Construction of Mala-Lawasaig River Flood Control with Steel Sheet Pile and Slope Protection, Brgy. Lilod Baclayan, Ditsaan-Ramain, Lanao del Sur
Construction of Mala-Lawasaig River Flood Control with Steel Sheet Pile and Slope Protection, Brgy. Lilod Baclayan, Ditsaan-Ramain, Lanao del Sur is a DPWH-tracked public work in DITSAAN-RAMAIN (LANAO DEL SUR), LANAO DEL SUR, Region X. Reported contract value: ₱121,686,414.20. Status: Reported complete (DPWH). Contractor on record: M M A ACHIEVER CONST & DEVELOPMENT CORP. Figures trace to sumbong.
Total Contract Cost
