NORTHERN BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 431 linked DPWH project(s) totaling about ₱38,312,769,711.89. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
NORTHERN BUILDERS
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 431
- Total value
- ₱38,312,769,711.89
- Published flags
- 3
- Region
- Tarlac DEO · Region III
Online presence
Google Maps: Northern Builders Construction Corporation★ 4.4 (36 reviews)Google Maps, 2026-10-22
Kiometer 131, Carlos P. Romulo Highway, Barangay Baras-Baras, Tarlac City, Tarlac, Tarlac City, Tarlac
Licensed officers (PCAB)
- Victor Manguerra Angeles · Authorized Managing Officer (PCAB license 08789) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for NORTHERN BUILDERS — not an accusation or finding of wrongdoing.
Score: 90.80 / 100 · Projects in sample: 431 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 81.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 81.7
- lateCompletedProjects
- 43
- onTimeCompletedProjects
- 351
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 425
- pastTargetOngoingProjects
- 31
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 431
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 431
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 431
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 431
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 375 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (VALENZUELA MADICAL VILLAGE), BARANGAY PASO DE BLAS, VALENZUELA CITY22OD0260 · ₱572,039,851.38 · mapped
- CLUSTER 46 CONST. OF BYPASS AND DIVERSION ROADS/ CONST. OF MISSING LINKS/NEW ROADS IN BUK & MIS OR18K00246 · ₱471,641,048.43 · mapped
- PROPOSED WIDENING OF FORT BONIFACIO-NICHOLS FIELD ROAD (LAWTON AVENUE) PROJECT, PHASE II, FORT BONIFACIO, TAGUIG CITY18O00001 · ₱447,473,635.66 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ACCESS ROAD FROM LITERON - ANTOL IN CALBIGA TO CANLOBO - LAYO - MAGDAWAT - PELAON OF PINABACDAO TO MABINI IN BASEY CONNECTING ...SAMAR 2ND21I00056 · ₱443,895,949.05 · mapped
- WIDENING OF FORT BONIFACIO-NICHOLS FIELD ROAD (LAWTON AVENUE) PROJECT PHASE I, REVISED PLAN, TAGUIG CITY17O00002 · ₱441,819,384.94 · mapped
- CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL18K00245 · ₱440,011,814.49 · mapped
- CLUSTER 29 ROAD WIDENING & PAVING OF UNPAVED ROADS IN BUKIDNON18K00230 · ₱388,024,030.37 · mapped
- CONSTRUCTION /REPAIR/REHAB./ IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS LOCAL ROADS AND BRIDGES- LOCAL ROADS CONSTRUCTION OF ACCESS ROAD LEADING TO KALIWA DAMSITE (MARCOS HIGHWAY TO QUEBOROSA), BARANGAY MAGSAYSAY, INFANTA, QUEZON18D00057 · ₱385,326,953.70 · mapped
- CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, C-6, NAPINDAN-M.L. QUEZON AVENUE, TAGUIG17O00004 · ₱335,855,702.14
- CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGA18C00054 · ₱309,643,187.71 · mapped
- CLUSTER 40 CONST. OF MISSING LINKS/NEW ROADS IN BUKIDNON18K00240 · ₱303,822,037.71 · mapped
- CONST./OPENING OF ROAD, BRGY. LOKILOKON (PARANAS)-LAWAAN-CONCEPCION-CANLIGUES-PACO-CALAPI-HINACA-AN-CARANAS-BABACLAYON-HIDUROMA-HILUMOT-SAN JOSE DE BUAN-CANAPONTE-SAN NICOLAS-SITIO SALVACION-AGUINGAYAN-GUSA,SAMAR 2ND,KO017+360-KO035+020, PARANAS, W. SAMAR16I00075 · ₱299,116,941.76
- CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 2), ANGELES-PORAC, PAMPANGA18C00055 · ₱298,519,086.62 · mapped
- CLUSTER 48 CONST. OF BYPASS AND DIVERSION ROADS IN CAGAYAN DE ORO CITY18K00248 · ₱291,001,604.38 · mapped
- CONSTRUCTION OF KALAYAAN HOSPITAL PHASE 2, KAWIT, CAVITE23D00155 · ₱289,498,721.44 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD, INCLUDING SLOPE PROTECTION, TARLAC 3RD LEGISLATIVE DISTRICT, PROVINCE OF TARLAC18C00018 · ₱289,485,477.81 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF BAUANG-SAN FERNANDO-SAN JUAN BYPASS ROAD (BAUANG SECTION), INCL. ROW AND BRIDGE, LA UNION18A00094 · ₱289,140,568.48 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS, PAVEMENT MARKINGS AND SOLAR STUDS ON DAANG MAHARLIKA (AGUSAN-DAVAO ROAD) (AMPAYON-ANTONGALON-TALIGAMAN-DE ORO-TABON-TABON SECTION), BUTUAN CITY, AGUSAN DEL NORTE23N00076 · ₱287,863,037.22 · mapped
- FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJA16C00034 · ₱284,171,467.28 · mapped
- LOCAL PROGRAM-LOCAL ROADS AND BRIDGES, LOCAL ROADS ONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS IMPROVEMENT/ WIDENING OF KALAYAAN ROAD INCLUDING DRAINAGE, BATONG DALIG, KAWIT, CAVITE21D00018 · ₱279,813,493.21 · mapped
- CLUSTER 41 CONST. OF BYPASS AND DIVERSION ROADS IN BUKIDNON18K00241 · ₱274,073,561.81 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR24IK0079 · ₱270,527,306.14 · mapped
- CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL, SECONDARY ROADS, PANGASINAN- NUEVA VIZCAYA ROAD, INCL. BRIDGE AND ROW, PANGASINAN 6TH LD16A00113 · ₱259,456,260.03 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA24C00415 · ₱254,144,059.63 · mapped
- Construction of Slope Protection Structure along Porac River, Brgy. Pio, Porac, Pampanga22C00028 · ₱241,250,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD, TARLAC SECTION (PACKAGE 1) , PROVINCE OF TARLAC20C00030 · ₱241,250,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LAPAZ (BRIDGE CONSTRUCTION) LEADING TO AND IN SUPPORT OF BAGOONG AND PATIS AND OTHER AQUATIC RESOURCES, ILOCOS NORTE18A00096 · ₱241,249,762.44 · mapped
- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BASEY-MARABUT-PINAMITINAN RD (S00124SM)- K0914+000-K0915+000, K0936+000-K0937+000, K0939+000-K0940+000, K0940+000-K0941+000, K0946+000-K0947+000, K0947+000-K0948+000, K0948+000-K0948+87523IK0109 · ₱238,837,327.12 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS , CDO - AIRPORT - BUKIDNON RD, K1440 + 900 - K1441 + 263, K1442 + 968 - 1443 + 171, K1444 + 000 - K1444 + 958, K1459 + 440 - K1460 + 000, K1462 + 800 - K1464 + 000, K1465 + 662 - K1466 + 262, (WITH EXCEPTION)23K00196 · ₱234,002,034.61 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS, CLARK-BAMBAN-CAPAS ACCESS ROAD LEADING TO CLARK CITY, INCLUDING BRIDGE, TARLAC 3RD L.D., PROV. OF TARLAC17C00033 · ₱233,926,555.27 · mapped
- FY 2020 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS / NEW ROADSSANGLEY AIRPORT ACCESS ROAD, CAVITE20D00018 · ₱233,533,931.09 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADSSANGLEY AIRPORT ACCESS ROAD, PACKAGE D, CAVITE23D00063 · ₱208,920,819.30 · mapped
- CONSTRUCTION OF 2-LANE ROADS ALONG LAGUNA LAKE HIGHWAY (C-6 ROAD) BRGY. LOWER BICUTAN TO BRGY. BICUTAN TAGUIG CITY20O00031 · ₱206,481,636.03 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADSSANGLEY AIRPORT ACCESS ROAD, PACKAGE C, CAVITE23D00037 · ₱196,489,967.14 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) - K0690+000 - K0690+565, K0684+750 - K0686+525, K0692+315 - K0693+17324I00021 · ₱194,614,482.46 · mapped
- Flood Control Works - Construction of Guagua Pasac River23C00054 · ₱193,000,000.00 · mapped
- CONSTRUCTION OF CONVENTION CENTER, BUTUAN CITY, AGUSAN DEL NORTE24N00112 · ₱192,998,483.79 · mapped
- FY 2021 DPWH INFRASTRUCTURE PROGRAM LOCAL PROGRAMBUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM CONSTRUCTION OF HOSPITAL BUILDING, KALAYAAN HOSPITAL, KAWIT, CAVITE21D00015 · ₱192,957,549.31 · mapped
- CONSTRUCTION OF LAYAC DIVERSION CHANNEL, BATAAN, HERMOSA AND DINALUPIHAN, BATAAN16C00019 · ₱192,672,905.77 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS, PAVEMENT MARKINGS AND SOLAR STUDS ON NRJ BCIR-CAPITOL-BONBON ROAD IN SUPPORT OF PROPOSED BUTUAN CITY IT PARK AND PUBLIC UTILITY TRANSPORT TERMINAL, BUTUAN CITY, AGUSAN DEL NORTE23N00077 · ₱192,143,259.34 · mapped
- REHAB./IMPRVT. OF RD,BRGY. LOKILOKON (PARANAS)-LAWAAN-CONCEPCION-CANLIGUES-PACO-CALAPI-HINACA-AN-CARANAS-BABACLAYON-HIDUROMA-HILUMOT-SAN JOSE DE BUAN- CANAPONTE-SAN NICOLAS-SITIO SALVACION-AGUINGAYAN-GUSA,(KO000+340-KO017+360), PARANAS, WESTERN SAMAR16I00076 · ₱190,081,175.63
- CONVERGENCE & SPECIAL SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRIDGES FR. THE NAT'L. RDS. LEAD. TO MAJ./STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF CANDABA-BALIWAG ROAD (PASIG SECT.), CANDABA, PAMPANGA25C00529 · ₱189,127,389.12
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MANGATAREM-STA CRUZ ROAD, PACKAGE 5, INCL. ROW, PANGASINAN18A00093 · ₱187,997,858.57 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MANGATAREM-STA CRUZ ROAD, PACKAGE 4, INCL. ROW, PANGASINAN18A00092 · ₱187,997,424.16 · mapped
- CONST'N/MAINTENANCE OF FLD. MITIGATION STRUCTURE AND DRAINAGE SYSTEMS CAGAYAN RIVER FLD. MNGT. PROJECTS - CATAGGAMAN, TUGUEGARAO CITY, SPURDIKES EXTENSION, CAGAYAN 3RD LD, STA 000+000 TO STA 000+71416B00045 · ₱186,874,397.86
- CONST. OF BYPASS AND DIVERSION ROADS- EASTERN INTERIOR BYPASS ROAD (GUSA PUERTO/JCT. SAYRE HIGHWAY), PACKAGE 17, CAGAYAN DE ORO CITY24K00229 · ₱184,767,958.59 · mapped
- CLUSTER 13- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG LANGOGAN-ROXAS ROAD SECTION, KO100+310-KO100+440.00; KO101+120-KO101+202.90; KO104+060-KO104+160; KO104+560-KO104+704.10, PALAWAN20E00107 · ₱182,386,542.15 · mapped
- FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS SANGLEY AIRPORT ACCESS ROAD, CAVITE21D00069 · ₱178,500,203.14 · mapped
- CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE24N00185 · ₱178,159,918.27 · mapped
- CLUSTER 1: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS, OCCIDENTAL MINDORO21E00038 · ₱173,700,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 08789
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jun 6, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 08789); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
39 evaluations listed across 7 GPPB CPES releases; average final rating 92.9% over 17 rated projects; 39 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 25, 2025 | DPWH | ₱97,979,674.00 | Completed | 95.6% | 95.3% | 40th, p. 224 |
| May 5, 2025 | DPWH | ₱139,924,106.00 | On-going | 96.7% | — | 40th, p. 224 |
| Feb 18, 2025 | DPWH | ₱29,679,848.00 | Completed | 99.9% | 93.8% | 39th (rev), p. 152 |
| Feb 13, 2025 | DPWH | 98,999,347.720 (₱ thousands, as printed; flagged) | On-going | 95.2% | — | 40th, p. 224 |
| Dec 3, 2024 | DPWH | ₱208,920,819.00 | Completed | 92.3% | 92.3% | 39th (rev), p. 152 |
| Nov 30, 2024 | DPWH | ₱106,149,975.00 | Completed | 95.5% | 95.1% | 39th (rev), p. 152 |
| Aug 20, 2024 | DPWH (JV) | ₱97,917,468.00 | On-going | 86.6% | — | 38th, p. 175 |
| Aug 20, 2024 | DPWH | ₱29,402,387.00 | On-going | 91.2% | — | 38th, p. 175 |
| Aug 20, 2024 | DPWH | ₱106,149,975.00 | On-going | 94.8% | — | 38th, p. 175 |
| Jul 30, 2024 | DPWH (JV) | ₱241,249,949.00 | On-going | 96.3% | — | 38th, p. 176 |
| Apr 25, 2024 | DPWH | ₱45,128,223.00 | Completed | 93.4% | 94.4% | 39th (rev), p. 152 |
| Apr 24, 2024 | DPWH (JV) | ₱165,328,497.00 | On-going | 97.7% | — | 38th, p. 175 |
Showing the 12 most recent of 39.
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 592 awards · ₱41,673,227,393.95
- Province of Samar Infrastructure: 2 awards · ₱1,376,707,317.12
- City of Butuan Infrastructure: 15 awards · ₱1,138,539,635.51
- NIA Infrastructure: 6 awards · ₱725,768,993.42
- Subic Bay Metropolitan Authority Infrastructure: 4 awards · ₱609,337,934.54
- Province of Marinduque Infrastructure: 2 awards · ₱457,264,005.75
- Manila International Airport Authority Goods & services: 3 awards · ₱384,638,684.07
- Province of Benguet Infrastructure: 1 award · ₱183,947,194.56
- Municipality of Bamban, Tarlac Infrastructure: 1 award · ₱116,010,268.20
- Province of Bulacan Infrastructure: 1 award · ₱50,148,004.00
- Road Board Goods & services: 2 awards · ₱39,297,115.36
- DPWH Goods & services: 11 awards · ₱9,904,379.04
- Municipality of Victoria, Tarlac Goods & services: 2 awards · ₱9,895,960.26
- Municipality of Tagudin, Ilocos Sur Infrastructure: 2 awards · ₱7,468,231.54
- 25EA0058₱14,694,791.37· 2025-10-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MARINDUQUE DEO
- 25C00529₱189,127,389.12· 2025-08-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- 25C00513₱196,016,242.73· 2025-07-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- Procurement of Supply and Application of Paint Mat
- 25CL0092 - MARANGLA RIVER, DOWNSTREAM PACKAGE 1₱95,148,926.29· 2025-06-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ZAMBALES 1ST DEO
- 25CL0141 - STA CRUZ-MANGATAREM ROAD (PHASE 14)₱95,293,728.53· 2025-06-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ZAMBALES 1ST DEO
- 25CL0093 - MARANGLA RIVER, DOWNSTREAM PACKAGE 2₱95,168,203.75· 2025-06-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ZAMBALES 1ST DEO
- PROCUREMENT OF 1 LOT SUPPLY AND INSTALLATION OF EL
- Procurement of 1 Lot Supply and Installation of Ti
- 25D00275₱327,615,055.33· 2025-05-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- Procurement of 1 Lot Supply and Installation of LE
- 25CJ0195₱47,915,352.17· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25C00474₱47,770,308.41· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- 25CJ0276₱71,651,146.59· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0193₱72,022,830.44· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0202₱71,946,035.83· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- Butuan Logistical Seaport (Phase 2C-1)
- Butuan Logistical Seaport (Phase 2D)
- Construction of Butuan Center for Excellence-North
- 25D00020₱117,001,718.94· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- Construction of Command Center for Disaster Respon
- 25D00103₱80,249,358.12· 2025-02-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- 25CL0046 - IBA-BOTOLAN, BRIDGE 1₱33,792,242.87· 2025-02-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ZAMBALES 1ST DEO
- 24C00631₱98,505,185.42· 2025-01-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- Site Development of Butuan City Hall Complex
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →