CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱282,245,209.66. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ME 3 CONST. Figures trace to dpwh.
Total Contract Cost
