ULTICON BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 546 linked DPWH project(s) totaling about ₱133,226,771,630.01. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ULTICON BUILDERS INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 546
- Total value
- ₱133,226,771,630.01
- Published flags
- 0
- Region
- Region X · Region X
Licensed officers (PCAB)
- Carlos Miguel L. Gonzalez · Authorized Managing Officer (PCAB license 17267) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ULTICON BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 71.70 / 100 · Projects in sample: 546 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 47.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 47.7
- lateCompletedProjects
- 91
- onTimeCompletedProjects
- 272
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 514
- pastTargetOngoingProjects
- 151
- undatedCompletedProjectsExcluded
- 28
- Termination rate
Component score: 98.4/100 · Weight: 24%
- totalProjects
- 546
- componentScore
- 98.4
- terminatedProjects
- 3
- terminationRatePct
- 0.5
- Cost overruns vs approved budget (ABC)
Component score: 98.9/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 98.9
- projectsWithAbcAndCost
- 544
- projectsOver110PctOfAbc
- 3
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 546
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 546
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 520 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- DAVAO CITY BYPASS CONSTRUCTION PROJECT, PACKAGE I-1, STA. 12+800 TO STA. 23+500, DAVAO CITY18Z00004 · ₱13,230,000,000.00
- DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+70021Z00008 · ₱9,711,021,596.71 · mapped
- DAVAO CITY BYPASS CONSTRUCTION PROJECT (DCBCP) PACKAGE I-2, STA. 0+000 TO STA. 12+800, FUNDED UNDER JICA LOAN AGREEMENT NO. PH-27321Z00007 · ₱9,109,964,205.23
- CONSTRUCTION OF CONCRETE BRIDGE - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), PACKAGE 1, DAVAO CITY22L00004 · ₱2,041,419,050.77 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE - TALOMO - MATINA BRIDGE ALONG DAVAO CITY COASTAL BYPASS ROAD, DAVAO CITY21L00041 · ₱1,747,730,781.43 · mapped
- DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY23L00066 · ₱989,121,662.39 · mapped
- DAVAO CITY COASTAL BYPASS ROAD AT JCT. DAVAO-COTABATO ROAD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AVENUE-STA. ANA WHARF-R. CASTILLO (BAGO APLAYA-TIMES BEACH) INCL. ROW, DAVAO CITY18L00194 · ₱895,348,998.64 · mapped
- DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), PACKAGE 5, DAVAO CITY24L00121 · ₱815,467,777.88 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 5B, DAVAO CITY20L00155 · ₱809,998,442.54 · mapped
- DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), PACKAGE 6, DAVAO CITY24L00122 · ₱719,767,777.88 · mapped
- DAVAO CITY COASTAL BYPASS RD AT JCT. DAVAO-COTABATO RD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AVENUE18L00108 · ₱627,076,990.63 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE AT STA. ANA SECTION (SUBSTRUCTURE ONLY) - DAVAO CITY COASTAL BYPASS ROAD, DAVAO CITY21L00153 · ₱620,999,993.36 · mapped
- CLUSTER 2: 2.1 CONSTRUCTION OF MISSING LINKS, COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAMPAGUITA-MAKILOS (AGUSAN DEL SUR/BUKIDNON BOUNDARY) PACKAGE 7, AGUSAN DEL SUR 2.2 CONSTRUCTION OF MISSING LINK18N00054 · ₱578,999,813.33 · mapped
- BUKIDNON-COMPOSTELA VALLEY RD (BRGY. NAMNAM,SAN FERNANDO,BUKIDNON-LAAK, COMPOSTELA VALLEY), PACKAGES18L00163 · ₱559,614,270.96 · mapped
- CLUSTER 21 CONSTRUCTION OF MISSING LINKS/ NEW ROADS, BUKIDNON18K00225 · ₱555,609,571.83 · mapped
- CLUSTER 22 CONST. OF MISSING LINKS/ NEW ROADS, BUKIDNON18K00226 · ₱550,992,963.43 · mapped
- CLUSTER 16 CONSTRUCTION OF MISSING LINKS/ NEW ROADS, BUKIDNON18K00220 · ₱550,718,337.32 · mapped
- MARAGUSAN-PANTUKAN ROAD (PANTUKAN SECTION),PACKAGE A & B, INCLUDING ROW, COMPOSTELA VALLEY,A)CONST./18L00160 · ₱549,908,718.49 · mapped
- ALTERNATE RD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION RD-CATALUNAN GRANDE-TALANDAG-SUMI18L00157 · ₱544,899,981.59 · mapped
- TAGUM CITY FLYOVER ALONG AGUSAN-DAVAO ROAD, PACKAGE 1, DAVAO DEL NORTE18L00128 · ₱528,195,586.55 · mapped
- CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE) PACKAGE 21, DAVAO CITY20L00158 · ₱492,053,401.66 · mapped
- PRE-FIXED PREVENTIVE MAINTENANCE (PM),ROAD UPGRADING & PRESERVATION PROJECT(RUPP) UNDER JAPAN INT'L.17L00221 · ₱484,814,792.67 · mapped
- CONSTRUCTION OF FLYOVER-TAGUM CITY FLYOVER ALONG AGUSAN-DAVAO ROAD, PACKAGE 2, DAVAO DEL NORTE19L00110 · ₱482,493,880.89 · mapped
- CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 20, DAVAO CITY20L00157 · ₱482,374,847.33 · mapped
- DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), STA. ANA WHARF - R. CASTILLO SEGMENT, PACKAGE 1, DAVAO CITY22L00192 · ₱475,170,777.88 · mapped
- CONSTRUCTION OF TAGUM CITY FLYOVER ALONG AGUSAN-DAVAO ROAD, PACKAGE 1, DAVAO DEL NORTE18L00179 · ₱468,171,957.33 · mapped
- TAGUM CITY FLYOVER ALONG AGUSAN-DAVAO ROAD, PACKAGE 2, DAVAO DEL NORTE18L00153 · ₱462,863,042.81 · mapped
- CONCRETING OF POBLACION SAWATA-PATEL PROVINCIAL ROAD, SAN ISIDRO/KAPALONG, DAVAO DEL NORTE 1ST LD17L00180 · ₱461,893,760.55
- CLUSTER 10 CONST. OF MISSING LINKS/ NEW ROADS, BUKIDNON18K00207 · ₱459,123,912.77 · mapped
- CONST. OF GRAVEL ROAD-BUKIDNON-COMPOSTELA VALLEY ROAD (BRGY. NAMNAM,SAN FERNANDO,BUKIDNON-LAAK, COMP18L00182 · ₱445,732,693.08 · mapped
- ISLAND GARDEN CITY OF SAMAL (IGACOS) CIRCUMFERENTIAL ROAD, (WEST SIDE) PACKAGE 2, DAVAO DEL NORTE18L00130 · ₱434,250,000.00 · mapped
- ISLAND GARDEN CITY OF SAMAL(IGACOS) CIRCUMFERENTIAL ROAD,(WEST SIDE), PACKAGE 1, DAVAO DEL NORTE18L00129 · ₱433,922,731.80 · mapped
- CLUSTER 13 CONST. OF MISSING LINKS/ NEW ROADS, BUKIDNON18K00217 · ₱428,793,575.82 · mapped
- CONC./WIDENING (2 INTO 4 LANES)/RECONST. OF BUHANGIN-TIGATTO-MANDUG-CALLAWA-FATIMA RD BYPASS,PACKAGE18L00044 · ₱415,374,217.17 · mapped
- CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 24, DAVAO CITY20L00161 · ₱413,737,541.00 · mapped
- CLUSTER 8 CONST. OF BYPASS/ DIVERSION/ WIDENING OF ROADS, BUKIDNON18K00205 · ₱413,270,913.85 · mapped
- CLUSTER 15 CONSTRUCTION OF MISSING LINKS/ NEW ROADS, BUKIDNON18K00219 · ₱411,320,541.98 · mapped
- CONSTRUCTION OF DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 31, DAVAO CITY21L00160 · ₱398,731,860.59 · mapped
- CONST./IMPVT. OF TAGUM CITY BYPASS RD (CANOCOTAN-SAN MIGUEL-PAGSABANGAN),INCLUDING RROW, TAGUM CITY,17L00173 · ₱397,832,133.68
- CLUSTER 4 - 4.1 CONSTRUCTION OF MISSING LINKS, COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAMPAGUITA-MAKILOS (AGUSAN DEL SUR/BUKIDNON BOUNDARY), PACKAGE 13, AGUSAN DEL SUR, 4.2 CONSTRUCTION OF MISSING18N00076 · ₱385,999,762.23 · mapped
- CONST./OPENING OF MAWAB-MARAGUSAN-CARAGA RD. INCL. RROW, SITIO DANGILAS SECT., DAVAO ORIENTAL 1ST LD17L00120 · ₱383,999,995.56
- DAVAO CITY COASTAL BYPASS RD AT JCT. DAVAO-COTABATO RD.-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AVE.-18L00107 · ₱382,762,672.64 · mapped
- CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 25, DAVAO CITY20L00162 · ₱380,670,779.56 · mapped
- MAWAB-MARAGUSAN-CARAGA ROAD,PACKAGES A & B, INCL. ROW, DAVAO ORIENTAL,A)MAWAB-MARAGUSAN-CARAGA RD.,18L00159 · ₱378,382,321.34 · mapped
- CONC. OF NABUNTURAN-NEW BATAAN DIV. ROAD,PACKAGES A & B, COMPOSTLEA VALLEY, A)CONC. OF NABUNTURAN-NE18L00155 · ₱374,999,684.16 · mapped
- CONSTRUCTION OF PATEL-KAPATAGAN ROAD PACKAGE 4, DAVAO DEL NORTE18L00145 · ₱373,906,699.98 · mapped
- CLUSTER 12 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS, BUKIDNON18K00209 · ₱373,320,387.92 · mapped
- ROAD OPENING OF MAWAB-MARAGUSAN-CARAGA ROAD INCLUDING BRIDGE, SITIO BANGLAS SECTION, DAVAO ORIENTAL15L00118 · ₱373,239,166.20 · mapped
- CONST./IMPVT. OF PATEL-KAPATAGAN RD,MUN. OF LORETO BDRY.,KAPALONG,DAVAO DEL NORTE 1ST LD (PACKAGE 1)17L00184 · ₱373,064,480.19
- CONST./UPGRADING (GRAVEL TO CONCRETE) OF MAWAB-MARAGUSAN-CARAGA RD INCL. RROW, BRGY. NEW LEYTE-BRGY.17L00053 · ₱371,557,484.17 · mapped
Equipment & capacity
PCAB license
- License no.
- 17267
- Category
- AAAA · Large B
- Minimum net worth for this category
- ₱1,000,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Dec 17, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 17267); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
14 evaluations listed across 7 GPPB CPES releases; average final rating 92.8% over 3 rated projects; 14 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 25, 2025 | DPWH | 96,500,000.000 (₱ thousands, as printed; flagged) | Completed | 92.0% | 93.6% | 40th, p. 311 |
| Mar 24, 2025 | DPWH | ₱228,697,777.00 | On-going | 98.5% | — | 39th (rev), p. 216 |
| Mar 19, 2025 | DPWH | ₱293,187,382.00 | On-going | 94.4% | — | 40th, p. 311 |
| Mar 19, 2025 | DPWH | ₱95,815,328.00 | Completed | 94.6% | 94.6% | 39th (rev), p. 216 |
| Nov 26, 2024 | DPWH (JV) | 3,230,000.000 (₱ thousands, as printed; flagged) | On-going | 92.0% | — | 39th (rev), p. 196 |
| Nov 5, 2024 | DPWH | ₱96,667,777.00 | On-going | 92.7% | — | 39th (rev), p. 216 |
| Nov 4, 2024 | PPA (JV) | ₱902,091,195.00 | Completed | 87.7% | 90.3% | 39th (rev), p. 130 |
| Nov 4, 2024 | DPWH | ₱98,782,426.00 | On-going | 94.4% | — | 39th (rev), p. 216 |
| Aug 19, 2024 | DPWH | ₱228,757,778.00 | On-going | 97.3% | — | 38th, p. 247 |
| Apr 24, 2024 | DPWH (JV) | ₱974,197,778.00 | On-going | 89.5% | — | 38th, p. 259 |
| Nov 29, 2023 | DPWH | ₱86,898,778.00 | On-going | 93.0% | — | 37th, p. 112 |
| Aug 25, 2023 | DPWH | ₱132,447,778.00 | On-going | 91.9% | — | 36th, p. 215 |
Showing the 12 most recent of 14.
2 amounts flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 579 awards · ₱104,295,126,713.99
- City of Malaybalay Infrastructure: 1 award · ₱406,105,777.88
- DPWH Goods & services: 1 award · ₱9,493,777.88
- 25N00239₱342,267,777.88· 2025-11-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XIII (CARAG
- 25N00235₱293,364,644.55· 2025-11-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XIII (CARAG
- 25N00234₱342,307,777.88· 2025-11-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XIII (CARAG
- 25L00098 ROA, NOA, Contract & Notice to Proceed₱200,777,777.88· 2025-10-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XI
- 25L00101 ROA, NOA, Contract & Notice to Proceed₱141,827,777.88· 2025-09-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XI
- 25K00179
- 25K00389
- 25K00406
- 25K00223
- 25L00112 ROA, NOA, Contract & Notice to Proceed
- 25K00417
- 25L00099 ROA, NOA, Contract & Notice to Proceed₱141,045,114.00· 2025-05-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XI
- 25L00129 ROA, NOA, Contract & Notice to Proceed
- 25K00415
- 25K00418
- 25K00416
- 25K00394
- 25L00051 ROA, NOA, Contract & Notice to Proceed
- 25K00168
- 25K00203
- 25K00234
- 25K00306
- 25N00123 RE-AD₱119,157,777.88· 2025-03-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XIII (CARAG
- 25K00172
- 25K00169
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →