DPWH projects in Cotabato City

500 DPWH public works projects are recorded in Cotabato City (Region Xii), with start dates from 2016 to 2020. Recorded contract values total about ₱7,579,064,616.63. 499 are recorded at 100% progress and 51 are flood control works. Figures are as recorded by DPWH; they are not findings.

Largest recorded projects

  1. Widening of Cotabato - Davao Road, Sultan Kudarat Section, Sultan Kudarat, Maguindanao₱96,392,791.79
  2. Widening of Cotabato-Lanao Road, Sultan Mastura Section, Sultan Mastura, Maguindanao₱96,108,707.51
  3. Widening of Cotabato-Allah-Marbel Road, Datu Odin Sinsuat Section, Datu Odin Sinsuat, Maguindanao₱95,736,569.89
  4. Reconstruction of Midsayap-Dulawan-Makar Road With Slope Protection Phase I, Datu Piang, Maguindanao₱86,833,771.73
  5. Reconstruction of Midsayap-Dulawan-Makar Road With Slope Protection Phase Iii, Datu Salibo, Maguindanao₱86,797,068.77
  6. Reconstruction of Midsayap-Dulawan-Makar Road With Slope Protection Phase V, Datu Salibo, Maguindanao₱86,789,875.36
  7. Construction of Revetment/ Steel Pile Along Tamontaka River, Brgy. Tamontaka 4, Cotabato City₱76,609,254.28
  8. Widening of Cotabato-Lanao Road, Parang Section, Parang, Maguindanao₱74,818,296.48
  9. Construction of Standard 4-Storey 20 Cl School Building at Ccnhs Datu Sema Kalantungan Site₱71,742,227.27
  10. Construction of Standard 4-Storey 20 Cl School Building Stand Alone Shs Tamontaka Mother, Cotabato City₱71,732,232.96
  11. Construction of Flood Control Simuay Bridge, Along Cotabato-Lanao National Road, Sultan Mastura, Maguindanao₱69,185,107.78
  12. Proposed 2 Units, 4 Storey, 20 Classroom at Tamontaka Mother (Stand Alone Shs), Cotabato City₱66,364,285.86
  13. Reconstruction of Midsayap-Dulawan-Makar Road With Slope Protection Phase Ii, Datu Piang, Maguindanao₱62,705,012.09
  14. Reconstruction of Midsayap-Dulawan-Makar Road With Slope Protection Phase Iv, Datu Salibo, Maguindanao₱62,687,704.96
  15. Road Construction / Concreting Taviran-Ganta-Gambar Road, Pagalungan-Gambar-Katidtuan Section Mother Kabuntalan, Maguindanao₱56,482,717.78
  16. Widening of Permanent Bridge Bubong Br. (Bo1475mn) Along Cotabato City Circumferential Road (Western Section), Cotabato City₱54,408,303.27
  17. Widening of Marbel-Ala-Cotabato Road With Exception (Km1821+108.41-Km1847+478.09)₱48,993,216.31
  18. Construction of Riverbank Protection (Revetment) Along Tamontaka River, (Neogen River to Kinagatan River Section - Phase Iv), Kalanganan Ii, Cotabato City₱48,979,264.50
  19. Construction of Riverbank Protection (Revetment) Along Tamontaka River, (Neogen River to Kinagatan River Section - Phase V), Kalanganan Ii, Cotabato City₱48,979,063.73
  20. Reconstruction of Awang-Upi-Lebak Road With Exception (Km 1845+215-Km1882+362)₱48,969,968.25
  21. Widening of Awang-Upi-Lebak Road (Km 1845+215-Km 1882+362), North Upi, Maguindanao₱48,960,362.69
  22. Widening of Cotabato - Lanao Road With Exception (Km 1854+902-Km1905+988.40), Sultan Kudarat, Maguindanao₱48,949,704.14
  23. Concreting of Cotabato - Lanao Road (Sultan Mastura & Parang Section, Km 1869+850-Km1875+000), Parang, Maguindanao₱48,949,514.53
  24. Widening of Davao - Cotabato Road With Exception (Km 1716+050-Km1724+803.20), Sultan Kudarat, Maguindanao₱48,948,945.06
  25. Widening of Simuay-Landasan-Parang Road With Exception (Km 1865+553.40-Km1878+7442), Parang, Maguindanao₱48,948,826.80