CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT, DOWNSTREAM OF PAGALUNGAN BRIDGE, STA. 0+000-STA. 0+612, PIKIT, NORTH COTABATO
CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT, DOWNSTREAM OF PAGALUNGAN BRIDGE, STA. 0+000-STA. 0+612, PIKIT, NORTH COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱117,233,923.08. Status: Reported complete (DPWH). Contractor on record: ABU CONST. Figures trace to dpwh.
Total Contract Cost
