Flood Control and Drainage24K00509

CONST. OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 7, MISAMIS ORIENTAL

CONST. OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 7, MISAMIS ORIENTAL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱118,801,990.39. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: EQUI-PARCO CONST CO. Figures trace to dpwh.

Region X, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱118,801,990 · EQUI-PARCO CONST CO

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-09-27 → 2026-09-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Misamis Oriental

Based on the coordinates published with the DPWH record and NOAH file MisamisOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 7, MISAMIS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24K00509

₱118,801,990.39 · EQUI-PARCO CONST CO

Award / contract ref: 24K00509

Contractor

B

725 projects · ₱77.9B total · 5 flags

4. Implementation

Contract Amount

₱118,801,990.39

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

December 16, 2024

Target End

December 10, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OrientalTagoloanSanta Ana
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.