CONSTRUCTION OF SIMUAY FLOOD CONTROL (RIVER BANK PROTECTION WITH REVETMENT) STA. 0+00-STA.0+940, STA. 1+440-STA. 2+460, MACAGUILING, SULTAN KUDARAT, MAGUINDANAO
CONSTRUCTION OF SIMUAY FLOOD CONTROL (RIVER BANK PROTECTION WITH REVETMENT) STA. 0+00-STA.0+940, STA. 1+440-STA. 2+460, MACAGUILING, SULTAN KUDARAT, MAGUINDANAO is a DPWH-tracked public work in Cotabato City DEO, Region XII. Reported contract value: ₱48,939,058.23. Status: Reported complete (DPWH). Contractor on record: MUST ENT. Figures trace to dpwh.
Total Contract Cost
