ME 3 CONST is listed as a company organization in Philippine public procurement records on this site, with 131 linked DPWH project(s) totaling about ₱11,733,051,935.80. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ME 3 CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 131
- Total value
- ₱11,733,051,935.80
- Published flags
- 0
- Region
- Region XIII · Region XIII
Public Record Grade
A transparent, data-derived summary of reported public records for ME 3 CONST — not an accusation or finding of wrongdoing.
Score: 85.70 / 100 · Projects in sample: 131 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 74.5/100 · Weight: 50%
- graceDays
- 30
- componentScore
- 74.5
- lateCompletedProjects
- 10
- onTimeCompletedProjects
- 103
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 129
- pastTargetOngoingProjects
- 16
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 22%
- totalProjects
- 131
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 98.5/100 · Weight: 22%
- avgOverrunPct
- 0.1
- componentScore
- 98.5
- projectsWithAbcAndCost
- 131
- projectsOver110PctOfAbc
- 1
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 131
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
Component score: 99.8/100 · Weight: 6%
- projects
- 131
- componentScore
- 99.8
- linkedObservations
- 1
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 124 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 15, LANAO DEL NORTE23K00112 · ₱289,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL23K00107 · ₱282,245,209.66 · mapped
- CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 3), BAYUG ISLAND, ILIGAN CITY23K00203 · ₱282,241,975.05 · mapped
- CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 4), BAYUG ISLAND, ILIGAN CITY23K00204 · ₱282,241,848.35 · mapped
- CONST. OF BY-PASS AND DIVERSION ROADS ,ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 18, LANAO DEL NORTE23K00075 · ₱243,365,215.35 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS, CDO - AIRPORT - BUKIDNON RD, K1456+ 176 - K1458 + 365, K1459 + 090 - K1459 + 44023K00195 · ₱235,204,378.11 · mapped
- CONSTRUCTION OF CDOC-ILIGAN HINTERLAND ROAD, (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/RORONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 17, LANAO DEL NORTE23K00127 · ₱233,987,594.92 · mapped
- BDRY. BUKIDNON/AGUSAN DEL NORTE, LAWAN-LAWAN SECTION, PACKAGE K, LAS NIEVES23N00083 · ₱208,439,986.71 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY ACLAN, NASIPIT, AGUSAN DEL NORTE24N00133 · ₱192,999,961.26 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY CULIT, NASIPIT, AGUSAN DEL NORTE24N00141 · ₱192,999,609.56 · mapped
- SURIGAO-AGUSAN WEST COASTAL RD, PACKAGE 9, AGUSAN DEL NORTE23N00033 · ₱169,848,626.20 · mapped
- CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS(KALSADA TUNGO SA PALIPARAN,RILES AT DAUNGAN PROGRAM-KATUPARAN) CDO-OPOL-EL SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD (PAGATPAT BR22K00270 · ₱168,726,513.71 · mapped
- CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, ESPERANZA (CROSSING LUNA) - SAN LUIS SECTION, ESPERANZA, AGUSAN DEL SUR15N00109 · ₱162,743,017.40 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (AMBACON SECTION) DOWNSTREAM, PHASE 2, LAS NIEVES, AGUSAN DEL NORTE24N00083 · ₱154,399,980.03 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (AMBACON SECTION) UPSTREAM, PHASE 2, LAS NIEVES, AGUSAN DEL NORTE24N00084 · ₱154,399,829.80 · mapped
- IMPROVEMENT/WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (SURIGAO - AGUSAN SECTION), K1168+050 - K1168+344, K1168+-094 - K1168+009, K1168+368 - K1168+444, K1169+711 - K1170+200, K1177+340 - K1180+102, KITCHARAO, AGUSAN DEL NORTE17N00005 · ₱152,633,069.98 · mapped
- Construction of Flood Mitigation Structure along Obod-obod Creek, Package 1, Butuan City, Agusan del Norte23N00113 · ₱144,749,994.70 · mapped
- SURIGAO-AGUSAN WEST COASTAL ROAD, PACKAGE H, SURIGAO DEL NORTE23N00129 · ₱144,749,882.06 · mapped
- NRJ MALAYBALAY ROAD TO NRJ BUTUAN CITY- CAGAYAN DE ORO-ILIGAN CITY ROAD, (BIT-OS TALO-AO SECTION), PACKAGE 4, BUTUAN CITY, AGUSAN DEL NORTE23N00078 · ₱144,749,867.40 · mapped
- DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)-K1182+812-K1183+780, K1183+820-K1184+892, K1199+435-K1199+709, K1200+291-K1200+318, K1200+318-K1200+683, K1202+627-K1203+000, K1203+231-K1203+249.50, K1203+249.50-K1203+258.5, K1203+258.5-K1203+328, K1204+912-K1205+0822N00166 · ₱144,727,821.36 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADS, IMPASUG-ONG BDRY. BUKIDNON (SILOO)-MISAMIS ORIENTAL (EUREKA), PACKAGE 25, BUKIDNON23K00136 · ₱143,004,665.73 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1432+605 - K1436+60525NI0060 · ₱140,406,990.69 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405 + 916 - K1407 + 343, K1409 + 000 - K1410 + 000, K1411 + 049 - K1412 + 52525NI0045 · ₱140,402,303.76 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1428+60525NI0049 · ₱140,398,484.14 · mapped
- BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 26, BUTUAN CITY23N00122 · ₱139,924,998.02 · mapped
- IMPROVEMENT/WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (AGUSAN - DAVAO SECTION), K1361+000 - K1364+000, AGUSAN DEL SUR17N00047 · ₱139,856,313.75 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAGSAYSAY-BUTUAN CITY COASTAL BYPASS/ ALTERNATE ROAD, MISAMIS ORIENTAL22K00016 · ₱137,489,130.13 · mapped
- Construction of Flood Control Structure along Naawan River Downstream of Naawan Bridge (Left Side), Package 1, Naawan, Misamis Oriental22K00224 · ₱137,480,516.60 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (DANKIAS SECTION) PACKAGE 2, BUTUAN CITY24ND0040 · ₱137,272,385.64 · mapped
- Construction of Flood Mitigation Structure along Agusan River (Dankias Section) Package 1, Butuan City24ND0039 · ₱137,272,357.60 · mapped
- BUTUAN CITY - MALAYBALAY RD- K1241+500 - K 1247+775, BUTUAN CITY22N00169 · ₱125,449,976.93 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS- ROAD TO SUPPORT RIVER RHINE CRUISE PROTECTING BANZA RUINS, BARANGAY BANZA, BUTUAN CITY19N00052 · ₱118,453,749.18 · mapped
- Construction of Flood Mitigation Structure along Banza River at Banza Ruins Section, Butuan City, Agusan del Norte22N00095 · ₱106,149,994.90 · mapped
- CONSTRUCTION OF GUINABSAN - LOMBUYAN ROAD (PHASE III), BUENAVISTA, AGUSAN DEL NORTE23N00161 · ₱106,149,992.18 · mapped
- NASIPIT- BUENAVISTA- MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE, PACKAGE E21N00147 · ₱106,149,812.17 · mapped
- CONSTRUCTION OF MACALANG- CABAG-AYAN- CULIT ROAD, BUENAVISTA, AGUSAN DEL NORTE22N00047 · ₱106,149,663.21 · mapped
- CONSTRUCTION OF GUINABSAN- LOMUYAN ROAD, BUENAVISTA, AGUSAN DEL NORTE22N00046 · ₱106,149,409.10 · mapped
- CONSTRUCTION OF SEASIDE BOULEVARD ALONG VILLANUEVA BAY, BARANGAY POBLACION 1 TO BARANGAY LOOC SECTION, PHASE 3, VILLANUEVA, MISAMIS ORIENTAL22K00185 · ₱105,309,893.34 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ILIGAN CITY CIRCUMFERENTIAL ROAD EXTENSION TO JCT. STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD, PACKAGE 4, LANAO DEL NORTE22K00012 · ₱101,325,000.00 · mapped
- EAST- WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ BUKIDNON AGUSAN- MALAYBALAY ROAD, PACKAGE 3, AGUSAN DEL SUR21N00125 · ₱101,324,997.88 · mapped
- EAST- WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ BUKIDNON AGUSAN- MALAYBALAY ROAD, PACKAGE 2, AGUSAN DEL SUR21N00124 · ₱101,324,996.75 · mapped
- JCT LINGIG - TRENTO RD (S00312MN) - K1472+(-647) - K1474+815.55, BISLIG, SURIGAO DEL SUR22N00010 · ₱101,324,906.96 · mapped
- BUTUAN CITY- CAGAYAN DE ORO CITY- ILIGAN CITY ROAD (AGUSAN- MISAMIS OR RD)- K1240+306- K1240+819, K1240+854- K1241+210, BUTUAN CITY21N00053 · ₱101,324,876.99 · mapped
- BUTUAN CITY WEST DIVERSION ROAD, PACKAGE 7, BUTUAN CITY23N00062 · ₱101,324,856.75 · mapped
- DAANG MAHARLIKA (AGUSAN-DAVAO SECT) - K1241+498 - K1243+80023N00042 · ₱101,324,568.94 · mapped
- ROAD TO SUPPORT RIVER RHINE CRUISE PROTECTING BANZA RUINS, BARANGAY BANZA, BUTUAN C ITY20N00034 · ₱101,324,554.70 · mapped
- ACCESS ROAD LEADING TO ALTAR FALLS, BUTUAN CITY, AGUSAN DEL NORTE23N00069 · ₱101,323,861.32 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG AGUSAN RIVER (DANKIAS SECTION), BUTUAN CITY, AGUSAN DEL NORTE20N00039 · ₱99,394,550.75 · mapped
- ACCESS ROAD LEADING TO ALTAR FALLS, BUTUAN CITY, AGUSAN DEL NORTE22N00142 · ₱98,696,235.80 · mapped
- ACCESS ROAD LEADING TO ALTAR FALLS, BUTUAN CITY, AGUSAN DEL NORTE21N00095 · ₱98,429,994.15 · mapped
Equipment & capacity
PCAB license
- License no.
- 31364
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Apr 28, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 31364); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
34 evaluations listed across 7 GPPB CPES releases; average final rating 95.0% over 9 rated projects; 34 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 24, 2025 | DPWH | ₱96,496,378.00 | Completed | 93.6% | 95.8% | 40th, p. 201 |
| Mar 25, 2025 | DPWH (JV) | ₱53,074,994.00 | On-going | 98.2% | — | 39th (rev), p. 135 |
| Mar 19, 2025 | DPWH (JV) | ₱96,500,000.00 | Completed | 98.7% | 94.1% | 39th (rev), p. 135 |
| Mar 18, 2025 | DPWH (JV) | ₱48,100,000.00 | On-going | 88.9% | — | 39th (rev), p. 135 |
| Nov 13, 2024 | DPWH | ₱133,129,017.00 | On-going | 95.2% | — | 40th, p. 201 |
| Aug 16, 2024 | DPWH (JV) | ₱96,015,803.00 | On-going | 91.1% | — | 38th, p. 156 |
| Aug 12, 2024 | DPWH | ₱95,496,335.00 | On-going | 97.2% | — | 38th, p. 156 |
| Apr 25, 2024 | DPWH | ₱71,323,906.00 | Completed | 94.3% | 96.8% | 39th (rev), p. 134 |
| Apr 23, 2024 | DPWH | ₱96,499,018.00 | On-going | 96.5% | — | 39th (rev), p. 135 |
| Apr 23, 2024 | DPWH | ₱83,955,000.00 | Completed | 96.5% | 97.2% | 38th, p. 156 |
| Apr 19, 2024 | DPWH (JV) | ₱101,324,936.00 | On-going | 96.0% | — | 38th, p. 157 |
| Apr 19, 2024 | DPWH (JV) | ₱44,099,574.00 | On-going | 85.8% | — | 38th, p. 156 |
Showing the 12 most recent of 34.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →