CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO
CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO is a DPWH-tracked public work in Region XI, Region XI. Reported contract value: ₱95,509,216.52. Status: Past target date (DPWH On-Going). Contractor on record: AB APONESTO CONST PARTS AND SUPPLY INC 22998. Figures trace to dpwh.
Total Contract Cost
