ABU CONST is listed as a company organization in Philippine public procurement records on this site, with 240 linked DPWH project(s) totaling about ₱15,473,898,187.20. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ABU CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 240
- Total value
- ₱15,473,898,187.20
- Published flags
- 1
- Region
- Region XII · Region XII
Licensed officers (PCAB)
- Arturo B. Uy · Authorized Managing Officer (PCAB license 22313) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ABU CONST — not an accusation or finding of wrongdoing.
Score: 81.80 / 100 · Projects in sample: 240 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 63.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 63.9
- lateCompletedProjects
- 49
- onTimeCompletedProjects
- 146
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 231
- pastTargetOngoingProjects
- 36
- undatedCompletedProjectsExcluded
- 9
- Termination rate
Component score: 97.5/100 · Weight: 21%
- totalProjects
- 240
- componentScore
- 97.5
- terminatedProjects
- 2
- terminationRatePct
- 0.8
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 240
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 240
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 240
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 229 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF CONCRETE ROAD - PANACAN BYPASS ROAD, DAVAO CITY21L00100 · ₱312,367,014.64 · mapped
- 1. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA24M00159 · ₱277,068,415.40 · mapped
- PAVING OF UNPAVED ROADS SURALLAH LAKE SEBU MAITUM ROAD, CHAINAGE 3100 CHAINAGE 5340, LAKE SEBU, SOUTH COTABATO18M00059 · ₱193,000,000.00 · mapped
- PAVING OF UNPAVED ROADS SURALLAH LAKE SEBU MAITUM ROAD, CHAINAGE 840 CHAINAGE 3100, LAKE SEBU, SOUTH COTABATO18M00058 · ₱192,922,561.85 · mapped
- PAVING OF UNPAVED ROADS SURALLAH LAKE SEBU MAITUM ROAD, CHAINAGE 10424 CHAINAGE 14969, LAKE SEBU, SOUTH COTABATO18M00057 · ₱192,612,862.52 · mapped
- ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE24M00009 · ₱192,349,995.74 · mapped
- ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE24M00008 · ₱191,877,358.98 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAVAO-COTABATO RD. (MATINA CROSSING SECTION)-MATINA APLAYA RD.-JCT. TULIP DRIVE (DAVAO-COTABATO RD.)-ECOLAND DRIVE-JCT. ABC-CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), (PHASE 1) DAVAO CITY20L00138 · ₱187,788,988.70 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - DAVAO CITY DIV RD -K1512+428 - K1512+547, K1512+688 - K1512+73022LB0423 · ₱173,700,000.00 · mapped
- CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL25LF0145 · ₱146,711,761.52 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, K0000+000.000 - K0000+900.000,K0001+000.000 - K0002+160.000, K0002+220.000 - K0004+945.6, K0001+354.039 - K0002+160.000, K0002+220.00 - K0003+540.000, PACKAGE D, LUTAYAN, SULT24M00018 · ₱145,264,179.61 · mapped
- MATINA CROSSING RD. (JCT. DAVAO - COTABATO RD. - JCT. DAVAO CITY DIVERSION RD.), DAVAO CITY20LB0198 · ₱144,750,000.00 · mapped
- : PAVING OF UNPAVED ROADS- SNA-LEBAK-KALAMANSIG RD- K1877+058-K1879+070, K1879+769-K1880+145, KALAMANSIG, SULTAN KUDARAT19M00030 · ₱144,750,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD TUPI-SARANGANI ROAD (MALANDAG-MIASONG ROAD, PACKAGE B, MALANDAG, SARANGANI18M00018 · ₱144,747,014.74 · mapped
- CONSTRUCTION OF CONCRETE ROAD TUPI-SARANGANI ROAD (MALANDAG-MIASONG ROAD, PACKAGE A, MALANDAG, SARANGANI18M00017 · ₱144,746,711.51 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF SURALLAH-LAKE SEBU-MAITUM ROAD, CHAINAGE 4400-CHAINAGE 5640, LAKE SEBU, SOUTH COTABATO17M00064 · ₱144,727,117.41
- ROAD UPGRADING (UNPAVED TO PAVED) OF SURALLAH-LAKE SEBU-MAITUM ROAD, CHAINAGE 8620 - CHAINAGE 9380, CHAINAGE 10380 - CHAINAGE 13220, LAKE SEBU, SOUTH COTABATO17M00066 · ₱144,713,222.31
- ROAD UPGRADING (UNPAVED TO PAVED) OF SURALLAH-LAKE SEBU-MAITUM ROAD, CHAINAGE 0 - CHAINAGE 2020, LAKE SEBU, SOUTH COTABATO17M00062 · ₱144,711,966.55
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-PULANGI BANK PROTECTION, RIGHT & LEFT BANK OF TUNGGOL FLOODWAY, PACKAGE B-PHASE 1, STA. 3+689-STA. 3+93019M00036 · ₱144,695,950.52 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, TINALON SECTION, SNA, SULTAN KUDARAT, K1870+651 TO K1872+794, ( CHAINAGE 23651 TO CHAINAGE 25794), K1872+803-K1873+200 ( CHAINAGE 25803 - CHAINAGE 26200)17M00012 · ₱144,663,605.18 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, TINALON SECTION, SNA, SULTAN KUDARAT, K1868+352 TO K1870+651, (CHAINAGE 21351 TO CHAINAGE 23651)17M00011 · ₱144,593,744.42 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TAGUM LIBUGANON RIVER, INCL. ROW, KAPALONG SECTION, DAVAO DEL NORTE18L00192 · ₱143,405,879.07 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. R MAGSAYSAY AVE. - L.MA. GUERRERO ST. - GUZMAN ST. - VINZON ST. - T. PALMA GIL ST. - JCT. DACUDAO - JCT. J.P. CABAGUIO AVE., DAVAO CITY20L00148 · ₱142,361,354.41 · mapped
- CONSTRUCTION OF CONCRETE ROAD - MATANAO - KIBLAWAN - PADADA ROAD, PACKAGE I, DAVAO DEL SUR23L00080 · ₱137,925,402.75 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. DAVAO-COTABATO ROAD - SAMPAGUITA ST. (IWHA) - JCT. DAVAO - COTABATO OLD ROAD, BARANGAY DUMOY AND BARANGAY BALIOK, DAVAO CITY21L00150 · ₱136,132,973.01 · mapped
- WIDENING (4-5 INTO 6 LANES) OF DAVAO CITY DIV. RD INCL. SLOPE PROTECTION & RROW (BRGY. MA-A-BRGY. MA17L00104 · ₱133,995,143.69
- ROAD WIDENING MIDSAYAP-MAKAR ROAD, K1702+633-K1708+887, MIDSAYAP, NORTH COTABATO18M00032 · ₱131,559,189.01 · mapped
- WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI17M00016 · ₱129,011,155.73 · mapped
- WIDENING (2 INTO 4 LANES) OF HIJO BRIDGE (B00209MN) INCL. APPROACHES & RROW ALONG SURIGAO-DAVAO COAS17L00121 · ₱123,630,425.15
- REPLACEMENT OF MATINA APLAYA BRIDGE 3, DAVAO CITY20LB0310 · ₱122,313,761.09 · mapped
- CONSTRUCTION OF SONGSONGON BRIDGE INCL. ROW17G00104 · ₱121,975,934.87 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE AWANG- UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K1925+058-K1925+148, K1925+226-K1925+272; K1966+350-K1966+368, K1966+400-K1966+416; K1966+700-K1966+714, K1966+900-K1966+914, K1967+500-K1967+508, K19618M00025 · ₱120,941,394.50 · mapped
- PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO24M00181 · ₱117,527,850.18 · mapped
- CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT, DOWNSTREAM OF PAGALUNGAN BRIDGE, STA. 0+000-STA. 0+612, PIKIT, NORTH COTABATO24M00061 · ₱117,233,923.08 · mapped
- ROAD WIDENING DAVAO COTABATO RD (JCT. DIGOS-COTABATO SECT) K1667+200-K1669+000, K1684+800-K1686+800, ALEOSAN, NORTH COTABATO22M00001 · ₱111,938,983.12 · mapped
- CONSTRUCTION OF BYPASS/DIVERSION ROADS - BANGA - TUPI - MALUNGON ROAD, (BANGA-TUPI SECTION), PACKAGE D, STA. 27+509-STA 29+009, BANGA,,SOUTH COTABATO.20M00033 · ₱111,378,938.95 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG PALIMBANG-SARANGANI ROAD, K1968+200 - K1968+215, K1971+840 - K1971+860, K1978+530 - K1978+595, K1978+770 -22M00079 · ₱106,149,990.80 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) SURALLAH-LAKE SEBU-MAITUM ROAD BETWEEN KOLONBONG BRIDGE AND DATAL LAWA BRIDGE, LAKE SEBU, SOUTH COTABATO19M00039 · ₱105,583,812.39 · mapped
- PAVING OF UNPAVED ROAD MAITUM-LAKE SEBU ROAD, K1784+180-K1786+425, K1768+352-K1768+507, MAITUM, SARANGANI18M00009 · ₱104,331,146.34 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BANGA TUPI-MALUNGON ROAD, (BANGA-TUPI SECTION), STA. 26+209 TO STA. 27+089, PACKAGE A, BANGA, SOUTH COTABATO19M00017 · ₱101,324,582.02 · mapped
- PAVING OF UNPAVED ROADS SNA-LEBAK-KALAMANSIG ROAD K1903+404-K1904+690, K1904+721-K1905+185, SULTAN KUDARAT18M00030 · ₱100,536,477.39 · mapped
- ROAD WIDENING INCLUDING DRAINAGE ALONG SARANGANI- SULTAN KUDARAT COASTAL RD, K1701+420 - K1701+540, K1702+720-K1706+922.35, MAASIM, SARANGANI20M00076 · ₱98,999,999.26 · mapped
- CONSTRUCTION OF CONCRETE ROAD, JCT. NHW (COTABATO-MARBEL ROAD) - KOLAMBOG - DUMAGUIL BYPASS ROAD, STA. 0+000-STA 4+000, NORALA, SOUTH COTABATO21M00028 · ₱98,410,946.13 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-BANGA-TUPI-MALUNGON ROAD, (MALUNGON-TUPI SECTION), PACKAGE A, MALUNGON, SARANGANI19M00010 · ₱98,162,038.18 · mapped
- CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL25LF0135 · ₱97,812,292.56 · mapped
- Construction of Flood Control Structure along Buayan River (Maindang Section), Lutayan, Sultan Kudarat23MF0043 · ₱97,730,411.86 · mapped
- Construction of Flood Control Structure along Buayan River (Sampao Section), Lutayan, Sultan Kudarat23MF0042 · ₱97,656,143.98 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, BRGY. NEW PANAY, STO. NIÑO, SOUTH COTABATO18M00052 · ₱97,569,174.17 · mapped
- CONSTRUCTION OF CONCRETE ROAD - SUBEN -MANGELEN-MANGILALA-ESTRELLA-PANANGGILAN ROAD IN SUPPORT OF FISHING AND ALLIED INDUSTRIES IN LAKE BULUAN (LUTAYAN PORTION) EXTENDING SUPPORT TO MUSCOVADO21M00031 · ₱97,308,892.17 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - DAVAO CITY DIV RD - K1509+933 - K1510+07822LB0275 · ₱96,500,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 22313
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Dec 20, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 22313); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
28 evaluations listed across 7 GPPB CPES releases; average final rating 90.6% over 8 rated projects; 25 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 2, 2025 | DPWH | ₱145,264,179.00 | Completed | 93.8% | 87.4% | 40th, p. 16 |
| Jun 5, 2025 | DPWH | ₱192,349,996.00 | On-going | 88.6% | — | 40th, p. 16 |
| Mar 17, 2025 | DPWH | ₱117,527,850.00 | On-going | 85.5% | — | 39th (rev), p. 14 |
| Nov 12, 2024 | DPWH | ₱145,264,179.00 | On-going | 83.1% | — | 39th (rev), p. 14 |
| Aug 1, 2024 | DPWH | ₱95,539,193.00 | On-going | 84.5% | — | 38th, p. 12 |
| Jul 29, 2024 | DPWH (JV) | ₱83,418,658.00 | Completed | — | — | 38th, p. 12 |
| Apr 24, 2024 | DPWH (JV) | ₱201,177,065.00 | Completed | 91.5% | 93.4% | 38th, p. 12 |
| Apr 23, 2024 | DPWH (JV) | ₱115,799,965.00 | On-going | 90.1% | — | 38th, p. 116 |
| Apr 16, 2024 | DPWH | ₱97,656,144.00 | Completed | 91.4% | 87.6% | 38th, p. 12 |
| Apr 16, 2024 | DPWH | ₱97,730,412.00 | Completed | 88.9% | 93.5% | 38th, p. 12 |
| Nov 30, 2023 | DPWH (JV) | ₱93,604,596.00 | On-going | 89.2% | — | 37th, p. 6 |
| Nov 28, 2023 | DPWH | ₱97,656,144.00 | On-going | 85.1% | — | 37th, p. 5 |
Showing the 12 most recent of 28.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →