AB APONESTO CONST PARTS AND SUPPLY INC is listed as a company organization in Philippine public procurement records on this site, with 234 linked DPWH project(s) totaling about ₱10,978,551,076.51. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
AB APONESTO CONST PARTS AND SUPPLY INC
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 234
- Total value
- ₱10,978,551,076.51
- Published flags
- 0
- Region
- Davao de Oro 1st DEO · Region XI
Public Record Grade
A transparent, data-derived summary of reported public records for AB APONESTO CONST PARTS AND SUPPLY INC — not an accusation or finding of wrongdoing.
Score: 88.00 / 100 · Projects in sample: 234 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 75.4/100 · Weight: 45%
- graceDays
- 30
- componentScore
- 75.4
- lateCompletedProjects
- 31
- onTimeCompletedProjects
- 167
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 220
- pastTargetOngoingProjects
- 22
- undatedCompletedProjectsExcluded
- 14
- Termination rate
Component score: 100/100 · Weight: 20%
- totalProjects
- 234
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 20%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 234
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99/100 · Weight: 15%
- projects
- 234
- componentScore
- 99
- flagsPerProject
- 0.03
- publishedV2Flags
- 8
- COA audit observations (linked)
No data — weight redistributed
- projects
- 234
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
45 geotagged project(s) — Open full map
- CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP, MONKAYO ROAD, PACKAGE D, DAVAO DE ORO23L00191 · ₱192,000,823.40 · mapped
- ROAD OPENING OF MAWAB-MARAGUSAN-CARAGA ROAD, BRGY. TALIAN SECTION, COMPOSTELA VALLEY 1ST LD15L00097 · ₱185,843,224.31
- WIDENING (4 INTO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. CONST. OF PEDESTRIAN OVERPASS & RROW (BRGY.17L00038 · ₱184,098,613.33
- CONCRETING OF MONTEVISTA (JCT. MAYAON)-LAAK DIVERSION ROAD INCLUDING ROW, COMPOSTELA VALLEY18L00062 · ₱178,669,765.56 · mapped
- WIDENING (2-4 INTO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. RROW,(BRGY. SAN JOSE-BRGY. BANLAG SECT.),C17L00009 · ₱176,718,636.39 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY20L00001 · ₱167,774,102.81 · mapped
- WIDENING (2 INTO 4 LANES) OF MONTEVISTA-COMPOSTELA-MATI BDRY. RD. INCL. ROW(BRGY. OSMEÑA-BRGY. BANTC18L00031 · ₱155,963,998.33 · mapped
- WIDENING (4-6 LANES) OF DAANG MAHARLIKA (MN) INCLUDING RROW (BRGY. TAPIA-BRGY. BANKEROHAN NORTE SECT17L00028 · ₱153,556,640.03
- NABUNTURAN-MARAGUSAN ROAD INCLUDING ROW-K1450+567-K1450+810;K1453+061-K1453+312;K1456+315-K1457+581,18L00097 · ₱153,498,212.03 · mapped
- ROAD UPGRADING (GRAVEL TO CONCRETE) OF MONTEVISTA-DNAS RD (BRGY. CAMANSI-BRGY. PROSPERIDAD SECT.),CO17L00112 · ₱151,929,603.02 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I24LI0040 · ₱144,749,965.80 · mapped
- CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP ROAD, PAPCKAGE E, DAVAO DE ORO23LI0080 · ₱144,749,222.63 · mapped
- CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 1, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO24LI0043 · ₱144,749,196.21 · mapped
- CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 2, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO24LI0042 · ₱144,746,625.01 · mapped
- CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO25LI0068 · ₱144,701,157.64 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO25LI0009 · ₱144,648,784.94 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO25LI0075 · ₱144,614,749.34 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO25LI0074 · ₱144,606,278.85 · mapped
- ROAD UPGRADING (GRAVEL TO CONCRETE) OF NABUNTURAN-MARAGUSAN RD,KATIPUNAN-CAMBAGANG SECT.,COMPOSTELA15L00030 · ₱142,340,905.28
- ROAD UPGRADING (GRAVEL TO CONCRETE) OF NABUNTURAN-MARAGUSAN RD, CAMBAGANG SECT.,COMPOSTELA VALLEY K115L00031 · ₱140,275,154.91
- ROAD UPGRADING (GRAVEL TO CONCRETE) OF MONTEVISTA-DNAS RD (BRGY. CANIDKID-BRGY. CAMANSI SECT.),COMPO17L00111 · ₱140,184,038.50 · mapped
- CONSTRUCTION OF CONCRETE ROAD-MONKAYO-BOSTON ROAD (BOSTON SECTION) PACKAGE 1, DAVAO ORIENTAL19L00071 · ₱132,279,720.98 · mapped
- WIDENING (4-6 LANES) OF DAANG MAHARLIKA (MN) INCLUDING (RROW) (BRGY. BANLAG-BRGY. OLAYCON SECT.),COM17L00010 · ₱119,058,774.98 · mapped
- WIDENING OF DAANG MAHARLIKA (MN),BANLAG-OLAYCON SECT., COMPOSTELA VALLEY, INCLUDING ROAD RIGHT-OF-WA15L00041 · ₱117,792,869.70 · mapped
- RECONSTRUCTION OF CONCRETE PAVEMENT ON SPECIFIC LOCATIONS ALONG DAANG MAHARLIKA (MN),(S00126MN),COMP19L00078 · ₱111,535,197.74 · mapped
- ROAD WIDENING - PANABO CITY BYPASS ROAD, PACKAGE C, DAVAO DEL NORTE23L00040 · ₱100,280,831.42 · mapped
- CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO21L00002 · ₱99,094,169.88 · mapped
- CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO22L00037 · ₱97,581,216.31 · mapped
- CONSTRUCTION OF REVETMENT WITH STEEL SHEET PILE AT AGUSAN RIVER ALONG MONTEVISTA -COMPOSTELA (DOWNSTREAM), COMPOSTELA, COMPOSTELA VALLEY PROVINCE18LA0128 · ₱96,499,993.32 · mapped
- Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro23LI0060 · ₱96,499,992.30 · mapped
- OFF- CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY (S00133MN) - K1418+418 - K 1426+02323LI0086 · ₱96,499,983.21 · mapped
- CONSTRUCTION OF REVETMENT ALONG NABOC RIVER LEADING TO AGUSAN RIVER, BRGY. NABOC, MONKAYO, DAVAO DE ORO21LA0101 · ₱96,499,943.44 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE B.E. DUJALI, DAVAO DEL NORTE23L00069 · ₱96,499,899.81 · mapped
- CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER AT INAMBATAN BRIDGE (DOWNSTREAM), BARANGAY OLAYCON, MONKAYO, DAVAO DE ORO24LI0081 · ₱96,499,893.48 · mapped
- CONCRETING OF ROAD FROM PUROK 5A POBLACION, MONKAYO TO SITIO MAITE, BARANGAY SALVACION, MONKAYO, DAVAO DE ORO23LI0117 · ₱96,499,848.47 · mapped
- Construction of Flood Control Structure along Aguibawa Creek, Compostela, Davao de Oro23LI0033 · ₱96,499,753.59 · mapped
- ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG MONTEVISTA - COMPOSTELA - MATI BDRY RD (S00135MN), DAVAO DE ORO21LA0109 · ₱96,497,063.13 · mapped
- CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, BRGY. FATIMA, NEW BATAAN, DAVAO DE ORO21LA0161 · ₱96,494,965.00 · mapped
- CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, BRGY. BANLAG, MONKAYO, DAVAO DE ORO21LA0067 · ₱96,494,742.57 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AT SPECIFIC LOCATIONS ALONG DAANG MAHARLIKA (MN) (S00126MN), COMPOSTELA VALLEY PROVINCE20LA0078 · ₱96,488,222.15 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (MANAT RIVER JUNCTION), POBLACION, MONKAYO, DAVAO DE ORO PHASE 124LI0015 · ₱96,486,361.82 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAOAO CREEK LEADING TO AGUSAN RIVER AT PUROK 4A TO PUROK 2, PHASE 2, POBLACION MONKAYO, DAVAO DE ORO24LI0110 · ₱96,258,600.72 · mapped
- CONSTRUCTION OF ROAD, JNH LINOAN TO BARANGAY SAN VICENTE - BARANGAY SAN ISIDRO, MONTEVISTA, DAVAO DE ORO24LI0066 · ₱96,258,276.72 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TUGANAY RIVER, DUJALI, DAVAO DEL NORTE23L00068 · ₱95,767,299.97 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY -JCT. MANIKLING-GOVERNOR GENEROSO RD- K1748+ 400- K1749 + 73525LG0034 · ₱95,518,733.30 · mapped
- PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY-PRES. DIOSDADO P. MACAPAGAL NATL HI-WAY-K1745+281-K1746+299,K1748+122-K1748+50025LG0033 · ₱95,518,695.36 · mapped
- CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO23L00028 · ₱95,509,216.52 · mapped
- CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 2, COMPOSTELA, DAVAO DE ORO23L00029 · ₱95,505,035.64 · mapped
- CONSTRUCTION OF CONCRETE ROAD: BRGY.POBLACION-SANTOS BAYBAY,BANAYBANAY, DAVAO ORIENTAL24LG0065 · ₱95,341,903.16 · mapped
- CUT-OFF/CONSTRUCTION OF REVETMENT AT UPPER AGUSAN RIVER, OSMEÑA SECTION, COMPOSTELA, COMPOSTELA VALLEY PROVINCE18LA0082 · ₱94,569,968.70 · mapped
