CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, PHASE I, BARANGAY SALIMBAO, STA. 0+000 - STA. 0+350, SULTAN KUDARAT, MAGUINDANAO DEL NORTE
CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, PHASE I, BARANGAY SALIMBAO, STA. 0+000 - STA. 0+350, SULTAN KUDARAT, MAGUINDANAO DEL NORTE is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱66,536,683.93. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: MUST ENT. Figures trace to dpwh.
Total Contract Cost