Construction of Revetment23LI0060

Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro

Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro is a DPWH-tracked public work in COMPOSTELA (DAVAO DE ORO), DAVAO DE ORO, Region XI. Reported contract value: ₱96,499,992.30. Status: Reported complete (DPWH). Contractor on record: AB APONESTO CONST PARTS AND SUPPLY INC. Figures trace to sumbong.

COMPOSTELA (DAVAO DE ORO), DAVAO DE ORO, Region XI
Region: Region XI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23LI0060 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-09-10 → 2025-07-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Davao de Oro

Based on the coordinates published with the DPWH record and NOAH file Compostella Valley.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Tagum - Libuganon River, Talomo, Sto. Tomas, Davao del Norte (Phase 1)
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Davao de Oro 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱96,499,992.30

Progress

Reported complete (DPWH)

Start Date

March 28, 2023

Target End

December 7, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.