA JOSEFA ROAD (PHASE 8), AGUSAN DEL SUR | Region XIII | ₱135.1M | Reported complete | ULTICON BUILDERS INC | 73 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD(MAWI-I CREEK), PACKAGE 4, SAN FERNANDO, BUKIDNON | Region X | ₱133.9M | Reported complete | M MONTESCLAROS ENT INC | 33 | Check in |
| CONST. OF FLOOD CONTROL STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD (MAWI-I CREEK), PACKAGE 3, SAN FERNANDO, BUKIDNON | Region X | ₱133.8M | Reported complete | M MONTESCLAROS ENT INC | 33 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (UPSTREAM), VALENCIA CITY, BUKIDNON | Region X | ₱133.7M | 98% reported progress | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 16 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LALIGAN RIVER (UPSTREAM), VALENCIA CITY, BUKIDNON | Region X | ₱133.7M | Reported complete | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 22 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT ALONG TAGUM - LIBUGANON RIVER BASIN - PACKAGE 2, CARMEN, DAVAO DEL NORTE | Region XI | ₱131.9M | Reported complete | GP | 5 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCT. AND DRAINAGE SYSTEMS,TAGOLOAN FLOOD PROJ.(NATUMOLAN SECT), | Region X | ₱131.3M | Reported complete | EQUI-PARCO CONST CO | 100 | Check in |
| RECONST. OF DAMAGED FLOOD CONTROL DIKE ALONG CDO RIVER, CALA-CALA-TIBASAK-MACASANDIG,STA.6+764-STA.7 | Region X | ₱127.3M | Reported complete | EQUI-PARCO CONST CO | 97 | Check in |
| CLUSTER BUK1-02 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (KULAMAN BR.) MALAYBALAY CITY, BUKIDNON = PHP70,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL ... | Region X | ₱127.2M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST | 63 | Check in |
| CONSTRUCTION OF MLANG RIVER FLOOD CONTROL PROJECT (DOWNSTREAM OF MLANG BRIDGE, LEFT SIDE), BARANGAY POBLACION A, MLANG, COTABATO | Cotabato 3rd DEO | ₱127.1M | Reported complete | JARGON CONST | 85 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PROTECTING BAGNAN BRIDGE ALONG NRJ-CUMAWAS-TINUY-AN FALLS ROAD, BISLIG CITY, SURIGAO DEL SUR | Region XIII | ₱126.1M | 91% reported progress | ROCK DIWATA BUILDERS INC | 91 | Check in |
| Construction of Flood Control Structure along Alae River (Right Side), Package 4, Barangay Casinglot, Tagoloan, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱125.5M | Reported complete | ARCINUE COMM'L CORP / CROWNWORKS CONST INC | 97 | Check in |
| Construction of Flood Control Structure along Alae River (Right Side), Package 3, Barangay Casinglot, Tagoloan, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱125.5M | Reported complete | ARCINUE COMM'L CORP / CROWNWORKS CONST INC | 97 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Bukidnon 1st DEO | ₱125.5M | 61% reported progress | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 45 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 1), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Bukidnon 1st DEO | ₱125.5M | 41% reported progress | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 45 | Check in |
| CONSTRUCTION OF BUNAWAN- VERUELA ROAD (PHASE 3), BUNAWAN, AGUSAN DEL SUR | Region XIII | ₱125.2M | Reported complete | ULTICON BUILDERS INC | 91 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, SAN FERNANDO, BUKIDNON 2ND LD | Bukidnon 1st DEO | ₱125.1M | 63% reported progress | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 30 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD | Bukidnon 1st DEO | ₱124.5M | 65% reported progress | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 33 | Check in |
| CONSTRUCTION OF DRAINAGE SYSTEM, DIVISORIA, CAGAYAN DE ORO CITY | Region X | ₱123.5M | 79% reported progress | OLISON CORP | 99 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE 2), BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, BRGY. LAGUITAS, MALAYBALAY CITY, BUKIDNON | Bukidnon 1st DEO | ₱123.3M | 45% reported progress | JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST | 43 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN DE ORO CITY-DOMINOROG-CAMP KIBARITAN RD. (UPSTREAM AND DOWNSTREAM) OF PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Bukidnon 3rd DEO | ₱123.3M | 75% reported progress | VEN RAY CONST CORP | 64 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD, UPSTREAM OF UGUIABAN BRIDGE, TALAKAG, BUKIDNON | Region X | ₱123.2M | 50% reported progress | RAMISES CONST | 87 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD, DOWNSTREAM OF UGUIABAN BRIDGE, TALAKAG, BUKIDNON | Region X | ₱123.2M | 50% reported progress | RAMISES CONST | 86 | Check in |
| Construction of Flood Control Structure Protecting Bagnan Br. along NRJ-Cumawas-Tinuy-an Falls Road, Bislig City, Surigao del Sur | CITY OF BISLIG (SURIGAO DEL SUR), SURIGAO DEL SUR | ₱123.2M | Reported complete | ROCK DIWATA BUILDERS INC | 91 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT AT MATANAO RIVER ALONG MATANAO NHS LEFT SIDE DOWNSTREAM SECTION PHASE I, MATANAO, DAVAO DEL SUR | Davao del Sur DEO | ₱122.8M | 61% reported progress | TKS BUILDERS | 92 | Check in |
| Construction of Mala-Lawasaig River Flood Control with Steel Sheet Pile and Slope Protection, Brgy. Lilod Baclayan, Ditsaan-Ramain, Lanao del Sur | DITSAAN-RAMAIN (LANAO DEL SUR), LANAO DEL SUR | ₱121.7M | Reported complete | M M A ACHIEVER CONST & DEVELOPMENT CORP | 89 | Check in |
| CONSTRUCTION OF FLOOD CONTROL PROJECT, RIO GRANDE DE MINDANAO, DOWNSTREAM OF DATU SAHID PIANG BRIDGE, MIDSAYAP, COTABATO | Cotabato 1st DEO | ₱121.3M | 93% reported progress | LLABAN CONST & SUPPLY FORMERLY: LLABAN CON | 99 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG KAPALONG-TALAINGOD ROAD, (BATANGAN BRIDGE SECTION-RIGHT SIDE), VALENCIA CITY | Region X | ₱121.1M | Reported complete | EQUI-PARCO CONST CO | 24 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SINANGLANAN, MALAYBALAY CITY, BUKIDNON, BRGY. SINANGLANAN, MALAYBALAY CITY, BUKIDNON | Bukidnon 1st DEO | ₱120.6M | 93% reported progress | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 35 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER (LAPULABAO-MASALAM BRIDGE DOWNSTREAM SECTION) HAGONOY, DAVAO DEL SUR | Davao del Sur DEO | ₱120.0M | 57% reported progress | LEDCORE CONST AND DEVELOPMENT CORP | 92 | Check in |
| CONST. OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 7, MISAMIS ORIENTAL | Region X | ₱118.8M | Reported complete | EQUI-PARCO CONST CO | 97 | Check in |
| Construction of Flood Control Structure (with esplanade) along Pulangi River, Barangay Poblacion, Package 3, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱117.6M | Reported complete | M MONTESCLAROS ENT INC | 21 | Check in |
| CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT, DOWNSTREAM OF PAGALUNGAN BRIDGE, STA. 0+000-STA. 0+612, PIKIT, NORTH COTABATO | Region XII | ₱117.2M | Reported complete | ABU CONST | 85 | Check in |
| CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL, BRGY. DULANGAN (SECTION 2), DIGOS CITY, DAVAO DEL SUR | Region XI | ₱117.0M | 99% reported progress | VICENTE T LAO CONST | 77 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 6, OSMEÑA, COMPOSTELA, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱115.8M | Reported complete | R A PAHATI CONST | 30 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MANAT RIVER (UPSTREAM AND DOWNSTREAM L/S) LEADING TO AGUSAN RIVER PHASE 1, BANKERUHAN NORTE, MONTEVISTA, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱114.8M | 92% reported progress | METRO GEAR CONST CORP | 39 | Check in |
| Construction of Mala-Lawasaig River Flood Control with Street Pile and Slope Protection, Barangay Lilod Baclayan, Ditsaan-Ramain, Lanao del Sur | DITSAAN-RAMAIN (LANAO DEL SUR), LANAO DEL SUR | ₱114.6M | Reported complete | M M A ACHIEVER CONST & DEVELOPMENT CORP | 89 | Check in |
| Construction of Flood Control Structure (with esplanade) along Pulangi River, Brgy. Poblacion (Purok 17A), Package 2, Valencia City, Bukidnon | BUKIDNON | ₱114.6M | Reported complete | M MONTESCLAROS ENT INC | 24 | Check in |
| Rehabilitation of Flood Control Structure, Bitan-Ag Creek, Package 12, Sta. 0+000.00 - Sta. 0+226.00, Downstream Section, Cagayan de Oro City | CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱114.0M | Reported complete | VEN RAY CONST CORP | 100 | Check in |
| Rehabilitation of Flood Control Structure, Bitan-Ag Creek, Package 13, Sta. 0+226.00 - Sta. 0+456.70, Cagayan de Oro City | CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱114.0M | Reported complete | VEN RAY CONST CORP | 100 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LALIGAN RIVER (DOWNSTREAM), VALENCIA CITY, BUKIDNON | Region X | ₱113.4M | Reported complete | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 23 | Check in |
| RECONST. OF DAMAGED FLOOD CONTROL DIKE ALONG CDO RIVER,CALA-CALA-TIBASAK-MACASANDIG,STA.7+740-STA.8+ | Region X | ₱113.4M | Reported complete | ADFIL CORP | 97 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 5, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱113.0M | Reported complete | M MONTESCLAROS ENT INC | 27 | Check in |
| Construction of Flood Mitigation Structure, Barangay Mabuhay, San Fernando, Bukidnon | SAN FERNANDO (BUKIDNON), BUKIDNON | ₱112.9M | Reported complete | GENESIS88 CONST INC | 32 | Check in |
| Rehabilitation of Flood Control Structure, Kolambog Creek, Package 27, Sta. 0+000.00 - Sta. 0+787.562, Sta. 1+113.581 - Sta. 1+173.794, Lapasan, Cagayan de Oro City | CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱112.9M | Reported complete | JEJOR'S CONST CORP | 99 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (UPSTREAM), BRGY. ANGALAN, TUGBOK DISTRICT, DAVAO CITY | Region XI | ₱112.9M | 91% reported progress | RELY CONST | 38 | Check in |
| CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL, BRGY. DULANGAN (SECTION 1), DIGOS CITY, DAVAO DEL SUR | Region XI | ₱112.3M | 99% reported progress | VICENTE T LAO CONST | 77 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (DOWNSTREAM), VALENCIA CITY, BUKIDNON | Region X | ₱110.8M | 98% reported progress | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 16 | Check in |
| Construction of Flood Control Structure along Puerto Creek, Package 1, Cagayan de Oro City | CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱110.6M | Reported complete | OLISON CORP / MAMSAR CONST AND INDUSTRIAL CORP | 96 | Check in |
| Construction of Flood Control Structure, Pulangi River, Brgy. Nabundas Section, Pikit, North Cotabato | PIKIT (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO) | ₱109.7M | Reported complete | AGONG BUILDERS AND CONST SUPPLY INC / ABU CONST | 77 | Check in |
| Construction of Agusan River Flood Control, Barangay Poblacion, Veruela, Agusan del Sur | VERUELA (AGUSAN DEL SUR), AGUSAN DEL SUR | ₱106.1M | Reported complete | ROCK DIWATA BUILDERS INC / FFJJ CONST | 75 | Check in |
| Construction of Flood Control Structures along Solibao River Protecting Solibao Bridge, Rosario, Agusan del Sur | ROSARIO (AGUSAN DEL SUR), AGUSAN DEL SUR | ₱106.1M | Reported complete | CM TAN CONST | 75 | Check in |
| Construction of Flood Control Structure, Pulangi River, Downstream of Pagalungan Bridge, Pikit, North Cotabato | PIKIT (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO) | ₱105.2M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 98 | Check in |
| CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT PHASE II (BARANGAY NABUNDAS SECTION), STA 0+800 - STA 1+068, PIKIT, NORTH COTABATO | Region XII | ₱104.0M | 98% reported progress | DQMB CONST & SUPPLY CORP | 77 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 3, TAGOLOAN, MISAMIS ORIENTAL | Region X | ₱103.0M | Reported complete | EQUI-PARCO CONST CO | 100 | Check in |
| CONSTRUCTION OF REVETMENT ALONG AUNAN CREEK (BRIDGE SECTION UPSTREAM) TO AGUSAN RIVER PHASE II, BARANGAY BABAG, MONKAYO, DAVAO DE ORO | Davao de Oro 2nd DEO | ₱101.7M | Reported complete | L S D CONST | 39 | Check in |
| Construction of Flood Control Structure along Tigwa River, San Fernando, Bukidnon | SAN FERNANDO (BUKIDNON), BUKIDNON | ₱99.0M | Reported complete | M MONTESCLAROS ENT INC | 34 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUNAWAN RIVER, STA. 2+726- STA. 3+061, WEST SIDE, RIGHT BANK,DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | AGONG BUILDERS AND CONST SUPPLY INC | 17 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MATINA RIVER PROTECTING MATINA PANGI ROAD, STA. 7+200 TO STA. 7+500 LEFT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | 71% reported progress | GENESIS88 CONST INC | 36 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUNAWAN RIVER, STA. 3+091- STA. 3+456, WEST SIDE, LEFT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | GENESIS88 CONST INC | 16 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUNAWAN RIVER STA. 5 + 667 - STA. 6 + 017, EAST SIDE, LEFT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | AGONG BUILDERS AND CONST SUPPLY INC | 15 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUNAWAN RIVER STA. 5 + 610 - STA. 5 + 940, EAST SIDE, RIGHT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | GENESIS88 CONST INC | 15 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MATINA RIVER PROTECTING MATINA PANGI ROAD, STA. 7+500 TO STA. 7+800 LEFT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | 70% reported progress | AGONG BUILDERS AND CONST SUPPLY INC | 36 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUNAWAN RIVER, STA. 3+061 - STA. 3+401, WEST SIDE, RIGHT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | AGONG BUILDERS AND CONST SUPPLY INC | 16 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CATALUNAN PEQUEÑO CREEK, RIGHT BANK, TALOMO RIVER, DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | AGONG BUILDERS AND CONST SUPPLY INC | 33 | Check in |
| CONSTRUCTION OF REVETMENT ALONG BUNAWAN RIVER, STA. 3+651- STA. 3+951 WEST SIDE RIGHT BANK, DAVAO CITY | Davao City DEO | ₱99.0M | Reported complete | GENESIS88 CONST INC | 17 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PULANGI RIVER, BARANGAY NABUNDAS SECTION - PHASE II, STA. 001+500-STA. 001+755.5, PIKIT, COTABATO | Region XII | ₱98.1M | 98% reported progress | THREE W BUILDERS INC | 78 | Check in |
| CONSTRUCTION OF DRAINAGE STRUCTURE, SITIO DALSA, BRGY. POBLACION, LUPON, DAVAO ORIENTAL | Davao Oriental 2nd DEO | ₱97.5M | Reported complete | DREIRICH BUILDERS | 44 | Check in |
| CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ₱97.2M | 54% reported progress | MONOLITHIC CONST | 8 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT/DIKE AT BARANGAY RIZAL, BANSALAN, DAVAO DEL SUR | Davao del Sur DEO | ₱97.2M | 86% reported progress | AGONG BUILDERS AND CONST SUPPLY INC | 87 | Check in |
| CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ₱97.0M | 47% reported progress | MONOLITHIC CONST | 8 | Check in |
| Construction of Flood Control Structure with Esplanade along Valencia Bypass Road Extension, (Sugod Bridge Section), Package 1, Valencia City, Bukidnon | CITY OF VALENCIA (BUKIDNON), BUKIDNON | ₱96.9M | Reported complete | M MONTESCLAROS ENT INC | 27 | Check in |
| CONSTRUCTION OF REVETMENT ALONG TALOMO RIVER, STA. 5+215 - STA. 5+480, LEFT BANK, DAVAO CITY | Davao City DEO | ₱96.5M | 97% reported progress | GENESIS88 CONST INC | 39 | Check in |
| CONSTRUCTION OF FLOOD CONTROL DIKE OF SIMULAO RIVER (0+110--0+300 UPSTREAM) & (0+017-0+057 DOWNSTREAM), BUNAWAN, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | ₱96.5M | Reported complete | ADFIL CORP | 82 | Check in |
| Construction of Tubalan Flood Control Structure, Malita, Davao Occidental | MALITA (DAVAO OCCIDENTAL), DAVAO OCCIDENTAL | ₱96.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 93 | Check in |
| Construction of Flood Mitigation Structure,Barangay Bonacao, San Fernando, Bukidnon | SAN FERNANDO (BUKIDNON), BUKIDNON | ₱96.5M | Reported complete | ROSBILL CONST AND SUPPLY | 24 | Check in |
| Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge (Package 2), Tagoloan, Misamis Oriental | TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱96.5M | Reported complete | CAGALAWAN ENT / SISBRO CONST CORP FORMERLY: SISBRO CONST & SUPPLY | 98 | Check in |
| Construction of Flood Mitigation Structure, Sitio Panamucan, Brgy. San Jose, Malaybalay City, Bukidnon | CITY OF MALAYBALAY (CAPITAL) (BUKIDNON), BUKIDNON | ₱96.5M | Reported complete | ROSBILL CONST AND SUPPLY | 44 | Check in |
| CONSTRUCTION OF CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER, GUIHING HAGONOY, DAVAO DEL SUR | Davao del Sur DEO | ₱96.5M | Reported complete | FFJJ CONST | 84 | Check in |
| Construction of Flood Mitigation Facility - Davao City Div Rd, Laverna Section, Brgy. Buhangin, Davao City | DAVAO DEL SUR | ₱96.5M | Reported complete | RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 32 | Check in |
| Construction of Flood Mitigation Structure Along Cagayan de Oro River (Cabula Upstream Section 1), Cagayan de Oro City, Misamis Oriental | CAGAYAN DE ORO CITY (CAPITAL) (MISAMIS ORIENTAL), MISAMIS ORIENTAL | ₱96.5M | Reported complete | RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE | 93 | Check in |
| Construction of Flood Mitigation Structure, Padada-Mainit River (Tanwalang Section), Sulop, Davao del Sur | SULOP (DAVAO DEL SUR), DAVAO DEL SUR | ₱96.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 95 | Check in |
| Construction of Flood Mitigation Structure along Linabo Bridge, barangay Linabo, Malaybalay City, Bukidnon | CITY OF MALAYBALAY (CAPITAL) (BUKIDNON), BUKIDNON | ₱96.5M | Reported complete | ROSBILL CONST AND SUPPLY | 38 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAGALLANES RIVER (MAGALLANES BRIDGE UPSTREAM SECTION-PACKAGE A), MATANAO, DAVAO DEL SUR | Davao del Sur DEO | ₱96.5M | Reported complete | LEDCORE CONST AND DEVELOPMENT CORP | 91 | Check in |
| CONSTRUCTION OF REVETMENT - LASANG RIVER FLOOD CONTROL, LASANG SECTION, DAVAO CITY | Davao City DEO | ₱96.5M | Reported complete | RELY CONST | 13 | Check in |
| CONSTRUCTION OF REVETMENT ALONG KINGKING RIVER (KINGKING BRIDGE DOWNSTREAM), BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Davao de Oro 1st DEO | ₱96.5M | Reported complete | N C AGUILAR CONST & SUPPLY INC | 18 | Check in |
| Rehabilitation of Revetment along Davao River, Purok 6, Platinum St. San Rafael Village Section, Barangay 10-A, Davao City | DAVAO CITY (DAVAO DEL SUR), DAVAO DEL SUR | ₱96.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 32 | Check in |
| CONSTRUCTION OF DRAINAGE SYSTEM AT NHA BANGKAL, MATUTUM ST. TO OUTFALL, DAVAO CITY | Davao City DEO | ₱96.5M | Reported complete | VICENTE T LAO CONST | 39 | Check in |
| Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Matina Pangi Section, Right Bank) going to Matina River Outfall, Davao City | DAVAO CITY (DAVAO DEL SUR), DAVAO DEL SUR | ₱96.5M | Reported complete | GENESIS88 CONST INC | 36 | Check in |
| Construction of Flood Control Mitigation Structure at Panacan River, Davao City | DAVAO DEL SUR | ₱96.5M | Reported complete | GENESIS88 CONST INC / GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 23 | Check in |
| Construction of Flood Control Structure along Padada-Mainit River (Tanwalang-Upper Katipunan Section 1), Sulop, Davao del Sur | SULOP (DAVAO DEL SUR), DAVAO DEL SUR | ₱96.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 93 | Check in |