CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (UPSTREAM), BRGY. ANGALAN, TUGBOK DISTRICT, DAVAO CITY

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (UPSTREAM), BRGY. ANGALAN, TUGBOK DISTRICT, DAVAO CITY is a DPWH-tracked public work in Region XI, Region XI. Reported contract value: ₱112,889,344.63. Status: Past target date (DPWH On-Going). Contractor on record: RELY CONST. Figures trace to dpwh.

Region XI, Region XI
Region: Region XI

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22L00033 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    91% reported · imagery 2020-05-26 → 2025-11-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Davao del Sur

Based on the coordinates published with the DPWH record and NOAH file DavaoDelSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (UPSTREAM), BRGY. ANGALAN, TUGBOK DISTRICT, DAVAO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

4. Implementation

Contract Amount

₱112,889,344.63

Progress

Past target date (DPWH On-Going)

Start Date

April 8, 2022

Target End

September 6, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.