MUST ENT is listed as a company organization in Philippine public procurement records on this site, with 109 linked DPWH project(s) totaling about ₱5,000,808,624.33. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
MUST ENT
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 109
- Total value
- ₱5,000,808,624.33
- Published flags
- 0
- Region
- Region XII · Region XII
Licensed officers (PCAB)
- Taukan Z. Mato · Authorized Managing Officer (PCAB license 13336) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MUST ENT — not an accusation or finding of wrongdoing.
Score: 75.90 / 100 · Projects in sample: 109 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 57.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 57.6
- lateCompletedProjects
- 29
- onTimeCompletedProjects
- 54
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 101
- pastTargetOngoingProjects
- 18
- undatedCompletedProjectsExcluded
- 7
- Termination rate
Component score: 97.2/100 · Weight: 24%
- totalProjects
- 109
- componentScore
- 97.2
- terminatedProjects
- 1
- terminationRatePct
- 0.9
- Cost overruns vs approved budget (ABC)
Component score: 98.2/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 98.2
- projectsWithAbcAndCost
- 109
- projectsOver110PctOfAbc
- 1
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 109
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 109
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 101 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM)21Z00018 · ₱214,959,897.10 · mapped
- WIDENING OF BRIDGE-LUN MASLA BR (B01047MN)ALONG SARANGANI-DAVAO DEL SUR COASTAL RD, MALAPATAN, SARANGANI22M00055 · ₱170,148,257.86 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-COTABATO CITY EAST DIVERSION ROAD, K1851+735-K1855+911.60; K1855+922.2-K1856+751.30, SULTAN KUDARAT, MAGUINDANAO21M00038 · ₱148,522,650.86 · mapped
- ROAD WIDENING - BANISILAN-GUILING-ALAMADA-LIBUNGAN RD - K1682+314- K1686+066, ALAMADA, COTABATO24M00002 · ₱145,644,101.88 · mapped
- WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO24M00006 · ₱136,983,286.64 · mapped
- CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO25MI0034 · ₱136,347,292.91 · mapped
- RECONSTRUCTION OF COTABATO -LANAO NATIONAL ROAD WITH LINE CANAL (PARANG SECTION), K1883+680-K1884+467.264; K1884+491.036-K1886+830, PARANG, MAGUINDANAO.20M00017 · ₱120,010,182.65 · mapped
- ROAD WIDENING-DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.) K1618+083-K1618+317, K1618+556-K1620+112, K1620+152-K1621+922, K1631+037-K1632+000, KIDAPAWAN CITY, NORTH COTABATO18M00002 · ₱108,708,125.25 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA. 0+000 STA. 0+238, PIGCAWAYAN, COTABATO23M00004 · ₱106,150,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR23M00030 · ₱101,294,021.74 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, UPSTREAM OF TACUPAN BRIDGE, TACUPAN, CARMEN, COTABATO24MI0061 · ₱96,451,707.24 · mapped
- WIDENING OF COTABATO - DAVAO ROAD, SULTAN KUDARAT SECTION, SULTAN KUDARAT, MAGUINDANAO19MA0084 · ₱96,392,791.79 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BRGY. ULAMIAN - BODEGA DEL PARAISO RESORT - SITIO TINAGO LEADING TO TINAGO FALLS, BRGY. ULAMIAN, LIBUNGAN, NORTH COTABATO23MD0036 · ₱96,150,799.13 · mapped
- WIDENING OF COTABATO-LANAO ROAD, SULTAN MASTURA SECTION, SULTAN MASTURA, MAGUINDANAO19MA0085 · ₱96,108,707.51 · mapped
- ROAD WIDENING OF COTABATO-LANAO ROAD, K1878+800 - K1880+340, PARANG, MAGUINDANAO PROVINCE23M00168 · ₱92,639,990.03 · mapped
- ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO23M00169 · ₱92,639,811.36 · mapped
- WIDENING OF DAVAO-COTABATO ROAD (PANATAN-PIGCALAGAN-RASANGAN SECTION), SULTAN KUDARAT, MAGUINDANAO17M00059 · ₱84,308,513.73 · mapped
- ROAD WIDENING - BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA, COTABATO18MD0082 · ₱82,127,033.66 · mapped
- Construction of River Bank Protection (Revetment) at Esteros River-Upstream, Phase III, Cotabato City22M00025 · ₱81,974,860.79 · mapped
- CONSTRUCTION OF BRIDGE AT RARADANGAN TO MACABASA, ALAMADA, NORTH COTABATO22M00087 · ₱77,197,767.49 · mapped
- CONCRETING/IMPROVEMENT OF NARRA - KATIDTUAN ROAD (PHASE II), BARANGAY NARRA, STA. 0+500.00-STA. 2 +500.00, SULTAN KUDARAT, MAGUINDANAO21M00092 · ₱76,427,254.92 · mapped
- WIDENING OF COTABATO-LANAO ROAD, PARANG SECTION, PARANG, MAGUINDANAO19MA0082 · ₱74,818,296.48 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1666 + 620 - K1666 + 766, ARAKAN, COTABATO24MC0011 · ₱72,375,000.00 · mapped
- PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1891+736 - K1893+047, MATANOG, MAGUINDANAO23M00093 · ₱69,895,915.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL SIMUAY BRIDGE, ALONG COTABATO-LANAO NATIONAL ROAD, SULTAN MASTURA, MAGUINDANAO20MA0057 · ₱69,185,107.78 · mapped
- WIDENING OF COTABATO-LANAO ROAD (NITUAN-MACASANDAG SECTION), PARANG, MAGUINDANAO17M00058 · ₱68,715,539.27 · mapped
- WIDENING OF COTABATO-LANAO RD (SIMUAY-NITUAN SECT.), SULTAN MASTURA, MAGUINDANAO17M00057 · ₱68,705,417.69 · mapped
- CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN), ESPERANZA, SULTAN KUDARAT21MH0026 · ₱67,549,996.19 · mapped
- CONSTRUCTION OF REVETMENT ALONG BUAL RIVER, STA 0+000-STA0+303.7, BARANGAY MINAPAN, TULUNAN, NORTH COTABATO23M00154 · ₱67,247,997.50 · mapped
- CONSTRUCTION OF PULANGI RIVER BANK PROTECTION (DOWNSTREAM OF CARMEN BRIDGE RIGHT BANK) PHASE I, STA. 0+000 - STA 0+179.64, BARANGAY UGALINGAN, CARMEN, COTABATO23M00159 · ₱67,231,226.56 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, BARANGAY SALIMBAO (PHASE II), STA. 0+000 - STA. 0+340, SULTAN KUDARAT, MAGUINDANAO DEL NORTE24M00234 · ₱66,536,690.34 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, PHASE I, BARANGAY SALIMBAO, STA. 0+000 - STA. 0+350, SULTAN KUDARAT, MAGUINDANAO DEL NORTE24M00235 · ₱66,536,683.93 · mapped
- CONSTRUCTION OF NEW BRIDGE - NEW MARANTAO BR. ALONG MAHARLIKA HIGHWAY (COTABATO-LANAO ROAD), STA K1895 + 044.48 - K1895 + 084.48, MATANOG, MAGUINDANAO DEL NORTE25M00115 · ₱62,578,134.83
- ROAD WIDENING ALONG MIDSAYAP-MAKAR ROAD, KADIGASAN, MIDSAYAP, COTABATO20MD0013 · ₱60,318,290.00 · mapped
- ROAD WIDENING - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, K1656+987 - K1658+680, ANTIPAS, NORTH COTABATO23M00015 · ₱57,899,889.04 · mapped
- CONCRETING OF ROAD FROM KIARING PROPER TO SITIO TUBPONG, STA. 0+000-STA.1+7145, BRGY. KIARING, BANISILAN, COTABATO24M00084 · ₱56,849,937.84 · mapped
- CONSTRUCTION OF ROAD, LADIA & PINARING, STA 0+000 - STA 1+992, SULTAN KUDARAT, MAGUINDANAO23M00100 · ₱49,500,000.00 · mapped
- ROAD WIDENING - BANISILAN-GUILING-ALAMADA-LIBUNGAN RD, GUILING, ALAMADA, NORTH COTABATO23MD0023 · ₱48,978,416.54 · mapped
- WIDENING OF COTABATO - LANAO ROAD WITH EXCEPTION (KM 1854+902-KM1905+988.40), SULTAN KUDARAT, MAGUINDANAO20MA0024 · ₱48,949,704.14 · mapped
- CONCRETING OF COTABATO - LANAO ROAD (SULTAN MASTURA & PARANG SECTION, KM 1869+850-KM1875+000), PARANG, MAGUINDANAO20MA0021 · ₱48,949,514.53 · mapped
- Construction of Flood Control Structure, Libungan River (Nalin Section-Phase V), Nalin, Midsayap, Cotabato22MD0057 · ₱48,949,154.29 · mapped
- WIDENING OF DAVAO - COTABATO ROAD WITH EXCEPTION (KM 1716+050-KM1724+803.20), SULTAN KUDARAT, MAGUINDANAO20MA0025 · ₱48,948,945.06 · mapped
- CONSTRUCTION OF SIMUAY FLOOD CONTROL (RIVER BANK PROTECTION WITH REVETMENT) STA. 0+00-STA.0+940, STA. 1+440-STA. 2+460, MACAGUILING, SULTAN KUDARAT, MAGUINDANAO20MA0051 · ₱48,939,058.23 · mapped
- ROAD WIDENING ALONG MATALAM-MLANG-BAGONTAPAY JCT RD - K1648+700 - K1650+55322MI0092 · ₱48,447,942.31 · mapped
- CONSTRUCTION OF CONCRETE ROAD, BRGY. ULAMIAN - BODEGA DEL PARAISO RESORT - SITIO TINAGO LEADING TO TINAGO FALLS, BRGY. ULAMIAN, LIBUNGAN, NORTH COTABATO22MD0075 · ₱48,200,000.00 · mapped
- CONSTRUCTION OF PIGCALANGAN-TODOK PALAO ROAD, BRGY. PIGCALANGAN, SULTAN KUDARAT, MAGUINDANAO20MA0118 · ₱48,198,855.26 · mapped
- CONSTRUCTION OF FLOOD CONTROL (ALA RIVER), ESPERANZA, SULTAN KUDARAT ESPERANZA, SULTAN KUDARAT20MH0019 · ₱47,505,500.00 · mapped
- DREDGING OF RIO GRANDE DE MINDANAO (UPSTREAM OF DELTA BRIDGE). COTABATO CITY16MA0106 · ₱47,109,445.13
- SLOPE PROTECTION WORKS ALONG MIDSAYAP-MAKAR RD (OLANDANG SECT), MIDSAYAP, COTABATO17MD0061 · ₱44,125,909.13 · mapped
- CONSTRUCTION OF CONCRETE ROAD - TUKA-BAI SARIPINANG ROAD IN BAGUMBAYAN SK IN SUPPORT OF AGRI-BASED INDUSTRIES: PINEAPPLE, COFFEE, RUBBER, CORN AND MUSCOVADO PROCESSING PLANT, STA. 12+514 - STA. 13+897, BAGUMBAYAN, SULTAN KUDARAT25M00185 · ₱42,602,000.00
Equipment & capacity
PCAB license
- License no.
- 13336
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Aug 29, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 13336); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 7 GPPB CPES releases; average final rating 89.5% over 3 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 4, 2025 | DPWH | ₱29,300,000.00 | On-going | 96.1% | — | 40th, p. 217 |
| Nov 6, 2024 | DPWH | ₱33,995,808.00 | On-going | 83.0% | — | 39th (rev), p. 147 |
| Apr 21, 2024 | DPWH (JV) | ₱96,499,840.00 | Completed | 94.7% | 93.3% | 38th, p. 170 |
| Apr 18, 2024 | DPWH | ₱96,150,799.00 | Completed | 79.4% | 88.5% | 38th, p. 170 |
| Dec 1, 2023 | DPWH | ₱96,150,799.00 | On-going | 94.5% | — | 37th, p. 73 |
| Sep 6, 2023 | DPWH | ₱101,964,956.00 | On-going | 85.6% | — | 36th, p. 143 |
| Jun 22, 2023 | DPWH | ₱34,151,999.00 | Final | 83.5% | 86.9% | 36th, p. 143 |
| Oct 6, 2022 | DPWH | ₱48,447,942.00 | On-going | 96.7% | — | 35th, p. 117 |
| Oct 6, 2022 | DPWH | ₱48,949,154.00 | On-going | 91.7% | — | 35th, p. 117 |
| Jul 7, 2022 | DPWH | ₱34,151,999.00 | On-going | 88.8% | — | 34th, p. 59 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →